I'd love to know how much public money has been blown on a possible Portishead reopening with nothing tangible to show for it.

You can't blame that on the project, rather Westminster's inability to get on with anything.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,106
Location
West Wiltshire
BBC are reporting Portishead could be fast tracked construction per North Somerset Council (if Government pays)

Restoring the rail line between Bristol to Portishead could be "fast-tracked", with construction beginning this year and the first trains running by 2027.

North Somerset Council leaders have approved measures to start construction - if the government agrees to fund the project.

Plans to bring the line back came under threat after the new Labour government announced it was axing the scheme's funding.
Councillor Mike Bell, leader of the council, said the government is now reviewing the project and there have been "encouraging indications that it is being fast-tracked".

The full council meeting on 14 January was told construction of the Portishead line had been set to begin last year and £32m had already been spent on the project.

Restoring the line only requires about three miles of new track, according to the Local Democracy Reporting Service.

 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,327
Location
Yorks
Getting things underway quickly could be a bit of a carrot to get Government to commit. Unfortunately with the ongoing economic situation I'm not sure the government will bite, sadly.
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,892
Location
South Wales
Getting things underway quickly could be a bit of a carrot to get Government to commit. Unfortunately with the ongoing economic situation I'm not sure the government will bite, sadly.
I think the uk government will pay for Portishead it's a good piece of good news when we are probably going to see a pause on a few projects.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,327
Location
Yorks
I think the uk government will pay for Portishead it's a good piece of good news when we are probably going to see a pause on a few projects.

Indeed - although there is now a piece in the news about preventing unnecessary hold ups with infrastructure projects, so perhaps that could be another positive:


BBC said:
PM vows to curb "NIMBY" legal blocks on infrastructure
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,106
Location
West Wiltshire
Getting things underway quickly could be a bit of a carrot to get Government to commit. Unfortunately with the ongoing economic situation I'm not sure the government will bite, sadly.
I think the uk government will pay for Portishead it's a good piece of good news when we are probably going to see a pause on a few projects.


Government has included this in todays release about planning ahead of Chancellor's speech on Wednesday. No specific projects named ahead of the speech, but clearly going to say something.
The Planning and Infrastructure Bill will provide the powers to accelerate the infrastructure and homes needed to deliver on the government’s ambitions – and fast track critical infrastructure such as windfarms, power plants, and major road and rail projects
Why include reference to rail projects (plural), unless about to announce two or more. One to keep eye on, especially if needs to balance announcements regionally.

 

John R

Established Member
Joined
1 Jul 2013
Messages
6,099
That all seems to be about the planning process, which the Portishead line has ground its way through. It’s a textbook example of why things need to change though.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,327
Location
Yorks
Government has included this in todays release about planning ahead of Chancellor's speech on Wednesday. No specific projects named ahead of the speech, but clearly going to say something.

Why include reference to rail projects (plural), unless about to announce two or more. One to keep eye on, especially if needs to balance announcements regionally.


Certainly seems promising for some rail projects.

Perhaps for some individual new stations as well.
 
Last edited:

Dr Day

Member
Joined
16 Oct 2018
Messages
758
Location
Bristol
Will Portishead re-opening really ‘unlock’ the scale of transit-oriented high density residential and employment development that seems to be what the Planning and Infrastructure Bill is all about?
 

lachlan

Member
Joined
11 Aug 2019
Messages
1,171
Will Portishead re-opening really ‘unlock’ the scale of transit-oriented high density residential and employment development that seems to be what the Planning and Infrastructure Bill is all about?
Perhaps it will drive the redevelopment of the business parks in the middle of Portishead and the development of the fields around Pill. It feels like a much smaller scale however than say the redevelopment of St Phillips or the Filton airfield.
 

jazzy

Member
Joined
26 Aug 2014
Messages
152
Has there been any news of progress on Portishead in the chancellor’s speech today? I assume that is where any such progress would have been announced?
 

Wilts Wanderer

Established Member
Joined
21 Nov 2016
Messages
3,199
I still think they’re missing a trick by going for a heavy-rail solution to this. An hourly service of diesel trains with full signalling etc, vs a Manchester Metrolink-type project, high frequency, lower axle weights etc and future possibility of extension onto the streets.

A light-rail option could form the starting block for a much-needed Bristol tram network.

Needless to say, this project will be welcome however it is done.
 

simonw

Established Member
Joined
7 Dec 2009
Messages
1,402
I still think they’re missing a trick by going for a heavy-rail solution to this. An hourly service of diesel trains with full signalling etc, vs a Manchester Metrolink-type project, high frequency, lower axle weights etc and future possibility of extension onto the streets.

A light-rail option could form the starting block for a much-needed Bristol tram network.

Needless to say, this project will be welcome however it is done.
A metro system would be great for Bristol and a higher frequency service is required to attract people but the line will be shared with the line to Portbury harbour for most of its route and with other heavy rail services into Temple Meads.
 

Wilts Wanderer

Established Member
Joined
21 Nov 2016
Messages
3,199
A metro system would be great for Bristol and a higher frequency service is required to attract people but the line will be shared with the line to Portbury harbour for most of its route and with other heavy rail services into Temple Meads.

Sharing a route with heavy rail isn’t a barrier to a light rail operation. Tyne & Wear metro and Supertram are excellent examples, the latter drew on the extensive German experience (Karlsruhe) as a trial.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,523
Location
Northampton
I still think they’re missing a trick by going for a heavy-rail solution to this. An hourly service of diesel trains with full signalling etc, vs a Manchester Metrolink-type project, high frequency, lower axle weights etc and future possibility of extension onto the streets.

A light-rail option could form the starting block for a much-needed Bristol tram network.

Needless to say, this project will be welcome however it is done.
Completely disagree, this line runs between discrete settlements not through an conurbation. Trams stop often and carry lots of short hops whereas a commuter railway takes people from a town into the city centre. There's also the small matter of the freight as mentioned. Further, a new light rail system a) isn't built and b) would need the depot, organisation, staff setup etc rather than being a relatively small add-on into GWR's existing network.

Trams in Bristol (which would be extremely beneficial) are far better off focusing on the gaps in the rail network, not stealing parts of it. Bristol is slowly developing a quite effective commuter rail network, and the tram should seek to complement it, not compete with it.

(apologies to the cross-post with the Mod).

The bit I'm waiting for is a note from the Treasury confirming this, then people can start moving on to making the service a success (which I think it will easily prove to be).
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,566
Location
Torbay
Completely disagree, this line runs between discrete settlements not through an conurbation. Trams stop often and carry lots of short hops whereas a commuter railway takes people from a town into the city centre. There's also the small matter of the freight as mentioned. Further, a new light rail system a) isn't built and b) would need the depot, organisation, staff setup etc rather than being a relatively small add-on into GWR's existing network.
High floor tram-trains could work, even sharing the route with freight, if there was a wider network to connect to and share new rolling stock with, and some prospect of new LR extensions, as in South Wales. With just one line so equipped in the Bristol area however, all on heavy rail infrastructure, it'd be a tiny isolated fleet with no advantage over standard HR vehicles. Opening as heavy rail initially doesn't prevent incorporation into a new light metro or similar network in some possible future.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,523
Location
Northampton
High floor tram-trains could work,
Do high-floor in Bristol and you shoot the tram's first advantage in the face. High-floor worked for Manchester with lots of old rail lines to convert quickly, but it's then been a problem for street running sections. A low-floor tram will be required to have stops in the city centre.
even sharing the route with freight, if there was a wider network to connect to and share new rolling stock with, and some prospect of new LR extensions, as in South Wales. With just one line so equipped in the Bristol area however, all on heavy rail infrastructure, it'd be a tiny isolated fleet with no advantage over standard HR vehicles.
Exactly.
Opening as heavy rail initially doesn't prevent incorporation into a new light metro or similar network in some possible future.
Indeed, although mixing modes is always a compromise and Bristol would, IMO, be far, far, better served by having a distinct light rail tram network that fills in the numerous gaps in between heavy rail corridors. Having an electric cross city service of Henbury-Filton-Portishead and Severn Beach-Clifton Down-Weston SM supplemented by a completely separate tram network that serves the continuous built up area is far better. If you look at a map it's painfully obvious that the Portishead Line isn't right for trams and there are big sectors of Bristol completely unserved by the heavy rail network.

The moment trams touch the heavy rail network they lose a significant proportion of their cost and operational benefits as the heavy rail standards have to be met with all that comes with it.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,566
Location
Torbay
Do high-floor in Bristol and you shoot the tram's first advantage in the face. High-floor worked for Manchester with lots of old rail lines to convert quickly, but it's then been a problem for street running sections. A low-floor tram will be required to have stops in the city centre.
I wouldn't say high floor would be a deal breaker if you only intend to have a short central street section with a tiny handful of stations, though clearly the site specific design for each site is more difficult and expensive. High floor could be advantageous if much of the rest of a network was shared or former heavy rail. High floor LR vehicles are often better riding than low floor (though not in Manchester in my experience!) and don't need to place most of their technical equipment on the roof. I agree low floor is usually the better solution for a new predominantly street based tram network, even if it has some fairly fast interurban legs on reserved track in places, like Nottingham. I wonder if Manchester might split eventually into two complementary networks like some German cities, with high floor 'stadtbahn' and low floor 'strassenbahn' routes. Stadtbahn routes tend to be the longer ones with more segregated running and greater station spacing, but some still use street trackage in places, even sometimes shared with the Strassenbahn.
 

tumbles

Member
Joined
13 Aug 2020
Messages
183
Location
Portishead
Dan Norris (WECA Mayor and Labour MP) has stated on local bbc news tonight that plans include opening an Ashton gate station. Not sure if he’s referring to phase 1a or the initial..
 
Last edited:

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,523
Location
Northampton
Dan Norris (WECA Mayor and Labour MP) has stated on local bbc news tonight that plans include opening an Ashton gate station. Not sure if he’s referring to phase 1a or the initial..
I mentioned on the other thread there is a separate set of proposals for several new stations in the WECA area, of which Ashton Gate is one. I'm happy to be corrected, but my understanding is that Ashton Gate is not part of the reopening currently authorised and would need it's own separate approvals.

The WECA press release: https://www.westofengland-ca.gov.uk/news/full-steam-ahead-for-bristol-portishead-line/ makes no mention of Ashton Gate. Also see this map from https://www.westofengland-ca.gov.uk/what-we-do/transport/metrowest/ which shows only Pill, Portishead, North Filton, Henbury and Charfileld as proposed stations (Ashley Down as well but that's obviously open now), Ashton Gate and the other additional stations are not mentioned on it.
 

daodao

Established Member
Joined
6 Feb 2016
Messages
3,601
Location
Dunham/Bowdon
Yes still just one train per hour and no station at Ashton Gate yet.
Together with the (relative) lack of passing opportunities and suboptimal location of the terminus station, there is a risk that this re-opening (assuming it is eventually achieved) will underperform. Suburban rail re-openings ideally need services at least every 30 minutes, as implemented with the recent Ashington line, to attract passengers.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,523
Location
Northampton
I wouldn't say high floor would be a deal breaker if you only intend to have a short central street section with a tiny handful of stations, though clearly the site specific design for each site is more difficult and expensive.
In Bristol, you're going to need more than a short street section. The city centre spreads out quite a way from the Harbour up to Broadmead and down to Temple Meads. Especially with the university development around the station.
High floor could be advantageous if much of the rest of a network was shared or former heavy rail. High floor LR vehicles are often better riding than low floor (though not in Manchester in my experience!) and don't need to place most of their technical equipment on the roof.
If you're doing that you want a light rail metro, not a light rail tram, IMO.
I agree low floor is usually the better solution for a new predominantly street based tram network, even if it has some fairly fast interurban legs on reserved track in places, like Nottingham. I wonder if Manchester might split eventually into two complementary networks like some German cities, with high floor 'stadtbahn' and low floor 'strassenbahn' routes. Stadtbahn routes tend to be the longer ones with more segregated running and greater station spacing, but some still use street trackage in places, even sometimes shared with the Strassenbahn.
I can see Manchester moving to having some Brussels-style 'pre-metro' lines where they're still trams but the stations are designed more along metro operation principles than trams. Although that'll be a long way in the future, because nobody's got the money to do anything major in Manchester city centre at the moment.

Back on Portishead, if I was WECA I'd keep Portishead unequivocally part of the heavy rail network, and focus first on half-hourly service, that's critical. Then I'd be looking to get the overall Bristol suburban network using a common fleet of battery-electric units, with long-term provision for these to be 4 and then 5 car. Once the electrics are in, 4tph would be the goal. Obviously some of these things would necessarily happen at the same time. A Bristol Light rail network would be kept wholly separate (at least operationally) from the heavy rail network. You would likely have engineering connections for access, but given how much of Bristol's network will need to be on-street and how busy the NR tracks are it would not sensibly be able to reliably run onto the NR network.

== Doublepost prevention - post automatically merged: ==

Together with the (relative) lack of passing opportunities and suboptimal location of the terminus station, there is a risk that this re-opening (assuming it is eventually achieved) will underperform. Suburban rail re-openings ideally need services at least every 30 minutes, as implemented with the recent Ashington line, to attract passengers.
30 minutes should be the immediate goal, but as long as the hourly service is sensibly timed for people to get into and out of the city centre without long waits then I don't think it will significantly underperform. Compared to the road or bus options, a 25min train direct to the main office area will be quite attractive, especially with the onwards connections to Filton and Clifton Down.
 
Last edited:

The exile

Established Member
Joined
31 Mar 2010
Messages
9,361
Location
Somerset
At one time there was a proposal to run double units out at the beginning of the peak which would then split to increase the inbound frequency (with presumably the reverse happening in the afternoon). Any idea if this is still the plan?
 

lachlan

Member
Joined
11 Aug 2019
Messages
1,171
Hopefully the former trackbed that will not be used due to the station being located further out will be turned into a pedestrian/cycle path. It could provide a nicer walking route into town.
 

tumbles

Member
Joined
13 Aug 2020
Messages
183
Location
Portishead
Hopefully the former trackbed that will not be used due to the station being located further out will be turned into a pedestrian/cycle path. It could provide a nicer walking route into town.

Its only about 1/4 mile from where the 1960s station was and already foot/cycle path crosses over the trackbed. What it could do is potentially have a path that runs from the parking to where the current paths are i.e:

1739442390141.png
 

I'm here now

Member
Joined
26 Aug 2023
Messages
240
Location
Cornwall
They use the Bristol Harbour Railway from hotwells/Ashton gate area to the city centre so it forms part of a tram network.
 

Barclay

Member
Joined
23 Mar 2010
Messages
143
The harbour railway - the New Cut branch, at least - would be better used as a light rail system which would partially replace the Metrobus from Long Ashton Park and Ride. Hopefully the guided busway could be adapted for light rail use without too much disruption and it could interchange with the Portishead Line at Ashton Gate station. Light rail could run as far as the MShed in place of the heritage line, but then from MShed some demolition would be required to get through the 1980s housing at Chalonner Court, over the Bathurst Basin, and into the tunnel under Redcliffe. The formation is blocked beyond the eastern portal of Redcliffe Tunnel by the Novotel, but with some demolition a tram could access Redcliffe Way, and thence proceed to Temple Meads. The Council are talking of re-modelling Redcliffe Way; it would be good to see passive provision here for future light rail.
 

tumbles

Member
Joined
13 Aug 2020
Messages
183
Location
Portishead
The harbour railway - the New Cut branch, at least - would be better used as a light rail system which would partially replace the Metrobus from Long Ashton Park and Ride. Hopefully the guided busway could be adapted for light rail use without too much disruption and it could interchange with the Portishead Line at Ashton Gate station. Light rail could run as far as the MShed in place of the heritage line, but then from MShed some demolition would be required to get through the 1980s housing at Chalonner Court, over the Bathurst Basin, and into the tunnel under Redcliffe. The formation is blocked beyond the eastern portal of Redcliffe Tunnel by the Novotel, but with some demolition a tram could access Redcliffe Way, and thence proceed to Temple Meads. The Council are talking of re-modelling Redcliffe Way; it would be good to see passive provision here for future light rail.

I think would cost millions to remove what’s in the way from M-Shed to BTM. Hindsight and all that is they should have kept the line. I guess they could always run a line over the river and along to redcliffe basin which might be a more cost effective route.

Then all we need is a route on the portway going along the rough path of the Bristol Port Railway and Pier line (I know the longer tunnel is part filled before anyone says!)
 