In the PWI video above they explain that there are temporary extra steel props each side of the piers, while the segments are being put into place, to deal with this problem.
The props (with jacks on them) are to prevent the cantilevers tipping over. The pier, and its lever arm longitudinally, are too small to provide a restoring moment if the balanced part-built cantilever starts to tip. It needs its mid-span ends (or at least one of them) fixed to something before the props are removed.

The post-tensioning tendons, some of which are put in with each new pair of sections, hold the sections' faces together. My understanding of that PWI video is that these can hold the bridge together with no help from the props.

== Doublepost prevention - post automatically merged: ==

Good point. Perhaps there’s a similar one visible in the overland section at the northwest end, or where it crosses Moorhall Rd?
There are three pier-mounted expansion joints, plus one on the northern abutment. There are also four piers that are "points of longitudinal fixity". The last expansion joint is 462 m from the final abutment; I think that is the one seen in the video.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
There are three pier-mounted expansion joints, plus one on the northern abutment. There are also four piers that are "points of longitudinal fixity". The last expansion joint is 462 m from the final abutment; I think that is the one seen in the video.
Thanks. Is that from an online resource such as the PWI lecture, that I can have a look at?
 
Last edited:

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
Yes, it's the one previously referred to, in post 157.
Thanks again. I’ve taken a screen grab that sums up what you’ve said:
Screenshot 2024-06-27 at 15.56.33.png
(If you can’t see the 8mage, it’s a presentation slide showing the 3.4 km overall length divided into four sections.)
 
Last edited:

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
New drone video, showing acoustic panels on sides of Colne Valley viaduct (opposite end to where Dominique is building it)

 

vic-rijrode

Member
Joined
31 Aug 2016
Messages
439
New drone video, showing acoustic panels on sides of Colne Valley viaduct (opposite end to where Dominique is building it)

To me, that viaduct looks beautiful and when the temporary road and work areas are restored, it will be a magnificent section of HS2.
 

Geogregor

Member
Joined
16 Sep 2016
Messages
455
Location
London
To me, that viaduct looks beautiful and when the temporary road and work areas are restored, it will be a magnificent section of HS2.

True.

Unfortunately it looks like passengers won't be able to see anything apart from the wall of sound barriers...
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
In the earlier discussions of the barriers, (seems to get repeated every time someone notices), they were described as transparent, it’s all a bit weird.
 

stuving

Member
Joined
26 Jan 2017
Messages
722
In the earlier discussions of the barriers, (seems to get repeated every time someone notices), they were described as transparent, it’s all a bit weird.
In the PWI video (see post 157; around 12:00) the barriers are described as "partially transparent". Now the lower part is a separate concrete outer parapet, so that's always opaque. But I think the upper part is transparent in some places and not in others.

I have a vague memory that using transparent barriers for the main over-water sections was beneficial in reducing the structure's visual intrusiveness. I'd guess that the opaque bits are also as much to stop others seeing the trains, as to stop passengers seeing whatever its neighbours are up to.
 

vic-rijrode

Member
Joined
31 Aug 2016
Messages
439
True.

Unfortunately it looks like passengers won't be able to see anything apart from the wall of sound barriers...
Yes, those who pay the preseumably premium prices for travel on HS2 won't get the benefit of great views, but those on the A412 and local roads through the lakes will. It's pity that I used to travel that way daily but now live 300 miles away.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
In the PWI video (see post 157; around 12:00) the barriers are described as "partially transparent". Now the lower part is a separate concrete outer parapet, so that's always opaque. But I think the upper part is transparent in some places and not in others.
Correct. Wherever possible it is hybrid barriers that have the lower half acoustic panels and transparent acrylic above 1.65m. The acoustic panels are a mineral wool/galvanised steel sandwich with the lower half intended to reduce noise from the track/wheels and full-height acoustic panels are only used where necessary. The view of the lower half is blocked from the outside by a continuous parapet.

1719852429287.png
Image Description: A computer-generated image of the view from the HS2 Colne Valley viaduct with the noise barriers shown.
[Source]
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
Another new drone video, slightly further along the line, but also in Colne valley, around Breakspear Road. Looks like they need lot of fill to create an embankment between the new concrete bridges

 

Flying Phil

Established Member
Joined
18 Apr 2016
Messages
2,083
We drove along the A412 yesterday and went under that section of the viaduct, complete with its accoustic barriers. They have made it look a bit "bulkier" but it is still very graceful. Looking forward to seeing it completed and later having trains running.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
Latest video by Simonc.

Good progress by “Dominique”, there are now only 3 piers left visible between the front of the machine and the start of the embankment section towards Harvil Road and the Copthall tunnel. (4 if you add the pier under the end of the gantry.)

I think they could possibly finish installing viaduct sections during August?

I hope this is of interest:

 
Last edited:

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Google Streetview has views from last month (June) on the A412 where the viaduct goes over it.

 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
Another video update of the viaduct progress with Dominique, and the Copthall tunnel works. Loads of clearance under the overhead power lines, (which was discussed a few weeks ago).

 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
In the comments of the latest video from SimonC it is suggested there’ll be one more ‘jump’ to allow the launch girder to stand on the next pier, and that will happen early in the week after the bank holiday, 27th, then the last segment will go in on 5th Sep.

 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
7,983
Location
Surrey
Another video update of the viaduct progress with Dominique, and the Copthall tunnel works. Loads of clearance under the overhead power lines, (which was discussed a few weeks ago).

Great video again have to wonder why the next section needs to be cut and cover?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
Great video again have to wonder why the next section needs to be cut and cover?
There‘s an explanation of sorts on an HS2 web page I saw linked somewhere. A cutting to modern slope angle standards would have apparently meant vast quantities of spoil would have to be taken elsewhere. The cut and cover means it can be stored locally and replaced, with the landscape reinstated as it was. Sounds dubious, but that’s a quick summary.
 