Presumably the following is a quotation?
So they propose to stop at Hook. Logic, or box-ticking?
The stations that have lost most appear to be Farnborough (2 to 1 fasts), Eastleigh (2 to 1) and Shawford (no London service or reasonable connection).South Western Railway and the Department for Transport failed to reopen the Waterside Line for the Southampton-Totton-Marchwood-Hythe passenger service promised in the Restoring Your Railway application and have so far failed to restart an hourly all day stopping service between Southampton Central and London Waterloo which existed pre-pandemic and was promised in the SWR December 2022 timetable consultation. This has left many stations including Eastleigh with a poor train service to London Waterloo so the DfT and SWR have left a hole in the train service not only on the Waterside Line but also between Southampton and London Waterloo which this open access service, hourly Southampton to Totton and Marchwood and every two hours Southampton to London Waterloo, would help to fill.
So they propose to stop at Hook. Logic, or box-ticking?
