lrbvoyager
Member
- Joined
- 2 Jan 2025
- Messages
- 372
Does anyone know when these will reach Edinburgh and Glasgow?
No plans currently for them to run in service. No Scottish crew have been trained on them.Does anyone know when these will reach Edinburgh and Glasgow?
There is no plans. Liverpool and Preston/Blackpool are as far north as they are booked to go.Does anyone know when these will reach Edinburgh and Glasgow?
I spoke to a driver and he said that he reckons they will be trained on them soon.No plans currently for them to run in service. No Scottish crew have been trained on them.
Considering that there are no plans to run them on the routes that Scottish crews sign I don't see how this is likely. Preston crews are trained for them, but only for running to Blackpool and back.I spoke to a driver and he said that he reckons they will be trained on them soon.
Most likely messroom gossip/ rumours. There's not enough of them to send into Scotland. Plus they'd never keep to time at max 110mph.I spoke to a driver and he said that he reckons they will be trained on them soon.
Wonder if 805s as a diversion when these several weeks of full week closures on the northern part of wcml?Most likely messroom gossip/ rumours. There's not enough of them to send into Scotland. Plus they'd never keep to time at max 110mph.
If so they would need to reduce the north wales route either by short forming or cancelling trains as there just aren't enough to go round. I'm sure the requirements either from May or starting September are 11/13 required in service which leaves little room to move elsewhere.Wonder if 805s as a diversion when these several weeks of full week closures on the northern part of wcml?
Invoke emergency timetable like they have done when other blockades, eg the other week in Crewe area. Where north wales becomes a shuttle between Crewe and Holyhead etcIf so they would need to reduce the north wales route either by short forming or cancelling trains as there just aren't enough to go round. I'm sure the requirements either from May or starting September are 11/13 required in service which leaves little room to move elsewhere.
There are still plans to operate them via Settle during an engineering block, but the plans are still being drawn up and confirmed. Drivers won't be learning the route, freight drivers will be used, but I'm not sure what they'll do about the driving itself.Most likely messroom gossip/ rumours. There's not enough of them to send into Scotland. Plus they'd never keep to time at max 110mph.
Preston Drivers I presume? They take the trains to Blackpool alreadyThere are still plans to operate them via Settle during an engineering block, but the plans are still being drawn up and confirmed. Drivers won't be learning the route, freight drivers will be used, but I'm not sure what they'll do about the driving itself.
Makes you wonder why only 13 805s were ordered despite replacing 20 221s?If so they would need to reduce the north wales route either by short forming or cancelling trains as there just aren't enough to go round. I'm sure the requirements either from May or starting September are 11/13 required in service which leaves little room to move elsewhere.
Because 10 807s were also ordered as a part of that replacement. No point in ordering more bi-modes than required for normal service since it will just result in more maintenance needed.Makes you wonder why only 13 805s were ordered despite replacing 20 221s?
Because the total order was larger, with 13 805s and 10 807s. Overall, it is an increase in fleet size, especially on a seat number basis.Makes you wonder why only 13 805s were ordered despite replacing 20 221s?
There was a little more to this. I am not familiar with North of the border route knowledge, but I gather that a key diversionary route is unwired & was used by the 221 fleet & using 805s was mooted. Truth is probably someone in an office looked at a paper idea without knowing the implications.Most likely messroom gossip/ rumours. There's not enough of them to send into Scotland. Plus they'd never keep to time at max 110mph.
There was a suggestion on the forum at one point that it would make more sense to use bi-modes operated by TPE on diversions via Dumfries than Avanti bi-modes, not least because a TPE 802 already works a Manchester to Edinburgh diagram.I am not familiar with North of the border route knowledge, but I gather that a key diversionary route is unwired & was used by the 221 fleet & using 805s was mooted.
They go no futher than Carlisle in that plan.There are still plans to operate them via Settle during an engineering block, but the plans are still being drawn up and confirmed. Drivers won't be learning the route, freight drivers will be used, but I'm not sure what they'll do about the driving itself.
Because quite a few services that were being run by 221s were on routes that had been fully electrified since the 221s were built, and so could now be run by 807s or 390s.Makes you wonder why only 13 805s were ordered despite replacing 20 221s?
They go no futher than Carlisle in that plan.
Emergency timetables for Avanti are hardly practical now as train crew diagrams have drivers & TMs all over the place. When disruption happens they tend to end up chasing trains around the country & it takes all day for the service to recover as drivers with required hours, route & traction knowledge bomb burst across the network. Its productivity, apparently.Invoke emergency timetable like they have done when other blockades, eg the other week in Crewe area. Where north wales becomes a shuttle between Crewe and Holyhead etc
Seen lots of discussion on ‘X’ which I now can’t find about TOCs looking at alternative plans to try keep people on trains and not busses with the wcml closures.
Emergency times table for a specific period - EG engineering timetable, as I stated in my post!Emergency timetables for Avanti are hardly practical now as train crew diagrams have drivers & TMs all over the place. When disruption happens they tend to end up chasing trains around the country & it takes all day for the service to recover as drivers with required hours, route & traction knowledge bomb burst across the network. It’s productivity, apparently.
Its not really an emergency timetable if its planned, just a short term alteration.Emergency times table for a specific period - EG engineering timetable, as I stated in my post!
Am not on about when disruption occurs on a single day.
When line was blocked for engineering work south of Crewe, the north Wales line becomes a shuttle from Crewe.
That is the sort of thing I am implying.
Planned alterations, with all diagrams of crew and rolling stock pre-planned to correct timescales.
It’s okay, the relevant teams responsible can always just blame the control for not putting things back together.Emergency timetables for Avanti are hardly practical now as train crew diagrams have drivers & TMs all over the place. When disruption happens they tend to end up chasing trains around the country & it takes all day for the service to recover as drivers with required hours, route & traction knowledge bomb burst across the network. Its productivity, apparently.