The current diagrams are already setup for 2x230s out all day on 2 diagrams. The second one finishes at Wrexham Central around 2030 before running back empty to Birkenhead North. I'm not sure what margins TFW are wanting, but in theory only 2 need to be available and both can go in service at the same time, as one can rescue the other if required.
Theyre currently running STP (short term plan), with the diagram ive just mentioned being covered by a 197. The 197 currently runs empty from Central to General platform 3, forming the Shrewsbury service at around 9pm. No idea how that service will work when the 230 runs the diagram as the long term plan has the ECS from Central going back to Birkenhead North. Presumably a unit will come from Chester instead to work the Wrexham-Shrewsbury service.
In other words its all ready to go for 2x230 operation, presumably it's a step closer now they've been trying units all day on 1 diagram. They've been behaving nicely too.
As somebody who works them, I can echo the above comments, it's the 197s that are causing the problems lately and has been for a while. Havnt heard of a 230 having to limp back to base for a long long time.