Why is there no capacity at King's Cross? It lost platform 11 but gained platform 0. There used to be six GN trains per hour but now there are only four. Unless I have miscounted? As for drivers, they used do to a round trip from Kings' Cross to Peterborough or vice versa on 317s and 365s.You'd need platform capacity at King's Cross to terminate there. Plus another driver to work the train back, as it would likely breach continuous driving times to plan for one driver to work a train Peterborough to London then back again.
When coming up with an emergency timetable, things need to be kept simple, as there isn't enough time or staff in control to come up with complicated workings at short notice
== Doublepost prevention - post automatically merged: ==
It was supposed to be hourly from London Bridge to Horsham but there were several two hour gaps. At least there was someone proactive on duty that who put extra stops in the Bognor trains. There is no guarantee that will happen. That is the most annoying aspect of the Thameslink shambles. There is no set plan as to what will happen when a particular route stops working. Extra stops on other services might or might not happen, seemingly depending on the whim of the controller of the day.The latter is stretching the definition of the word maintained when it comes to Peterborough - Horsham. It’s not uncommon for this service to be devastated at the first sign of disruption, and often barely recovering for the remainder of the day.
Last edited: