I travelled via Thameslink on 9th September from Burgess Hill to Bristol Temple Meads, changing at Farringdon, connecting to Paddington via the Elizabeth Line. My itinerary was booked as a single ticket, advance purchase fare valid on the following service:
13:25 Burgess Hill to Farringdon (14:26)
15:00 Paddington to Bristol Temple Meads
The 13:25 Thameslink train was terminated early at Gatwick at 13:46 due to a train fault and the next service was the 14:06, which arrived into Farringdon at 14:50. Because my connecting time had reduced from 30 minutes to just 10, I missed my 15:00 from Paddington (by 2 minutes…!). The next service from Paddington was 15:30.
I submitted a delay repay claim to Thameslink on the 9th September which showed as referred. After the 20-working days had elapsed and with no response, I emailed Thameslink to chase and received a response that they were still assessing the claim.
Eventually, today, I received confirmation that my claim was approved however they have manually changed the delay bracket of 30-59 minutes to, 15-29 minutes. My missed connection at Paddington was exactly 30 minutes therefore this should fall into the higher compensation bracket?
Long time lurker, first time poster!
I travelled via Thameslink on 9th September from Burgess Hill to Bristol Temple Meads, changing at Farringdon, connecting to Paddington via the Elizabeth Line. My itinerary was booked as a single ticket, advance purchase fare valid on the following service:
13:25 Burgess Hill to Farringdon (14:26)
15:00 Paddington to Bristol Temple Meads
The 13:25 Thameslink train was terminated early at Gatwick at 13:46 due to a train fault and the next service was the 14:06, which arrived into Farringdon at 14:50. Because my connecting time had reduced from 30 minutes to just 10, I missed my 15:00 from Paddington (by 2 minutes…!). The next service from Paddington was 15:30.
I submitted a delay repay claim to Thameslink on the 9th September which showed as referred. After the 20-working days had elapsed and with no response, I emailed Thameslink to chase and received a response that they were still assessing the claim.
Eventually, today, I received confirmation that my claim was approved however they have manually changed the delay bracket of 30-59 minutes to, 15-29 minutes. My missed connection at Paddington was exactly 30 minutes therefore this should fall into the higher compensation bracket?