My point here is that there was no engineering work between Portsmouth and Chichester yet a planned but unadvertised reduction of trains from 3ph to 1ph.
The Brighton - Portsmouth terminated at Chichester and one Victoria was diverted to Southampton.
In total, the 5th service from Havant - Chichester was reduced to 2tph.
It wasn’t on the changes to train times, it wasn’t on their website. It’s not good that this was all unadvertised.