Northern Class 331 East:West unit swap

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Grumpy

Established Member
Joined
8 Nov 2010
Messages
1,322
Not until 323s are deployed en masse on Manchester Airport to Blackpool North services. More 331s will be required in Yorkshire for the December timetable change when six car working begins,
The platform extensions at the likes of Guiseley, Menston and Burley look to be physically complete but remain barriered off. Is there any reason for this eg does someone from ORR have to inspect them?
Keeping them barriered off seems daft and at some cost-I noticed the Burley upside platform barrier had blown over in the wind yesterday
 

Halish Railway

Established Member
Joined
26 Apr 2017
Messages
2,177
Location
West Yorkshire / Birmingham
The platform extensions at the likes of Guiseley, Menston and Burley look to be physically complete but remain barriered off. Is there any reason for this eg does someone from ORR have to inspect them?
Keeping them barriered off seems daft and at some cost-I noticed the Burley upside platform barrier had blown over in the wind yesterday
They don’t look complete yet, a few haven’t had tactile paving completely finished yet.
 

vincenth06

Member
Joined
11 Mar 2024
Messages
17
Location
bingley
The platform extensions at the likes of Guiseley, Menston and Burley look to be physically complete but remain barriered off. Is there any reason for this eg does someone from ORR have to inspect them?
Keeping them barriered off seems daft and at some cost-I noticed the Burley upside platform barrier had blown over in the wind yesterday
They finished Bingley a while ago but it has been bordered off ever since. Not sure why though, could just be until the 6 carriage train sets are running.
 

aliceh

Member
Joined
11 Oct 2019
Messages
242
Location
Bournemouth
333009 has done a round trip in passenger service between Leeds and Doncaster this morning. Must be one of the first 333 services since the transfers started?

RTT shows it being swapped out for a 331 once it arrives back at Leeds, so just the two trips for today, it would seem.
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,888
333009 has done a round trip in passenger service between Leeds and Doncaster this morning. Must be one of the first 333 services since the transfers started?

RTT shows it being swapped out for a 331 once it arrives back at Leeds, so just the two trips for today, it would seem.
It won't be repeated any time soon...
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,888
The platform at South Elmsall is very tight - when 331/1s worked the route the rear door was locked out by ASDO.

321s had shorter coaches so also didn't have a problem.

Despite 333s being cleared for the route, on a reassessment a few months back in preparation for full service it was decided that mitigation (i.e. a stop board in the correct location, potentially slightly off the platform end) was required before any further 333s operated in passenger service. Until that point you won't see any more in service on that route.
 

Adam0984

Established Member
Joined
18 Feb 2014
Messages
1,213
There was previously a restriction in the Sectional Appendix about the length of platforms for 333s which instructed at certain stations (maybe Outwood, Sandal, Fitzwilliam and Elmsall) that they were to be local door only operation or the rear door be locked out of something due to the platform length being too smaller margin for error and leaving the rear doors not on the platform
 

InkyScrolls

On Moderation
Joined
20 Jul 2022
Messages
1,460
Location
North of England
There was previously a restriction in the Sectional Appendix about the length of platforms for 333s which instructed at certain stations (maybe Outwood, Sandal, Fitzwilliam and Elmsall) that they were to be local door only operation or the rear door be locked out of something due to the platform length being too smaller margin for error and leaving the rear doors not on the platform
It won't have been 'rear door locked out' as on a 333, once a door is locked out only a fitter can unlock it at a maintenance depot.
 

Adam0984

Established Member
Joined
18 Feb 2014
Messages
1,213
It won't have been 'rear door locked out' as on a 333, once a door is locked out only a fitter can unlock it at a maintenance depot.
Oh yeah I know that practically that was a no go but these things don't always match up between reality and a piece of paper
 

Allwinter_Kit

Member
Joined
12 Jul 2017
Messages
218
Idiotic question but how was it decided which platforms would be lengthened and which would be SDO'd? Was it just on peak time patronage or....?

EDIT: I was rattling down Airedale on a 3 car sprinter this morning and it made me repeat this thought. As an example from when I was staring out the window this morning and pondering this:

Steeton and Silsden - not being changed, so presumably SDO on the 2x3 car 331s
Keighley - long enough already
Crossflatts- presumably SDO? (Unless I've missed extension works there)
Bingley - being extended

So are the extensions only at the ones that are served by the semi-fasts? But they're also the trains that aren't being lengthened given they're diesel through to Bentham/Carlisle lines!

I just wondered. Apologies if off-topic.
 
Last edited:

Bertie the bus

Established Member
Joined
15 Aug 2014
Messages
3,216
A month on and they're still barriered off. Look complete to me (as they did a month ago) with tactile paving.
A month is nothing. There are platform extensions at some Lancashire stations as well and Leyland was completed about 7 months ago but the extensions are still barriered off so they are still using SDO on 6-car services.
 

Harvey B

Established Member
Joined
11 Mar 2019
Messages
1,241
I'm posting this here because the 333 Doncaster Thread is closed but When do Doncaster Crews start their training on the 333s?
 

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,907
Idiotic question but how was it decided which platforms would be lengthened and which would be SDO'd? Was it just on peak time patronage or....?

EDIT: I was rattling down Airedale on a 3 car sprinter this morning and it made me repeat this thought. As an example from when I was staring out the window this morning and pondering this:

Steeton and Silsden - not being changed, so presumably SDO on the 2x3 car 331s
Keighley - long enough already
Crossflatts- presumably SDO? (Unless I've missed extension works there)
Bingley - being extended

So are the extensions only at the ones that are served by the semi-fasts? But they're also the trains that aren't being lengthened given they're diesel through to Bentham/Carlisle lines!

I just wondered. Apologies if off-topic.
I suspect the deciding factor is the presence of obstacles in the way of full platform extensions. It seems to have been decided that moving signalling equipment is too difficult; likewise physical obstacles such as bridges or additional land take.
 

Britannia94

Member
Joined
12 Sep 2019
Messages
37
Location
York
Could it be they are yet to get round to doing it?

Saltaire is a prime example of this, there was a new article from the Telegraph and Argus last year about the platforms being extended, yet they have yet to do this stattion.
 
Last edited:

InkyScrolls

On Moderation
Joined
20 Jul 2022
Messages
1,460
Location
North of England
Could it be they are yet to get round to doing it?

Saltaire is a prime example of this, there was a new article from the Telegraph and Argus last year about the platforms being extended, yet they have yet to do this station.
Saltaire is still due to be extended; watch this space.
 

jonesy3001

Established Member
Joined
13 Jul 2009
Messages
3,317
Location
Otley, West Yorkshire
Platform 2 at menston as also not been extended but guiseley looks complete on both, unsure about burley and ben rhyding has very rarely get a train to ilkley.
 

InkyScrolls

On Moderation
Joined
20 Jul 2022
Messages
1,460
Location
North of England
Are they going to be able to do Saltaire? It is a wooden platform structure done on the cheap in the 1980s which surely doesn’t meet today’s safety standards?
Well they're going to so I'm sure it'll work out! They're only extending it, the new structure doesn't have to match the original.
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,640
Location
Rochdale
They extended Mills Hill and Lostock Parkway both also made out of wood built on the cheap in the 80s so there's hope! Once they had built the extension they also rebuilt the entire passenger walking area out of some serious heavy duty stuff.
 
Last edited:

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,907
Well they're going to so I'm sure it'll work out! They're only extending it, the new structure doesn't have to match the original.
Last time I was involved in a platform extension it was for a similar wooden platform design. The extension was a similar design with wooden frame and I think GRP panels. This was about a decade ago so not sure whether this approach is still permitted under current standards.
 

reecestrains

Member
Joined
22 Aug 2023
Messages
384
Location
Leeds, West Yorkshire
333005 did two Doncaster runs this morning before being replaced with 331003 after 10am.

== Doublepost prevention - post automatically merged: ==

Could have been because of disruption at Leeds or maybe crew training.
 