It's a long time (1961-ish) since BR put a driver in front of the media to explain how his train (the Glasgow-Euston Caledonian) could maintain full speed (then 90mph behind a class 40) in thick fog, thanks to AWS (audible warning of signal aspects in the cab).
It actually took BR a long time to equip all main lines with AWS, and there were two incompatible standards - the modern BR and the older but obsolete GWR pattern.
Today's ETCS and equivalent cab signalling systems means signal aspects are delivered directly to train cabs, for speeds up to 320km/h, continually, fog or not.