I'm conscious the EWR route construction topic has finished. This post is actually a question to the wise, as I haven't found an answer via Internet searches.

A couple of days ago, I scouted out a road overbridge just north of Whaddon village, about 2 miles west of Bletchley. I'd missed that location when photographing October's week of IET/168 runs.

At Whaddon, the two running lines diverge, passing through different arches. The lines have a low mound of earth piled between them - and what I'd initially thought was remnants of a wide island platform.
Except.... LNWR never built a station or halt at Whaddon. I've found a photo of the location in pre-EWR days - both running lines pass under just one bridge arch and no line separation.

So, my question: why have the running lines been laid with a separation for EWR?

Thanks in advance.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,578
Location
Brighton
I would presume to provide better gauge clearance, either before electrification was cancelled, or to enable larger freight.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,308
I would presume to provide better gauge clearance, either before electrification was cancelled, or to enable larger freight.
This has been discussed in the forum before, I‘ll try and find the discussion, it started about post #532.

I think they simply took adavantage of the fact that an additional arch had already been previously in use at that bridge, the embankment had been dug out and a third track laid for entrance to the adjacent sidings. (That’s the WW2 Swanbourne sidings.) So rather than alter the bridge to increase gauge, they left a single track through the central arch, and the newer track of the two is diverging.

Here’s a link to an NLS Maps side by side view, confirming the sidings location:

 
Last edited:

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,342
Location
Nottingham
I'm conscious the EWR route construction topic has finished. This post is actually a question to the wise, as I haven't found an answer via Internet searches.

A couple of days ago, I scouted out a road overbridge just north of Whaddon village, about 2 miles west of Bletchley. I'd missed that location when photographing October's week of IET/168 runs.

At Whaddon, the two running lines diverge, passing through different arches. The lines have a low mound of earth piled between them - and what I'd initially thought was remnants of a wide island platform.
Except.... LNWR never built a station or halt at Whaddon. I've found a photo of the location in pre-EWR days - both running lines pass under just one bridge arch and no line separation.

So, my question: why have the running lines been laid with a separation for EWR?

Thanks in advance.
That bridge unusually for EWR has two arches that could carry tracks. In the 1950s, the north arch accommodated a single track to access what look like carriage sidings, in addition to the twin track mainline in the south arch.

1734867219737.png
[from https://maps.nls.uk/view/188679031 ]

By using both arches, the new line will go through the centre of each arch, which will give each track better clearance for future electrification.

EDIT: see post #1285
 
Last edited:

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,308
Here‘s a screenshot from the TWA order drawings, it shows that in the pre-existing condition it had vertical walls either side of the northern abutment:
Screenshot 2024-12-22 at 12.01.29.png
 

BlueLeanie

On Moderation
Joined
21 Jul 2023
Messages
723
Location
Haddenham
I'm conscious the EWR route construction topic has finished. This post is actually a question to the wise, as I haven't found an answer via Internet searches.

More paused than finished.

Electrification has been promised, so there is more construction discussion to come, not forgetting the eventual connection to Aylesbury.
 

Sun Chariot

Established Member
Joined
16 Mar 2009
Messages
6,728
Location
2 miles and 50 years away from the Longmoor Milita
Many thanks @swt_passenger and @Nottingham59 - the wider permanent way for Swanbourne yard, makes perfect sense. I know Swanbourne station area - as was - fairly well and for years I'd been puzzled where the WW2 marshalling yard could have been.
Now that I realise it was a little farther east of Swanbourne - thanks for the maps - it all fits together. Solved!
 
Last edited:

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,582
Location
Lancashire
Wasn’t that’s the area of land that needed the legal correction as the sidings weren’t actually wholly on Railway owned land ?
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
More paused than finished.

Electrification has been promised, so there is more construction discussion to come, not forgetting the eventual connection to Aylesbury.

I'll believe electrification when I see it. Already some progress on the Aylesbury connection, however.
 

fishwomp

Established Member
Joined
5 Jan 2020
Messages
1,348
Location
milton keynes
More paused than finished.
It's been built with electrification-ready structures / clearances.
Whether the standards change for the stricter between now and its implementation is another question!
Electrification has been promised, so there is more construction discussion to come, not forgetting the eventual connection to Aylesbury.
[promised] has it? Last i heard they were talking of dicontinuous electrification but I haven't kept up with the political news lately.
.. if it hasn't been announced at least three times by a politician, it's not promised!
 

Sun Chariot

Established Member
Joined
16 Mar 2009
Messages
6,728
Location
2 miles and 50 years away from the Longmoor Milita
It's been built with electrification-ready structures / clearances.
The old brick bridge at Launton, plus this one near the former site of Swanbourne station (which itself was nearly two miles from Swanbourne village!), seem to have tight clearances for OHLE. Perhaps they'll both be "discontinuous" parts, if / when electrification happens.
 

Attachments

  • 800005_Swanbourne.JPG
    800005_Swanbourne.JPG
    4.5 MB · Views: 138

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
It's been built with electrification-ready structures / clearances.

The new overbridges have been built with the necessary clearance. The existing overbridges have not been modified to the required clearance however.
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
3,582
Location
Lancashire
The new overbridges have been built with the necessary clearance. The existing overbridges have not been modified to the required clearance however.
Is correct although use of modern techniques (Surge Arrestors/non conducting surfaces) may assist in some cases
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,342
Location
Nottingham
this one near the former site of Swanbourne station (which itself was nearly two miles from Swanbourne village!), seem to have tight clearances for OHLE.
I'm sure they would not have spent money on raising the parapet on the bridge in the photo unless it was suitable for electrification.
 

Sun Chariot

Established Member
Joined
16 Mar 2009
Messages
6,728
Location
2 miles and 50 years away from the Longmoor Milita
I'm sure they would not have spent money on raising the parapet on the bridge in the photo unless it was suitable for electrification.
I suspect there might be an OHLE voltage drop under those bridges, if need be. The Swanbourne bridge I've visited for nearly 40 years (since cycling there as a mid teen). I have a photo at the exact same location, in days before EWR, and you're right - the brick parapet was lower and definitely not "H&S friendly" for a high speed permanent way, let alone an electrified one.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,308
I suspect there might be an OHLE voltage drop under those bridges, if need be. The Swanbourne bridge I've visited for nearly 40 years (since cycling there as a mid teen). I have a photo of the exact same location, in days before EWR, and you're right - the brick parapet was lower and definitely not "H&S friendly" for high speed permanent way, let alone an electrified one.
Neither of the bridges you’ve recently mentioned are shown as being cleared for electrification in the TWA drawings. For all the bridges that were to be cleared for wires they show the pantograph position. It’s possible the parapets needed updating anyway for vehicle containment.
 

Sun Chariot

Established Member
Joined
16 Mar 2009
Messages
6,728
Location
2 miles and 50 years away from the Longmoor Milita
Neither of the bridges you’ve recently mentioned are shown as being cleared for electrification in the TWA drawings. For all the bridges that were to be cleared for wires they show the pantograph position. It’s possible the parapets needed updating anyway for vehicle containment.
Ah - perfect, that all figures, thanks.
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,342
Location
Nottingham
Neither of the bridges you’ve recently mentioned are shown as being cleared for electrification in the TWA drawings. For all the bridges that were to be cleared for wires they show the pantograph position. It’s possible the parapets needed updating anyway for vehicle containment.
could you possibly post a link to the TWA drawings, please? There must be one upthread, but I can't find it

EDIT: Found them in another thread:
 
Last edited:

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,308
could you possibly post a link to the TWA drawings, please? There must be one upthread, but I can't find it
Here you go, this link is to the earlier consultations thread. In that post I included a direct link to one of the two sets of bridge drawings, the one that covers the west end of the route, Bicester to Bletchley.
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
I'm sure they would not have spent money on raising the parapet on the bridge in the photo unless it was suitable for electrification.

I’m not sure of that at all. The bridge in the photo does not appear to have enough clearance for OHLE and I’d imagine that the modern standards for parapets over a new 100mph railway are rather stricter than they were prior to closure of the line in the early 1990s.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,631
Location
Northampton
Perhaps they'll both be "discontinuous" parts, if / when electrification happens.
I would expect Discontinuous electrification to mean from Bletchley to the next bridge that needs work and similar from Oxford/Bicester eastwards. It is most efficient to have electrified sections as extensions of the existing setups, so Oxford-Bicester will need to wait for Didcot-Oxford.
 

fishwomp

Established Member
Joined
5 Jan 2020
Messages
1,348
Location
milton keynes
Perhaps they'll both be "discontinuous" parts, if / when electrification happens.
Apparently this is the preferred path for EWR..


"As part of our latest proposals, which we'll be sharing for public consultation from 14 November, we’re providing information on our preference for green traction power in the form of discontinuous electrification with hybrid battery-electric trains, after the Chancellor confirmed government support for the project in yesterday’s budget."

Bonkers.
 
Last edited by a moderator:

Halish Railway

Established Member
Joined
26 Apr 2017
Messages
2,177
Location
West Yorkshire / Birmingham
Apparently this is the preferred path for EWR..


"As part of our latest proposals, which we'll be sharing for public consultation from 14 November, we’re providing information on our preference for green traction power in the form of discontinuous electrification with hybrid battery-electric trains, after the Chancellor confirmed government support for the project in yesterday’s budget."

Bonkers.
So there goes any ambitions of electric intermodal work and the ‘electric spine’. This is a scheme that capitalised on the benefits of HS2 and more freight paths on the WCML as well. Just completely inept governance.
 

jfowkes

Established Member
Joined
20 Jul 2017
Messages
1,271
I'm still unsure if "discontinuous" in the context of EWR means "short sections under bridges" or "sections of several miles". I'm sort-of OK with the first, not at all about the second.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,726
So there goes any ambitions of electric intermodal work and the ‘electric spine’. This is a scheme that capitalised on the benefits of HS2 and more freight paths on the WCML as well. Just completely inept governance.
Electric spine died long ago.
 
Status
Not open for further replies.

Top