diligentdave
Member
- Joined
- 20 Oct 2007
- Messages
- 444
The front end of 156420 57 car is severely corroded and requires the gangway mounting pillars removing and renewing. Not a 5 min depot job. The 52 car was done sometime ago at Newton Heath, but the unit was stopped for 4 months back then.Why only half of 420 gone for repair. Is NL doing the roof repairs or is it going to a major works.
Neville Hill have the space and roof access equipment needed to do the repairs. Hull BG don't. A third party will be on site to do this work.Sorry meant roof repairs on 170472
