YorksLad12
Established Member
If you're on a train on P17, a departing TPE service from P16 certainly feels close.From the satellite view, I don't really understand how moving the track would work - it looks like each track that you move will have further knock-on effects right across the station! If that is the plan, obviously I'm missing something! Maybe the tracks for P15/16/17 are actually a bit further apart presently than they really need to be for clearances, or something like that?
We must have spoken to different people! A new bridge wasn't on the cards, just a wider circulation area. It's all staying within the current station envelope though.I was there also there yesterday. Very helpful and wide ranging discussion I wish I'd recorded. Slewing tracks just enough to allow 17 to be widened and extending tracks further to allow trains from the Sheffield direction to enter the station without crossing others. There's a new bridge to cross the station with better lifts.
Like YorksLad12 I'd really like to have seen specific plans and mock ups but they may be available when it gets specifically authorised. Like all railway projects it's not yet a done deal although work could start by the end of 2025.
It's going to be very disruptive for rail users and those operating and using businesses around Granary Wharf. Whether they can bring any materials in by canal is under consideration - maybe a token barge for PR reasons?
Southern Entrance was built by floating things up the river from Water Lane (the bit beyond Asda), so who knows? While I'd like to see drawings I think I'd rather see a project plan. I still think they might do the work during a TPE closure, and there's too much to do in a Christmas closure; you might be able to do the platform work and track slewing but not the lift-moving element. In that case, it might be better to do the lift first so that you only lose P17 for a while, not 16 & 17 at the same time (the existing lift doesn't need to be fully decommissioned at the same time).