Iskra
Established Member
Nice! Thanks for sharing that nugget!Talking to a fellow Leeds driver yesterday. The Leeds-Westgate-Sheffield services staring in December will be operated with class 170’s.
Nice! Thanks for sharing that nugget!Talking to a fellow Leeds driver yesterday. The Leeds-Westgate-Sheffield services staring in December will be operated with class 170’s.
they were being worked on yesterdayIt was 2x escalators in the South Entrances turn to fail for my last week of commuting before I went on holiday on the 6th. And these are presumably much newer so don’t have the excuse of old age. The ones on the main overbridge are at least being replaced currently so hopefully the new design is more reliable.
At least one of them was a different one to last time.they were being worked on yesterday
Will any 170s will get pulled from either the Scarborough, or Harrogate services to allow for this?Talking to a fellow Leeds driver yesterday. The Leeds-Westgate-Sheffield services staring in December will be operated with class 170’s.
2 sit spare most of the day and 2 are on exams each day Mon - Fri. So I’m guessing at the moment that the unit diagrams will be getting tweaked. One of the Harrogates can be covered by the 2x 150’s that sit spare all day in platform 0. I’ll post an update when it gets sorted but will require 3 units to operate the Sheffield’sWill any 170s will get pulled from either the Scarborough, or Harrogate services to allow for this?
It will be interesting to see how they write the diagrams and adjustments needed to the timetable in the peak hour. The Harrogate line is also impacted by the East Coast timetable redraft.2 sit spare most of the day and 2 are on exams each day Mon - Fri. So I’m guessing at the moment that the unit diagrams will be getting tweaked. One of the Harrogates can be covered by the 2x 150’s that sit spare all day in platform 0. I’ll post an update when it gets sorted but will require 3 units to operate the Sheffield’s
It comes into effect from 1st July. Drivers using the pick up area (the outer lane (by the wall) of the arc - between the multi storey and Wetherspoons) will get 10 minutes maximum free of charge. A stay over 10 minutes results in an automatic £100 fine. Reduced to £60 if paid within 14 days. Blue badge holders parking in the designated disabled spaces will be allowed 30 minutes. The access road to the staff car park, alongside the multi storey, will be no parking on either side whatsoever. Needing to stay longer will require parking in the multi storey. Notices warning drivers are still to be posted.It’s not easy to tell from my garret, even with the 300mm lens on my camera, but I think a new CCTV camera has been bolted onto the multi-storey, close to the surface car park. I’m guessing it’s in connection with the new parking restrictions and will cover that end of the access road. Has anyone seen any cameras elsewhere? Or enforcement notices?
Those notices will have to go up soon… I’m assuming the No Waiting restriction will exclude taxis, as their space on Bishopgate Street/Sovereign Street isn’t ready yet. Hopefully it will cover the area near Wetherspoons where cars pull up randomly.It comes into effect from 1st July. Drivers using the pick up area (the outer lane (by the wall) of the arc - between the multi storey and Wetherspoons) will get 10 minutes maximum free of charge. A stay over 10 minutes results in an automatic £100 fine. Reduced to £60 if paid within 14 days. Blue badge holders parking in the designated disabled spaces will be allowed 30 minutes. The access road to the staff car park, alongside the multi storey, will be no parking on either side whatsoever. Needing to stay longer will require parking in the multi storey. Notices warning drivers are still to be posted.
Only the black n white taxi’s as they pay an annual fee to use the station. It doesn’t cover any other private hires or uber.Those notices will have to go up soon… I’m assuming the No Waiting restriction will exclude taxis, as their space on Bishopgate Street/Sovereign Street isn’t ready yet. Hopefully it will cover the area near Wetherspoons where cars pull up randomly.
Notices have now been fixed on the access road on the car parks side; just going in on the other side. Tomorrow will be… interesting. Even more “interesting” when the charges start to arrive.
== Doublepost prevention - post automatically merged: ==
If useful/of interest, this is the sign that's gone up. I didn't spot any around the old drop-off area, where cars are still dropping off. Last evening, two cars waiting in front of one of the notices, which is just daft. Another car parked up at the far end of the access road, then moved up towards the Princes Square car park entrance - technically, two fines!
The access road is narrow. At the station building end you end up making it difficult to enter and exit the car park, and block the goods area.This car park is a complete horror show and they keep making it worse. Demand for rail is only increasing and with no parkway station (well you could technically call Wakefield one but it's a long way out for much of Leeds, especially to the north of the city) the pressure is only going to increase, it's simply not fit for purpose.
Space is tight so what I don't understand is why they're not making use of the ground floor of the multistorey and the side road to allow some space for traffic to circulate and wait. Instead we're getting fines and a lot more stress it seems.
As the land will probably be governed by byelaws only the driver can be asked to pay any invoices, not the registered keeper.I'm no lawyer, but could anyone argue that they weren’t *parking* but *waiting*, when the fine comes through the post? I doubt Apcoa would err on a point of law where money is concerned, but I had the thought.
My photo, and I still got it wrongAs the land will probably be governed by byelaws only the driver can be asked to pay any invoices, not the registered keeper.
Unfortunately this isn't an APCOA site (signs mention UKCPS). APCOA know the byelaw 'wrinkle' and generally don't put up a fight if you let them know in an appeal that you know the law.
One improvement they could make would be to provide some rubbish bins. What do they expect passengers to do with the used coffee cups etc other than throw onto the tracks?
As the land will probably be governed by byelaws only the driver can be asked to pay any invoices, not the registered keeper.
Extended Platform 14? A typo for 17?Rail Network Enhancement Pipeline (RNEP) schemes – funding confirmed (08 July 2025)
View attachment 183330
Not necessarily. But hopefully!Extended Platform 14? A typo for 17?
Possibly. I mean, if you were to build a new, accessible eastern footbridge then a separate entrance might be useful. Rather like LSSE it is now a constricted construction site (Google Streetview hasn't been updated but there is a new hotel there). It would mean you could park in the Q-Park on Swinegate and walk round (I always felt there should be a footpath from the Trinity Leeds car park to the station).Either that is a spectacular copy and paste failure from an ancient document or..erm...something onto Sovereign Place/Pit Row maybe at a guess?
The trinity leeds car park has a main foot entrance on new station street. Can't get a more direct path really.Possibly. I mean, if you were to build a new, accessible eastern footbridge then a separate entrance might be useful. Rather like LSSE it is now a constricted construction site (Google Streetview hasn't been updated but there is a new hotel there). It would mean you could park in the Q-Park on Swinegate and walk round (I always felt there should be a footpath from the Trinity Leeds car park to the station).
Thing is, LSSE was designed to take 25% of passengers away from the main concourse/entrances. Patronage at Leeds isn't close to pre-pandemic levels. Is a new/additional entrance a necessity, or is the assumption that by the time it's planned, consulted upon and built numbers will be up again?
Not a typoExtended Platform 14? A typo for 17?
Patronage at Leeds is a lot higher than what is shown by the ORR figures. Footfall inside the station is much closer to pre pandemic levelsPossibly. I mean, if you were to build a new, accessible eastern footbridge then a separate entrance might be useful. Rather like LSSE it is now a constricted construction site (Google Streetview hasn't been updated but there is a new hotel there). It would mean you could park in the Q-Park on Swinegate and walk round (I always felt there should be a footpath from the Trinity Leeds car park to the station).
Thing is, LSSE was designed to take 25% of passengers away from the main concourse/entrances. Patronage at Leeds isn't close to pre-pandemic levels. Is a new/additional entrance a necessity, or is the assumption that by the time it's planned, consulted upon and built numbers will be up again?
Improving services in the Leeds area
Works around Leeds to improve services will continue. These will support additional services to and through Leeds, ease congestion, and improve reliability for passengers in the area. Services into Leeds have been overstretched for too long and this scheme will address these issues, reducing delays for passengers. The programme has already delivered a new LNER service between London and Bradford and ongoing work will allow for longer trains and greater capacity at Leeds, meaning better connectivity for people in the region.
Is that "G" as in "next to F" - just for services via Woodlesford?Also of note from the same press release -
![]()
Green light for over 50 road and rail upgrades supporting over 39,000 new homes and 42,000 jobs
Commuters and businesses to benefit from quicker journeys as more than 50 road and rail upgrades are agreed.www.gov.uk
Could this include the rumoured new 'G' line to increase capacity into Leeds?