Even easier with bi-mode. For XC I would have thought bi-mode is exactly what you want so you can benefit from the electrified sections.They see the benefits of being able to switch easily between electric and diesel traction
Even easier with bi-mode. For XC I would have thought bi-mode is exactly what you want so you can benefit from the electrified sections.They see the benefits of being able to switch easily between electric and diesel traction
Keeping in fantasy land, 50 gives me an idea...
We have eighteen Class 50s (I think). Not sure how many are operational, but they have a decent turn of speed, a reasonable route availability and would probably work well if they were looked after. So we have possibly six operational 50s, plus perhaps two operational Deltics, a few hired 47s and 67s and maybe Western. How's that for covering the summer relief services?
For coaching stock, we have the Irish MkIIIs, which conveniently have generator cars so they can work with Deltics and Westerns without difficulty. The tricky bit is finding enough replacement bogies.
Even easier with bi-mode. For XC I would have thought bi-mode is exactly what you want so you can benefit from the electrified sections.
Well at least for the GB network I doubt there will ever be a new build of loco hauled stock. There really isn't any situation I can think of other than a sleeper where you'd clearly want to use loco hauled stock when an MU is available. As has been discussed elsewhere it's likely that once the current sleeper stock is life expired it won't be replaced. I doubt there would be justification for a small build just for sleeper services. So in the future I don't think there will be any loco hauled stock on the GB network. In mainland Europe, as high speed rail gets faster it may well negate the need for sleeper services.What I was objecting to is your unjustifiable statements about loco hauled stock being "dead" in the coming years. MUs aren't the answer to everything.
Do you really expect to see MU sleepers in mainland Europe? The answer is it won't be a popular idea.
Well at least for the GB network I doubt there will ever be a new build of loco hauled stock. There really isn't any situation I can think of other than a sleeper where you'd clearly want to use loco hauled stock when an MU is available.
, reduced facilities, double the staff and could lead to overcrowding issues in one set.So in the future I don't think there will be any loco hauled stock on the GB network.
In mainland Europe, as high speed rail gets faster it may well negate the need for sleeper services.
Push-pull allows for flexible rakes, which can offer operational benefits
This is true, but how often are rakes of HST/ 225 stock actually shuffled?
Not so much with their UK operators, but elsewhere it does happen regularly.
It also allows defective coaches to be swapped.
I like the idea of this on principle, although practice might be a bit different. From Luton, you can continue to Welwyn without too much difficulty,
or reverse and follow a new route to Langley Junction, accross the ECML at Hitchin and on to Cambridge and Norwich, or maybe Cambridge, Stansted, Braintree and Colchester.
Another option would be to bypass Luton and go direct from Bedford to Hitchin.
The lack of a westward route from the ECML is seriously annoying, especially when heading to somewhere in the Midlands. Going into London adds to the cost and leads to the risk of missing connections. I also reckon that a Hitchin-Oxford journey (30 mins + 20 mins + 45 mins + 10 mins for connections = 1 hr 45) would be quicker without the delay of going into London.
No you can't - the old Welwyn - Luton line formation has been built on in several places including the carriage sidings and housing at the WGC end. You also have the A1M in the way as well.....
A new line between Langley and Luton would mean building straight across green-belt land where there's been no previous development. It's not even a case of restoring a previously closed line. It will also be highly costly as it isn't very flat - the MML is at the bottom of a valley when it leaves Luton for Harpenden.
Also, I can't see there being too many takers for a Luton - Norwich service...
Again, nice idea, but the formation of the old Bedford - Hitchin line has disappeared in many parts. The only possible line which could be restored is the Bedford - Sandy (which also happens to be the shortest link between the MML and ECML) but you'll have to be quick, because I believe parts of that will be lost for an Olympic rowing lake.....
To be fair, from Hitchin, you're about half-way between Peterboro and KX. From Peterboro you have a decent onward service to Birmingham, Leicester, Nottingham and Sheffield. So you don't need to go into London to get to a number of key destinations in the Midlands.
I don't imagine the volume of custom from Hitchin - Oxford even comes close to warranting a restoration of the east-west services. That it's inconvenient for one person occasionally doesn't justify it.
And I very much doubt it would be quicker with a "semi direct" route.
Bedford - Bletchley at present is timed for 45mins, even with investment, you're unlikely to get that below 30 mins.
Bicester - Oxford is currently timed as 25 mins, again investment might get that down to 20 mins.
So you're at an hour just to do Bedford - Bletchley and Bicester - Oxford.
Bletchley - Bicester is approx 20 miles, let's assume an average speed of 60mph, there's another 20 mins.
That's before you've either done Hitchin - Bedford - Sandy or Hitchin - Bedford direct.
I really doubt the time savings are there to be had on this one, and even less the likely passenger flows.
Oi
I was going to suggest more pay, fewer hours and more holidays !!
I just can't stop thinking about XC going bi mode
They will definitely has to give me a pay rise for that !!
Indeed you're going to have push a pan up and pan down button. I mean two entirely new buttons to be pushed that's got to be worth a pay rise of some sort!
![]()
Bedford - Bletchley at present is timed for 45mins, even with investment, you're unlikely to get that below 30 mins.
Bicester - Oxford is currently timed as 25 mins, again investment might get that down to 20 mins.
Bletchley - Bicester is approx 20 miles, let's assume an average speed of 60mph, there's another 20 mins.
Indeed you're going to have push a pan up and pan down button. I mean two entirely new buttons to be pushed that's got to be worth a pay rise of some sort!
![]()
Now this button opens the doors and this button shoots the sewage out...
Neither one of these proposals is mine. They are both versions of the East-West link, or at least as seen in the Cambridge Evening News once. Personally, I don't think either would work, although they might suit an extension of the St Albans Abbey line. Not just for the reasons you mention, lack of capacity through Luton would be a major problem.
How wide is an Olympic rowing lake? It's not beyond the bounds of possibility to bridge it, even if they spaced out the lanes a bit and had one passing through each arch. I mentioned the direct Hitchin route to avoid the need to cross the rowing lake, run along the ECML between Sandy and Hitchin or rebuild the Hitchin-Cambridge section. Personally, I can't see why they don't just do the rowing at Henley-on-Thames.
The problem is that it is not all that close. There is a 76-mile gap between King's Cross and Peterborough, through which passes the M25, the A414, the A421, the A14 and parts of the A47. Now that's a significant untapped market being channelled two ways, the slow Peterborough route or the expensive London route. On the Southern, the South Downs Line does exactly the same thing. Basically, we need a mirror for that. I would also expect heavy freight traffic, mostly diverted from the NLL/GOBLIN routes.
Still, seeing as we are a bit far from XC on this, I think we need a new thread.
Whilst I appreciate we've gone a bit off-topic a couple of points:
1- the St Albans abbey line will never be restored as heavy rail to Hatfield - the formation has gone once you're east of Smallford with the A1M, Galleria and various bits of development in Hatfield.
2- Puzzled by your Hitchin - Sandy - Cambridge suggestion.
3- Don't agree you need a northern version of 'North Downs line'.
Firstly with freight - look at where it's coming from and where it's going to.
It's either coming out of Felixstowe or Tilbury.
If it's Felixstowe and it's headed for the Midlands it goes via Bury St Edmunds.
If it's Felixstowe and it's headed south, then it goes straight down the GEML and then round the NLL and probably onto the WLL. A 'northern' orbital probably wouldn't change that.
If it's Tilbury then the NLL is fine as it links to each of the main routes north and Tilbury - NLL is a minimal distance.
In terms of passenger flows, this always gets raised, but there's no evidence of demand. In fact whenever such services have been tried on the existing infrastructure they've failed - e.g. Anglia Railway's Ipswich - Basingstoke service. In many cases the East-West bus and coach services have disappeared through lack of patronage. The two exceptions are the X5 between Cambridge and Oxford (though how many make the full journey is unknown), and the 724 between Harlow and Heathrow, though again, how many make the full journey is a moot point. Certainly when I used to use it it was seen as a quicker, more comfortable alternative to some of the other services between WGC and St Albans or Watford
Within 50 miles of London the overwhelming demand is for a service into and out of London and that's where the resources need to go. Interestingly Chiltern Railways agree and their use of the Oxford - Bicester line is to the provide an alternative London - Oxford service.
Seconded: The poor seating capacity of Voyagers compared to other train types has been mentioned several times on this thread alone!urm, high numbers of seats? Which voyager would be being referred to here?