The 1989 "station" was really only a new ticket office and footbridge to the multi-storey car park, with an odd concourse and some staff offices. It is a mediocre building, inefficient in site ratio (useful floor area/site area), nondescript frontage with poorly sized signage, a space-frame roof that looks as though the scaffolding is still up and inches deep in dust, so badly built that the 1991 roof leaks (as does the new transfer deck). It is a shame the late Queen had to put her Name to it. It is in what was called "Station Square", bounded by the Italianate station and GW Hotel, grouped around King Edward 7. A responsible planner and architect would have squared off the third side with a sympathetic new station frontage, inviting passengers to enter. This is still needed as the £850M new station lacks a South ticket office and covered concourse! The North, quiet side is better, with perhaps England's longest escalator and even has a good little bus station for Caversham, North of the river, although buses to this prosperous area are less well used than those to the poorer areas, East, South and West.
The new station is very good from the track layout and may be the only station in the country where a delay can propagate to every main line in England (even up North). There is enormous covered waiting space, just as well as the new platform canopies deflect wind and rain on to passengers. Why an overall roof was not used as at Man Vic and KX can only be put down to the low priority passengers had in design. It is perhaps a pity the Eastern foot-bridge was lost as the station is now so vast.
Reading's historic boundaries are tight, probably because the affluent suburbs did not want to pay urban rates although they used the Borough's services. Oxfordshire wants all the nasties South of the river if possible but is happy to funnel through traffic through central Reading. The alternatives are Whitchurch (toll!) or Sonning (single lane!).
Reading's (and Govt's) regained predilection for high rise housing, neglects the consistent dynamiting of such nationally, as quite unsuitable to social housing. Welcome to the 1950's, Reading!
WAO
The new station is very good from the track layout and may be the only station in the country where a delay can propagate to every main line in England (even up North). There is enormous covered waiting space, just as well as the new platform canopies deflect wind and rain on to passengers. Why an overall roof was not used as at Man Vic and KX can only be put down to the low priority passengers had in design. It is perhaps a pity the Eastern foot-bridge was lost as the station is now so vast.
Reading's historic boundaries are tight, probably because the affluent suburbs did not want to pay urban rates although they used the Borough's services. Oxfordshire wants all the nasties South of the river if possible but is happy to funnel through traffic through central Reading. The alternatives are Whitchurch (toll!) or Sonning (single lane!).
Reading's (and Govt's) regained predilection for high rise housing, neglects the consistent dynamiting of such nationally, as quite unsuitable to social housing. Welcome to the 1950's, Reading!
WAO