sprinterguy
Veteran Member
Well, GNER suggested getting two Pendolinos when Virgin first ordered theirs around the turn of the Millenium, so I'm sure half a dozen now wouldn't be at all unfeasible!Thanks for the link. I'd seen reference to four diagrams a day, but without a link so wasn't sure whether to accept it. Hmm, our HSTs a day (which presumably needs five trains to cover) would double the amount of HSTs at XC if only they could be freed up. Hmm, is it getting too silly to suggest that East Coast order half a dozen 390s if there's twenty-odd Pendolini ordered for the WCML franchise - it'd be cheaper to order as a follow-on order after all. Maybe even an extra unit to replace the XC Glasgow service?
I think if the four "all electric" HST diagrams were replaced one way or another, I think the best that could be hoped for is the cascade of the four HSTs that are directly replaced. East Coast diagram twelve HSTs out of thirteen every day (Currently thirteen out of fourteen with the EMT set), which is pretty intensive diagramming already without losing one more HST than has been replaced by electric stock.
If there were thirty five 225s, then everything would be fine. However the 225s will be sticking around until HS2 is in operation (to Leeds) I would think, at which point there will be a completely different rolling stock requirement on the ECML to what there is now, so no hope of rectifying the current situation with new stock at any point in the future.