WLO route
• TfL is working jointly with the West London Alliance of boroughs on developing the WLO scheme
• The scheme has four core objectives focused on:
1) Enhancing orbital public transport connectivity
2) Enabling and optimising the delivery of new homes and jobs
3) Enhancing public transport capacity to relieve pressure on existing corridors
4) Delivering wider economic, environmental and social benefits, reducing inequalities
• We have been working with Network Rail who have undertaken timetable assessment, traction power modelling and internal sponsorship activities for the scheme
WLO would deliver a substantial increase in public transport connectivity in west London
• An extra half a million people can reach Old Oak Common within an hour
• Substantial increase in public transport accessibility improving scale, rate and value of development
• Reduced public transport crowding, particularly on radial routes
An interesting presentation setting out the issues. Somewhat amazed that this might actually happen but guess that there are still a lot of hurdles to get through yet.Another You Tube video on the West London Orbital Railway has appeared this month.
But ... the timelines! Even if the all funding is agreed, permission granted on schedule, and everything else runs to plan, then it will be 2034 before it's ready for passengers (see video at 46:06). This is for adding passenger services to an existing set of railways, with no additional land required or houses being compulsory purchased or anything else of that scale. It seems incredible that such seemly self-contained projects run at such a glacial pace.
My bold. There is additional land required, and probably compulsory purchase - or at least the project will need to plan on the basis of compulosry purchase to cover the risk that the current owners of the land required are not ”willing sellers”. Certainly an Order under the Transport and Works Act is required, and from where they are now in the process that is at least three years away.
I'm very interested in the siting of the platforms at Old Oak Common Lane* station and of the Mildmay platforms at the same site (which I assume have to come at some time in the future). It looks to be 'on the edge (literally)' whether there will need to be compulsory purchase of land. The interesting thing is that one side of the track is residential and the other undeveloped. Obviously they would prefer to purchase the undeveloped land (if they need to). My question is, apart from the 'political/PR' aspects, is the process or the other formal legal hurdles to cross different for residential and non-residential land?- or at least the project will need to plan on the basis of compulosry purchase to cover the risk that the current owners of the land required are not ”willing sellers”. Certainly an Order under the Transport and Works Act is required, and from where they are now in the process that is at least three years away.
My question is, apart from the 'political/PR' aspects, is the process or the other formal legal hurdles to cross different for residential and non-residential land?
I think if Mildmay platforms aren't there when WLO is built, there will be a north entrance on Victoria Rd only, at least initially. A south entrance via a subway tunnel could be added later part of the OOC Lane station development and if the Mildmay station is there at time of construction, then it's likely the south entrance will be created immediately. There'd be a question whether the N entrance as planned is worth building at all or whether a continuation of the subway path to an alternative intersection with the road would be a better option.I'm very interested in the siting of the platforms at Old Oak Common Lane* station and of the Mildmay platforms at the same site (which I assume have to come at some time in the future). It looks to be 'on the edge (literally)' whether there will need to be compulsory purchase of land. The interesting thing is that one side of the track is residential and the other undeveloped. Obviously they would prefer to purchase the undeveloped land (if they need to). My question is, apart from the 'political/PR' aspects, is the process or the other formal legal hurdles to cross different for residential and non-residential land?
* a.k.a. Old Oak Common - Victoria Road (even though I don't think the entrance will be on Victoria Riad)
The plans show two footbridge alternatives. Both go to OOC LaneI think if Mildmay platforms aren't there when WLO is built, there will be a north entrance on Victoria Rd only, at least initially. A south entrance via a subway tunnel could be added later part of the OOC Lane station development and if the Mildmay station is there at time of construction, then it's likely the south entrance will be created immediately. There'd be a question whether the N entrance as planned is worth building at all or whether a continuation of the subway path to an alternative intersection with the road would be a better option.
Some early concepts I saw of the wider complex showed a subway roughly in this location for TfL platfrom access, which could be better from a level change perspective for HS2/GWR/EL interchange. The general site of the HS2 terminal is some 8m lower than OOC lane at this point which is ~2m above the Mildmay tracks. With a footbridge over the tracks you'll have to climb up to OOC Lane (the street), cross it on the flat (with all its additional buses) then scale a footbridge to gain access to the TfL station. Lots of lifts or ramps for that too. Looks like the northern bridge location avoids an apartment block. Maybe there's some reason a subway would be impossibly difficult or expensive.The plans show two footbridge alternatives. Both go to OOC Lane
This one:There is a concept illustration here from 2016 - just scroll down
It shows a broad footbridge across the rail lines but a foot crossing over the road. Interestingly, it doesn't show the platforms on the Dudding Hill Line, as they hadn't thought about it yet.

I think the 2016 illustrations have been overtaken by the OPDC Local Plan (mid 2022).With a footbridge over the tracks you'll have to climb up to OOC Lane (the street), cross it on the flat (with all its additional buses) then scale a footbridge to gain access to the TfL station. Lots of lifts or ramps for that too. Looks like the northern bridge location avoids an apartment block. Maybe there's some reason a subway would be impossibly difficult or expensive.
An option I havent seen suggested is for the entire Overground service from Clapham Junction to use the existing curve just south of Willesden Junction (without platforms) and reverse at a new single bay platform between the lines at Acton Wells Junction, before heading up the Dudding Hill line to Harlesden (Bakerloo interchange) and Hendon. The entire Overground service from Stratford would call at the nearby new pair of platforms before heading half to Richmond and half to Hounslow. Thus all Overground services would call at 3 nearby platforms (with one set of staff), and all services towards South Acton would use one platform instead of two different ones, and all services towards Gospel Oak would use one platform instead of two different stations a kilometre apart .
I think on paper it is possible (100m trains are much quicker to turn than 200m+ intercity trains), but it would be insanely vulnerable to any disruption. Not worth the risk and complexity imo.I think that means 20 through movements plus 8-10 turnback movements through Acton Wells in the peak hours, plus frieght. I can’t see how that can be timetabled. (Nor how to turn 8-10 services off one platfrom each hour).
The journey planner usually sends WLL / NLL journeys via Central London, so for Caledonian Road & Barnsbury to Shepherds Bush it might tell you to get the *eastbound* train to change at Highbury and Oxford Circus rather than get the through westbound train. Unless you are disabled, keeping the NLL connected to the WLL is of little use.And even if it was possible, I don't think people on the Clapham branch would be very happy about swapping direct trains to Camden/Highbury/Stratford for direct trains to Harlesden and Hendon.
Even Highbury and Islington is much faster to reach by taking SWR to Vauxhall and the Victoria line from there, and as for anywhere further along on the line, the time savings of going via Vauxhall or Waterloo Tube are even bigger. An hour and five minutes to Stratford is not attractive when you can do it in half an hour via Waterloo and the Jubilee.And even if it was possible, I don't think people on the Clapham branch would be very happy about swapping direct trains to Camden/Highbury/Stratford for direct trains to Harlesden and Hendon.
Why? There are about half the number of trains over it than there were 5 years agoSome points from Mansfield video that railwaysceptic linked. This looks like a pdf of the presentation
A north facing bay at Old Oak Common Lane, not yet decided which side this will be. There are well advanced plans of the two options (in a public PDF?). This is for extra Hendon-OOCL services.
Wood Lane level crossing in Hounslow (east of Isleworth station) is now(?) a concern. This may be because WLO is no longer an X but a Y, all southbound trains will go to Hounslow.
Some sidings will be made north of Old Oak Common Lane station, on the west side, north of the canal, south of the WCML. https://www.google.co.uk/maps/place//@51.5301143,-0.2478009,344m Further sidings at Wembley C.
The extra lines of the four tracking of Acton Wells Junction looks like it is only for from northeast to southeast, ie Mildmay only.
Why? There are about half the number of trains over it than there were 5 years ago
The London Overground trains using the West London Line are heavily patronised. Evidently a lot of people find the current service useful.Even Highbury and Islington is much faster to reach by taking SWR to Vauxhall and the Victoria line from there, and as for anywhere further along on the line, the time savings of going via Vauxhall or Waterloo Tube are even bigger. An hour and five minutes to Stratford is not attractive when you can do it in half an hour via Waterloo and the Jubilee.