From what I've read Southern created the Class 171 by fitting a Dellner coupling system to their Class 170s so that they could be coupled to 377 units. However, I can't find any evidence that this has ever been done and it seems like a thoroughly pointless exercise in creating a non-standard unit.
If a 377 and a 171 were to run in multiple could they operate at a reasonable speed or would it just be a way of clearing the line if one unit or the other broke down? Also, assuming that they could run at normal speed in service, would there be any reason why a 377 and a 171 couldn't run in multiple to form a regular service? For instance, a 377 with a 171 splitting at Oxted for the East Grinstead and Uckfield branches respectively?
If a 377 and a 171 were to run in multiple could they operate at a reasonable speed or would it just be a way of clearing the line if one unit or the other broke down? Also, assuming that they could run at normal speed in service, would there be any reason why a 377 and a 171 couldn't run in multiple to form a regular service? For instance, a 377 with a 171 splitting at Oxted for the East Grinstead and Uckfield branches respectively?