What sleepers were in use when Mallard set the speed record?

Status
Not open for further replies.

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,365
Moderator note: split from
Can it accommodate an increase in linespeed through? 75mph to 90mph I believe is the plan.
what sleepers were in use when Mallard set the speed record, or for the LMS attempt (which didn't wreck their loco?)

== Doublepost prevention - post automatically merged: ==

I will answer my own (somewhat rhetorical) question:

It seems that after the very early days UK rails were laid almost exclusively on timber sleepers until part-way through WW2, when timber shortages and the need for pit-props and sleepers for reconstructing continental lines after D-Day put the pressure on. Improvements in reinforced-concrete technology after the war made them a success and the rest is history!
So all our main lines and speed records would have been on conventional timber-sleepered track up to the war - and any worries about the ablity of wooden sleepers to cope with trains at 90 mph are completely without foundation (ouch!)
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
13,044
Location
Up the creek
They would have been either 9’ long, which was the standard length until around 1930, or 8’6”, which was the standard thereafter. The change was because track panels with the shorter ones can fit in the loading gauge when on a wagon. The GWR used Baltic Redwood, but I don’t know if the LNER used the same.
 

Western 52

Established Member
Joined
19 Jun 2020
Messages
1,672
Location
Burry Port
The GWR experimented with steel sleepers, maybe before WW2? There were several locations I think, and some were on what is now the Gwili Railway. Maybe still there?
 

John Webb

Established Member
Joined
5 Jun 2010
Messages
3,786
Location
St Albans
.....It seems that after the very early days UK rails were laid almost exclusively on timber sleepers until part-way through WW2, when timber shortages and the need for pit-props and sleepers for reconstructing continental lines after D-Day put the pressure on. Improvements in reinforced-concrete technology after the war made them a success and the rest is history!.....
The Building Research Establishment at Garston, just north of Watford, carried out a major investigation into concrete railway sleepers in 1942, including measurements of the the forces acting on sleepers on a main line. This lead to the development of the design of the first prestressed concrete sleepers. (Information from 'Science and Building' by F M Lea, HMSO 1971.)
 