• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Transport for Wales Class 231 / 756 Stadler FLIRTs

J663738

Member
Joined
20 May 2025
Messages
339
To save anyone the bother here's a photo of the 756 at Penarth (5Q11) very quiet. 8-)

PS I think turbulence is the last thing to worry about for trains 'passing' at Penarth
 

Attachments

  • Penarth 756.jpg
    Penarth 756.jpg
    297.3 KB · Views: 232
  • Penarth Sign.jpg
    Penarth Sign.jpg
    208.2 KB · Views: 233
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

StripeyNick

Member
Joined
25 Apr 2012
Messages
411
Location
Cowbridge, S.Wales
To save anyone the bother here's a photo of the 756 at Penarth (5Q11) very quiet. 8-)

PS I think turbulence is the last thing to worry about for trains 'passing' at Penarth
Saves me going out then. I've been keeping an eye on RTT just in case they started later in the day but once the allocated 756111 was removed, that pretty much sealed the fate of the other workings

That turbulence sign has always amused me. If that were to happen there, I think I'd be worried about more than turbulence!!
 

Bob Price

Established Member
Joined
8 Aug 2019
Messages
1,243
I was up at Coryton filming some bit of the local industrial landscape and watching the diagrams. See if they run tomorrow evening.
 

D1053WP

Member
Joined
9 Sep 2024
Messages
15
Location
Retford
Does anyone know which 756s are currently at Barry. 756006 can be clearly seen at the east end. There is one behind the depot and two others at the West end obscured by undergrowth. Does anyone know which these are please
 

Gordonman

Member
Joined
14 Jan 2020
Messages
629
Location
Baildon
Does anyone know which 756s are currently at Barry. 756006 can be clearly seen at the east end. There is one behind the depot and two others at the West end obscured by undergrowth. Does anyone know which these are please
Should be 756001,756002 and 756003
 

wickham

Member
Joined
3 Feb 2021
Messages
707
Location
Knaphill
Should be 756001,756002 and 756003
756001 was observed at Canton 29.05.25, by a process of elemination on 29.05.25 when all other 756/0s were seen, the two in the undergrowth at Barry Stadler Depot must be 756002 and 756003. The two at the other end of the depot on this date were 756006 and 756110 (clearly identified from passing train).
 

nigelsporne

Member
Joined
20 Dec 2012
Messages
428
Location
Coleshill
With the impending closure of the Rhymney line for electrification work will the number of Class 231s in service on a daily basis change? Will the Class move onto other services during these periods?
 

Bob Price

Established Member
Joined
8 Aug 2019
Messages
1,243
Probably on the TAM lines, but I don't think they have the drivers trained yet to put them up to Ebbw Vale, Maesteg and Gloucester which is where they are planned to end up.
 

Cardiff123

Established Member
Joined
10 Mar 2013
Messages
1,657
Location
South Wales
With the impending closure of the Rhymney line for electrification work will the number of Class 231s in service on a daily basis change? Will the Class move onto other services during these periods?
The 231s will either go over to the TAM lines or will go spare. During the recent closure, several diagrams were Caerphilly - Barry Island - Caerphilly - Bridgend - Caerphilly - Barry Island etc, so that limits 150s to most diagrams when Rhymney - Caerphilly is closed.
 

BillStampy

Established Member
Joined
6 Jan 2024
Messages
1,612
Location
Llanharan
It's not ideal that the 756s to Coryton haven't had any of their paths run this week, I'm unsure if it'll hit the deadline for some point this summer at the current rate.
 

Bob Price

Established Member
Joined
8 Aug 2019
Messages
1,243
If anyone fancies a night trip look up 5Q20 running Barry Tourist Railway to Caerphilly passing Heath Junction at 01.29. Back at 03:01 on 5Q23. Schedule 14 June so early hours of tomorrow morning

== Doublepost prevention - post automatically merged: ==

Looks like 756106 did Barry Depot to Caerphilly and back in the early hours of Saturday morning. That must be the first 756 on the line.
 
Last edited:

AdamWW

Established Member
Joined
6 Nov 2012
Messages
5,995
If anyone fancies a night trip look up 5Q20 running Barry Tourist Railway to Caerphilly passing Heath Junction at 01.29. Back at 03:01 on 5Q23. Schedule 14 June so early hours of tomorrow morning

== Doublepost prevention - post automatically merged: ==

Looks like 756106 did Barry Depot to Caerphilly and back in the early hours of Saturday morning. That must be the first 756 on the line.

No - there was an overnight test run with a 4 car 756 a while back, that even made it to Coryton.
 

Bob Price

Established Member
Joined
8 Aug 2019
Messages
1,243
There are more moves scheduled for Sunday between Coryton and Penarth. 5Q10 and 5Q11 in the morning and then 5Q18 and 5Q19 in the afternoon. We will see if they run.
 

AdamWW

Established Member
Joined
6 Nov 2012
Messages
5,995
There are more moves scheduled for Sunday between Coryton and Penarth. 5Q10 and 5Q11 in the morning and then 5Q18 and 5Q19 in the afternoon. We will see if they run.

Also scheduled to run between Caerphilly and Penarth.

According to a post in the South Wales Metro thread, the overhead power is off on the Coryton line at the moment.
 

tfw756rider

On Moderation
Joined
30 Nov 2024
Messages
1,988
Location
Wales (sometimes in England), thanks for replying!
756006 entered service today!
Thanks for letting us know :)

This now means that 21 (of 24) 756s have been in service.

4 (of 7) 3-coach 756s have been in service (756004/005/006/007)

All 17 4-coach 756s have been in service (756101/102/103/104/105/106/107/108/109/110/111/112/113/114/115/116/117)

=========================

The number of 756s still to enter service is down to 3, all of which are 3-coach units (756001/002/003)

=========================

The overall number of new Transport for Wales (TfW) trains that have been in service is now up to 98 (of 148):

40 (of 51) 197/0s
All 26 197/1s
All 11 231s
4 (of 7) 756/0s
All 17 756/1s

This leaves 50 new TfW trains still to enter service:

11 197/0s
36 398s
3 756/0s
 

J663738

Member
Joined
20 May 2025
Messages
339
I wonder are the failure to do these Sunday test runs a direct result of the Sunday Driver cap? Just image if any other company had an agreement like this with their work force!

This was a FOI to TfW from a few years back.

Question to TfW:
“I would also be grateful for clarity in terms of how many Sundays drivers are currently required to work in a year as part of the current contract.”

TfW Answer:
The driver agreements inherited by TfW Rail from the previous private sector operators do not cap the number of Sundays an individual driver works. Rather, the total number of Sundays that can be rostered for train drivers across the company is capped at 168. Drivers who are rostered to work Sundays as part of that 168 have a contractual obligation to work. However, once leave, sickness and other reasons for absence are taken into account, fewer than 168 drivers are actually available. This leads to reliance on drivers volunteering to work “additional Sundays” for which they are paid at an enhanced rate. As the amount of Sunday mileage has increased in the timetable, the 168 cap has further tipped the balance towards reliance on overtime. Even as the overall driver population increases in readiness for future timetable enhancements, under the current agreements, the 168 cap remains absolute. There have been a number of attempts to increase the cap, but none have so far been agreed with the company council reps. This is why a “Sundays inside the working week” solution provides a more long-term answer to the security of Sunday cover.​
 

Lewisham2221

Established Member
Joined
23 Jun 2005
Messages
2,751
Location
Staffordshire
I wonder are the failure to do these Sunday test runs a direct result of the Sunday Driver cap? Just image if any other company had an agreement like this with their work force!

This was a FOI to TfW from a few years back.

Question to TfW:
“I would also be grateful for clarity in terms of how many Sundays drivers are currently required to work in a year as part of the current contract.”

TfW Answer:
The driver agreements inherited by TfW Rail from the previous private sector operators do not cap the number of Sundays an individual driver works. Rather, the total number of Sundays that can be rostered for train drivers across the company is capped at 168. Drivers who are rostered to work Sundays as part of that 168 have a contractual obligation to work. However, once leave, sickness and other reasons for absence are taken into account, fewer than 168 drivers are actually available. This leads to reliance on drivers volunteering to work “additional Sundays” for which they are paid at an enhanced rate. As the amount of Sunday mileage has increased in the timetable, the 168 cap has further tipped the balance towards reliance on overtime. Even as the overall driver population increases in readiness for future timetable enhancements, under the current agreements, the 168 cap remains absolute. There have been a number of attempts to increase the cap, but none have so far been agreed with the company council reps. This is why a “Sundays inside the working week” solution provides a more long-term answer to the security of Sunday cover.​
The final sentence, which I've highlighted in bold, is the only relevant part of that response.

Sundays are now inside the the working week for drivers (and guards) at TfW.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,376
Location
belfast
The final sentence, which I've highlighted in bold, is the only relevant part of that response.

Sundays are now inside the the working week for drivers (and guards) at TfW.
Is that a new development? When was that agreed?

Good to see the sunday problem being resolved in any case!
 

Top