HS2 Old Oak Common

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,381
Location
Taunton or Kent
And the newspapers this morning reporting that £19-20bn blackhole* found (so far) on current confirmed activities this FY to be announced by the chancellor shortly.

*which will include contingency amounts
I've also seen reports that road and hospital infrastructure projects are among the things being considered for mothball at least, including the Lower Thames Crossing and hospital upgrades/maintenance that are not to do with RAAC concrete (which is consuming the budget for hospital infrastructure right now), rather than HS2 stuff.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,984
Location
Surrey
I've also seen reports that road and hospital infrastructure projects are among the things being considered for mothball at least, including the Lower Thames Crossing and hospital upgrades/maintenance that are not to do with RAAC concrete (which is consuming the budget for hospital infrastructure right now), rather than HS2 stuff.
Sunday Times has this its behind a paywall but screengrab from tomorrowspapers

1722117021297.png
Can't see that happening more likely spend will right shifted to later years.
 

Topological

Established Member
Joined
20 Feb 2023
Messages
4,257
Location
Swansea
Those who said Labour spending plans were not costed might be about to be shown to be correct.

It's quite scary to see what they plan to cut (probably HS2 to Euston is not the worst of the set)

In the old days it was plausible they could not have planned accurately, but since the Office for Budget Responsibility, it is much harder to have a "missing £20bn".
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,984
Location
Surrey
Those who said Labour spending plans were not costed might be about to be shown to be correct.

It's quite scary to see what they plan to cut (probably HS2 to Euston is not the worst of the set)

In the old days it was plausible they could not have planned accurately, but since the Office for Budget Responsibility, it is much harder to have a "missing £20bn".
I suspect they will spend more than you think but in other parts of the country and on things that the majority of people want/need this is abot generating some savings on nice to have projects.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,381
Location
Taunton or Kent
Those who said Labour spending plans were not costed might be about to be shown to be correct.

It's quite scary to see what they plan to cut (probably HS2 to Euston is not the worst of the set)

In the old days it was plausible they could not have planned accurately, but since the Office for Budget Responsibility, it is much harder to have a "missing £20bn".
I suspect they will spend more than you think but in other parts of the country and on things that the majority of people want/need this is about generating some savings on nice to have projects.
The FT report on this made a particular note about how the current financial year is the final year under the 2021 Spending Review, which was very "front-loaded" and eroded by high inflation. Someone who is more of an expert maybe able to advise better on this, but this suggests that the March budget for the next financial year could support more spending:


...“This year was always going to be crunch year,” said Ben Zaranko at the Institute for Fiscal Studies, noting that 2024-25 is the final fiscal year of the spending review laid out by Sunak when he was chancellor in 2021...
 

Topological

Established Member
Joined
20 Feb 2023
Messages
4,257
Location
Swansea
I suspect they will spend more than you think but in other parts of the country and on things that the majority of people want/need this is abot generating some savings on nice to have projects.
I hope you are right

BUT, both parties are combining to throttle the potential of the north with HS2 cuts

The A303 Stonehenge seems like a pretty obvious thing to build (but apparently is on the cut list)

The 2050 hospital building programme seems to be another mistake as well.

Let's see what the final list is.

== Doublepost prevention - post automatically merged: ==

The FT report on this made a particular note about how the current financial year is the final year under the 2021 Spending Review, which was very "front-loaded" and eroded by high inflation. Someone who is more of an expert maybe able to advise better on this, but this suggests that the March budget for the next financial year could support more spending:

I have not read the FT.

However, for all inflation raises costs, the increases in individuals' incomes associated with inflation have also brought a large tax dividend (recall that the thresholds for income tax did not move with inflation).

* Figures are on average since some did not get pay rises and some are still waiting for their agreed backdated rises.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,984
Location
Surrey
I hope you are right

BUT, both parties are combining to throttle the potential of the north with HS2 cuts
Yes with HS2 but still reckon we will see an indication that funding will be prioritised for more local improvements and there are plenty of economic experts who say borrowing to invest in infrastructure should be treated differently to borrowing for day to day operations.
The A303 Stonehenge seems like a pretty obvious thing to build (but apparently is on the cut list)
1.7B for the tunnel is HS2 pricing levels for construction per mile and even then the environmentalists are objecting to it
 

Topological

Established Member
Joined
20 Feb 2023
Messages
4,257
Location
Swansea
Yes with HS2 but still reckon we will see an indication that funding will be prioritised for more local improvements and there are plenty of economic experts who say borrowing to invest in infrastructure should be treated differently to borrowing for day to day operations.

1.7B for the tunnel is HS2 pricing levels for construction per mile and even then the environmentalists are objecting to it

There is a lot of sense in permitting borrowing for investment. Though there are very definitely two schools of thought on that one. Nominally it should be Labour pushing for more borrowing for infrastructure. (The counter-argument is that government expenditure is inflationary as it raises demand in the economy)

Having spent all that money fighting the environmentalists and getting permission it would be very remiss to let that expenditure lapse. Yes, there is the notion of sunk-cost fallacy, but then there is also the common sense that says that the project is needed.

We are straying a little from OOC, but the points do stand as an argument for Euston to be built in its optimal form.
 

AlbertBeale

Established Member
Joined
16 Jun 2019
Messages
3,188
Location
London
Yes with HS2 but still reckon we will see an indication that funding will be prioritised for more local improvements and there are plenty of economic experts who say borrowing to invest in infrastructure should be treated differently to borrowing for day to day operations.

1.7B for the tunnel is HS2 pricing levels for construction per mile and even then the environmentalists are objecting to it

What is meant by "the environmentalists" with a definite article, as though they're a different alien breed? Or is it meant to be deliberately demeaning?
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
1.7B for the tunnel is HS2 pricing levels for construction per mile and even then the environmentalists are objecting to it
It's circular though - the tunnel is expensive because of all the objections forcing legal challenges and then it's objected to on grounds of cost.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,897
Location
Mold, Clwyd
It's circular though - the tunnel is expensive because of all the objections forcing legal challenges and then it's objected to on grounds of cost.
It's a bit like the sell-off of BR's rolling stock to the Roscos.
Labour was very vocal about reversing the privatisation process in 1996-7, so the Treasury got less cash than it expected for the fleet in the sale.
Labour then accepted privatisation as a done deal, and still doesn't plan to buy the fleet back (now much more expensive of course).

Labour's "£20 billion" hole is just like any incoming new-broom company management would do.
They want to bury bad news so the improvements in the future will look better.
The IFS has been warning of the "black hole" since before the election was called.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,381
Location
Taunton or Kent
Labour's "£20 billion" hole is just like any incoming new-broom company management would do.
They want to bury bad news so the improvements in the future will look better.
The IFS has been warning of the "black hole" since before the election was called.
That's part of the reason, the other part is that for all our disgust at lying politicians, the truth is political suicide, even if accepting the truth leads to better long term outcomes. Examples of where telling the truth led to a backlash are Theresa May's dementia tax and Johnson's (yes he has told the truth before believe it or not) "many loved ones will die before their time". Regarding HS2 I imagine many lies have been told about realistic timings, costs and scope of the project, but covering up the truth until one cannot hide it anymore has led to a worse outcome in every way.
 

Backroom_boy

Member
Joined
28 Dec 2019
Messages
582
Location
London
It's circular though - the tunnel is expensive because of all the objections forcing legal challenges and then it's objected to on grounds of cost.
Legal challenges aren't the big cost of thr tunnel; it's the tunnel itself which is in a very unexpectedly odd geological area apparently (hence the cost went up after the geological surveys)
 

12LDA28C

Established Member
Joined
14 Oct 2022
Messages
5,058
Legal challenges aren't the big cost of thr tunnel; it's the tunnel itself which is in a very unexpectedly odd geological area apparently (hence the cost went up after the geological surveys)

Legal challenges certainly add cost if they cause any delay to the project with a price to be paid for lost productivity and so on.
 

Topological

Established Member
Joined
20 Feb 2023
Messages
4,257
Location
Swansea
For Stonehenge, the final decision is due very soon:


Having side-lined UNESCO’s pleas to change plans, the only thing stopping the contractors from starting work at Stonehenge World Heritage Site is the legal appeal against Judge Holgate’s dismissal of the challenge last February. The Court of Appeal has granted our partners Save Stonehenge World Heritage Site a hearing. BUT the Development Consent Order is still in place and the construction work is shovel ready.​


For Labour to then not put the shovels in the ground would seem very remiss.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,984
Location
Surrey
For Stonehenge, the final decision is due very soon:




For Labour to then not put the shovels in the ground would seem very remiss.
Not really 1.7B pays for a lot more worthy causes than saving the middle class west country road trips 10-15mins
 

vic-rijrode

Member
Joined
31 Aug 2016
Messages
439
Not really 1.7B pays for a lot more worthy causes than saving the middle class west country road trips 10-15mins
Is it only the "middle class" that uses the A303 to get to Devon and Cornwall? Please...

You'll be stating next that it's only the upper class that will be using HS2.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,984
Location
Surrey
Is it only the "middle class" that uses the A303 to get to Devon and Cornwall? Please...

You'll be stating next that it's only the upper class that will be using HS2.
Of course its not but Labour know where they need target whatever cash they have spare and it aint on a tunnel under Stonehenge that wont be built for another five years.
 

Topological

Established Member
Joined
20 Feb 2023
Messages
4,257
Location
Swansea
Is it only the "middle class" that uses the A303 to get to Devon and Cornwall? Please...

You'll be stating next that it's only the upper class that will be using HS2.
My take on it was that it makes staycations down to Devon and Cornwall easier for a whole set of Labour voters. However, I may be wrong about Londoners holiday destinations these days.

Giving better journeys between the South West and London makes a lot of sense from so many perspectives.

I appreciate this is a railway forum though.

I would actually place Stonehenge above HS2 to Euston, if it were possible to get more Elizabeth Line trains to OOC.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,984
Location
Surrey
I would actually place Stonehenge above HS2 to Euston, if it were possible to get more Elizabeth Line trains to OOC.
Well they've been given an extra 10 trains in anticipation and with the cut down version of HS2 its not going to be taxed now for many years if ever so no rush to get to Euston
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
Well they've been given an extra 10 trains in anticipation and with the cut down version of HS2 its not going to be taxed now for many years if ever so no rush to get to Euston
The issue isn't HS2 but Old Oak Common. Extending the Paddington terminators will be thye capcity to get passengers away. The other services from west of Old Oak Common will be already full at Peak times if some of the local media is to be believed.

I don't think there will be enough services to remove people from Old Oak Common without Euston just as I don't think there will be enough services at Euston to remove the people without Old Oak Common.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,268
The issue isn't HS2 but Old Oak Common. Extending the Paddington terminators will be thye capcity to get passengers away. The other services from west of Old Oak Common will be already full at Peak times if some of the local media is to be believed.

I don't think there will be enough services to remove people from Old Oak Common without Euston just as I don't think there will be enough services at Euston to remove the people without Old Oak Common.
If they extend all the Paddington terminators to Old Oak Common there would be enough capacity to absorb the rump HS2 traffic.......

The ordered additional 345 trainsets should be sufficient for this.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,661
Fair play to them, I said to many people it will be the same short sighted decision making of the previous lot and not to expect anything different. I said it would take a year, so to achieve that in less than a month is quite an achievement.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
If they extend all the Paddington terminators to Old Oak Common there would be enough capacity to absorb the rump HS2 traffic.......

The ordered additional 345 trainsets should be sufficient for this.
and locfal traffic generated by the general devlopment of this area? Isn't the idea meant to be another Stratford (London) type development for the surrounding area?
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,268
and locfal traffic generated by the general devlopment of this area? Isn't the idea meant to be another Stratford (London) type development for the surrounding area?
The traffic from the local area would be spread over the other transport systems in the area (Central Line et al).
I'm not sure any plausible redevelopment could truly overwhelm the capacity of Crossrail.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,942
Location
London
If they extend all the Paddington terminators to Old Oak Common there would be enough capacity to absorb the rump HS2 traffic.......

The ordered additional 345 trainsets should be sufficient for this.

The 345s would be fine, but the infrastructure needs some investment, notably CBTC deployed out to Old Oak Common if there is to be quick turnarounds and 24tph on that (small) part of the GWML.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,235
If they extend all the Paddington terminators to Old Oak Common there would be enough capacity to absorb the rump HS2 traffic.......

The ordered additional 345 trainsets should be sufficient for this.
TfL say the extra 10 are sufficient for 18tph to OOC as well as some other improvements.
There are options for 13 more that would get the service level to 26/28tph to OOC from the core.
 

rower40

Member
Joined
1 Jan 2008
Messages
577
Part of the extra Stonehenge Tunnel cost is to put the stones on a turntable so that they can be adjusted between GMT and BST.
 