Hello, I had this experience on Thursday evening, and I’m wondering what opinions people have.
I had an itinerary from Southampton Central to Hartford. Generated by the retailer, observing the minimum connection times (just!)
1/8.
Departing Southampton Central at 17:30, arriving London Waterloo at 18:49.
Cross London on tube
Departing London Euston at 19:46, arriving at Crewe at 21:54
Departing Crewe at 22:32, arriving Hartford at 22:45.
(The 19:46 is the last train I can catch to connect to Hartford using London Northwestern trains only).
Tickets held:
Southampton Central -> London Zone 1 Off-Peak Return
London Euston -> Hartford Off-Peak Return (LNR/WMT ONLY)
Due to flooding, my 17:30 train arrived 64 minutes late into Waterloo, at 19:54. Obviously this means I miss the last train I can use from Euston to get back to Hartford that day, the 19:46. I explain this to the guard on my Southampton train, and although he says he can’t really do anything for the connections, he writes on my ticket details of my delay, and his mobile number in case verification is needed. Nice guy!
I make my way to Euston, and go straight over to the ticket office. There’s a lot of Avanti staff standing around, but no LNR. I show my tickets, my itinerary, and ask what my options are, as I now can’t get home using my tickets. “Buy a ticket for us. We don’t deal with them (LNR), and they don’t deal with us, we’re separate companies”. To be honest, I didn’t expect them to help, but I thought I’d try anyway. Not wanting to spend an extra £70 when the delay was due to the railway, I went down to the London Northwestern ticket barriers.
There was a chap on the barriers there, and to be fair, he was quite sympathetic and tried to help. He said I should be entitled to use an Avanti train to get to Crewe in time for my connection, “but you won’t be able to get on one here, they’re quite strict with the tickets”. He then proceeds to try and find a LNR train that can get me to Milton Keynes in time to change onto the faster Avanti train to Crewe. Unfortunately he finds a route just as doors shut on a service. He radios through for the manager, to see if she can help.
I repeat all my story to the LNR manager, to ask what I can do now. I’ve got my tickets, I’m following the valid itinerary, but now because of railway delays, I can’t get home. Her solution is “you can try getting a refund from the Trainline for your Euston-Hartford ticket, since you can’t use it now. It might cost you £5 but it’s the best option.” (I did say to her that I didn’t use the trainline, but oh well.) I say that I don’t want my money back, I just want to get home. She says that she can’t do anything, as none of their trains can get me to Hartford now. I explain that it was the railway’s delay that’s caused this, but she says there’s nothing she can do. I must say that despite going round in circles, it was a pleasant enough conversation, I was doing my best to be calm.
In the end, I get the 20:46 LNR service to Crewe, and a family member drives out to rescue me (not a very easy route, especially at that time of day).
So, my question is, was the railway responsible for getting me home that evening? (I know I had split tickets, but they were continuous, and I had an itinerary with allowed connections). And if so, which company’s responsibility would it have been?
I had an itinerary from Southampton Central to Hartford. Generated by the retailer, observing the minimum connection times (just!)
1/8.
Departing Southampton Central at 17:30, arriving London Waterloo at 18:49.
Cross London on tube
Departing London Euston at 19:46, arriving at Crewe at 21:54
Departing Crewe at 22:32, arriving Hartford at 22:45.
(The 19:46 is the last train I can catch to connect to Hartford using London Northwestern trains only).
Tickets held:
Southampton Central -> London Zone 1 Off-Peak Return
London Euston -> Hartford Off-Peak Return (LNR/WMT ONLY)
Due to flooding, my 17:30 train arrived 64 minutes late into Waterloo, at 19:54. Obviously this means I miss the last train I can use from Euston to get back to Hartford that day, the 19:46. I explain this to the guard on my Southampton train, and although he says he can’t really do anything for the connections, he writes on my ticket details of my delay, and his mobile number in case verification is needed. Nice guy!
I make my way to Euston, and go straight over to the ticket office. There’s a lot of Avanti staff standing around, but no LNR. I show my tickets, my itinerary, and ask what my options are, as I now can’t get home using my tickets. “Buy a ticket for us. We don’t deal with them (LNR), and they don’t deal with us, we’re separate companies”. To be honest, I didn’t expect them to help, but I thought I’d try anyway. Not wanting to spend an extra £70 when the delay was due to the railway, I went down to the London Northwestern ticket barriers.
There was a chap on the barriers there, and to be fair, he was quite sympathetic and tried to help. He said I should be entitled to use an Avanti train to get to Crewe in time for my connection, “but you won’t be able to get on one here, they’re quite strict with the tickets”. He then proceeds to try and find a LNR train that can get me to Milton Keynes in time to change onto the faster Avanti train to Crewe. Unfortunately he finds a route just as doors shut on a service. He radios through for the manager, to see if she can help.
I repeat all my story to the LNR manager, to ask what I can do now. I’ve got my tickets, I’m following the valid itinerary, but now because of railway delays, I can’t get home. Her solution is “you can try getting a refund from the Trainline for your Euston-Hartford ticket, since you can’t use it now. It might cost you £5 but it’s the best option.” (I did say to her that I didn’t use the trainline, but oh well.) I say that I don’t want my money back, I just want to get home. She says that she can’t do anything, as none of their trains can get me to Hartford now. I explain that it was the railway’s delay that’s caused this, but she says there’s nothing she can do. I must say that despite going round in circles, it was a pleasant enough conversation, I was doing my best to be calm.
In the end, I get the 20:46 LNR service to Crewe, and a family member drives out to rescue me (not a very easy route, especially at that time of day).
So, my question is, was the railway responsible for getting me home that evening? (I know I had split tickets, but they were continuous, and I had an itinerary with allowed connections). And if so, which company’s responsibility would it have been?