• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Future of the GWR electrification

Status
Not open for further replies.

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,350
Also used to justify the cancelling of the Windermere electrification, because of the scarring of the Lake District landscape (conveniently forgetting that the existing electrified WCML seems to blend in quite nicely now, albeit admittedly with a less obtrusive system).
It was not! Nobody in that part of the world raised any objection whateoever, and the National Park is supporting anything which wiill enhance public transport.
Though the question could be raised as to why a low-speed, single track branch needs more intrusive OHLE than a 100mph main line, other than “that’s how we do it now, stupid boy!”.
It doesn't. Trolley wire on simplified supports has been mentioned.
The Windermere branch doesn't really go through exceptional landscape, anyway. It's pleasant enough but I can't see that installing OHLE would be a major aesthetic crisis.
Nobody says it does or that there would be any problem - except the politicians or their spin doctors who withdrew funding and wanted to divert the blame onto some other (innocent) scapegoat.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

John R

Established Member
Joined
1 Jul 2013
Messages
6,124
It was not!
It most certainly was - by the Secretary of State at the time. The excuse was undoubtedly contrived to justify it, but it was definitely used.


‘We have listened to concerns about electrification gantries spoiling protected landscapes’, Grayling said when confirming the cancellation of plans to electrify the Windermere branch in the Lake District, adding that Northern would begin work to trial an ‘alternative-fuelled’ train on the route by 2021.
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,350
It most certainly was - by the Secretary of State at the time. The excuse was undoubtedly contrived to justify it, but it was definitely used.

Exactly... it was the politician's justification. i defy you to find any amenity or other group which raised any objection. So it is not true to say the electrificatiion was cancelled because of [local] concerns. Note that there is absolutely nothing in his statement to point at (i.e. defame) any specific alleged objector.
The "concerns" he had listened to might well have said "We are not worried by it" - but strictly his statement was the truth! One of the reasons politicians are now held in such low regard, and why they got the drubbing they so richly deserved.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,010
Location
London
It most certainly was - by the Secretary of State at the time. The excuse was undoubtedly contrived to justify it, but it was definitely used.


That smacks more of the SoS just using any old excuse (something he has form for!) when they didn't want to spend the money.
 

John R

Established Member
Joined
1 Jul 2013
Messages
6,124
Exactly... it was the politician's justification. i defy you to find any amenity or other group which raised any objection. So it is not true to say the electrificatiion was cancelled because of [local] concerns. Note that there is absolutely nothing in his statement to point at (i.e. defame) any specific alleged objector.
The "concerns" he had listened to might well have said "We are not worried by it" - but strictly his statement was the truth! One of the reasons politicians are now held in such low regard, and why they got the drubbing they so richly deserved.
The SoS cancelled the scheme and used that justification. So what I said was completely accurate. Nowhere did I do other than repeat the reason he gave. It was obvious at the time that it was an outrageously made-up excuse, and I completely agree it was bollocks.

== Doublepost prevention - post automatically merged: ==

That smacks more of the SoS just using any old excuse (something he has form for!) when they didn't want to spend the money.
Oh, it most definitely was exactly that!
 

vic-rijrode

Member
Joined
31 Aug 2016
Messages
446
It most certainly was - by the Secretary of State at the time. The excuse was undoubtedly contrived to justify it, but it was definitely used.
Could it be that Grayling is a remote decendant of William Wordsworth?
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,341
Location
Nottingham
It doesn't. Trolley wire on simplified supports has been mentioned.
Delta Rail did a report of low cost electrification on branch lines in 2010. I don't know if this was considered for Windermere.

"The objective of the research is to establish if it can be economically feasible to electrify
lowusage branch lines on the National Rail Network. Such lines are currently operated
using diesel multiple unit (DMU) type rolling stock and it is considered that replacing these
with modern tramtype electric vehicles can offer the following benefits:
• Reduced operating costs, particularly with regard to rolling stock
• Immunity from shortterm fluctuations of fuel costs
• A reduction in overall carbon emissions
• Reduced impact on the local environment (air quality and noise levels)
• Improved passenger experience
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,272
Apart from anything else, it's quite bizarre for a Paddington to Oxford terminating service to be an "Inter City" 800/0, as the only Bimode GWR have to operate London services.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,437
Location
Somerset
Apart from anything else, it's quite bizarre for a Paddington to Oxford terminating service to be an "Inter City" 800/0, as the only Bimode GWR have to operate London services.
No more bizarre than having them operate Worcester to Bristol stopping services, which only see wires for about 3 miles.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,513
Location
Taunton or Kent
There are, however at least three settlements whose case for a station is stymied at least in part by the lack of a suitable service to stop at them (Corsham, Royal Wootton Bassett and Wantage). I imagine a lot of the demand at the last of these would be towards Oxford.
Royal Wootton Bassett would be easy to add to the Melksham branch services, however that does currently have a frequency too low to support the business case for the station and I imagine cannot be increased without at least putting in a passing loop at Melksham.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
Apart from anything else, it's quite bizarre for a Paddington to Oxford terminating service to be an "Inter City" 800/0, as the only Bimode GWR have to operate London services.
Why? They are both cities and it’s an express service.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,437
Location
Somerset
Royal Wootton Bassett would be easy to add to the Melksham branch services, however that does currently have a frequency too low to support the business case for the station and I imagine cannot be increased without at least putting in a passing loop at Melksham
I suspect it would also need the added acceleration of emus (or reinstatement of the ability to loop it into the third platform at Chippenham (which would, in itself, be no bad thing).
 

lachlan

Member
Joined
11 Aug 2019
Messages
1,171
Royal Wootton Bassett would be easy to add to the Melksham branch services, however that does currently have a frequency too low to support the business case for the station and I imagine cannot be increased without at least putting in a passing loop at Melksham.
I suspect it would also need the added acceleration of emus (or reinstatement of the ability to loop it into the third platform at Chippenham (which would, in itself, be no bad thing).
Is there also a limitation with capacity into Bristol, through Bath, and into Swindon?

Fingerss crossed the Bristol-Oxford service is a success and becomes regular as this could support reopening the stations.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,272
Why? They are both cities and it’s an express service.
You wouldn't run 800s, with their small end doors and lack of standing space, from London to Brighton, Canterbury or Cambridge.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,864
Location
Beeston (Notts)
You wouldn't run 800s, with their small end doors and lack of standing space, from London to Brighton, Canterbury or Cambridge.
Precisely. It's not as if 800s are running shuttles to Ipswich, Peterborough, Corby, Northampton, Milton Keynes, Banbury, or Oxford (via the other route) either.
 

stuu

Established Member
Joined
2 Sep 2011
Messages
3,770
You wouldn't run 800s, with their small end doors and lack of standing space, from London to Brighton, Canterbury or Cambridge.
The Oxford trains only stop at Reading though, and need to run on the fast lines, so 800s are fine.
 

Benjwri

Established Member
Joined
16 Jan 2022
Messages
3,324
Location
London
The Oxford trains only stop at Reading though, and need to run on the fast lines, so 800s are fine.
To be fair they now stop at Didcot a lot, but that's still intercity, the stopping they do at the end of the London to Penzance runs is far less so than on London to Oxford.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
You wouldn't run 800s, with their small end doors and lack of standing space, from London to Brighton, Canterbury or Cambridge.
Those lines aren’t 125. Are there enough paths for a 110mph train to replace the 800?
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,612
Location
Northampton
Those lines aren’t 125. Are there enough paths for a 110mph train to replace the 800?
Tbh it looks like just about. A single sample shows the 1623 Oxford is 3 minutes ahead of a HEx service at Heathrow Airport Junction. The 1606 Pad-Didcot (110mph cl.387) does Pad-Heathrow Airport jn in 9 minutes rather than the 8.5 of the 80x, so if the Oxford terminator was diagrammed for a 387 it'd be 2.5mins ahead of the HEx at the junction, which is compliant (2 minute headway following a non-stop service). The next departure after the Oxford from Reading is a Taunton via Bristol 6 minutes later, although there may be a problem at Didcot East as the current path has a 4.5 minute gap ahead of the conflicting Cardiff-London. Not quite sure how much time a fast 387 would lose and if it would be unable to make that gap, and there's no slack in the Cardiff east of Didcot to take any time back.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,272
Don't they run (or are planning) to run 387s to Cardiff for special events? A much longer journey at 110mph than London to Didcot.
 

Wilts Wanderer

Established Member
Joined
21 Nov 2016
Messages
3,199
Don't they run (or are planning) to run 387s to Cardiff for special events? A much longer journey at 110mph than London to Didcot.

387s already run to Cardiff on a daily passenger round trip, and there are other short workings to Swindon and Bristol Parkway particularly at weekends.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,272

The plans to replace the A423 Kennington bridge to the south of Oxford are progressing . I believe Network Rail are contributing a small amount to the cost, so that it's high enough for electrification underneath.

10134675


Labour councillor Susanna Pressel, who represents Oxford on both city and county level, said: “This massive project has been in the pipeline for years.

"The bridge needs to be replaced soon, but the work was delayed, so that it could tie in with the Environment Agency’s work on the new Oxford Flood Alleviation Scheme, which finally got planning permission last week, after many delays.

"The new channel will pass under the Kennington Bridge, so it makes sense for them to work together."
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,437
Location
Somerset
The implication of what the councillor says is interesting - even had the electrification not been paused (or whatever) by the DfT it would have been held up until all the ducks were aligned here…
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
The implication of what the councillor says is interesting - even had the electrification not been paused (or whatever) by the DfT it would have been held up until all the ducks were aligned here…
I can't see any mention of (lack of) electrification clearance in the article, that was MikeyC's comment.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,437
Location
Somerset
I can't see any mention of (lack of) electrification clearance in the article, that was MikeyC's comment.
However, is it not the case that NR would only need to contribute anything if providing clearance for electrification was an “additional enhancement” rather than replacing like-for-like clearances? Given the fact that electrification clearances have been increased in recent years, it is unlikely that a bridge that now needs replacement already conforms, unless by accident.
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,272

This article from 2022 mentions a Network Rail contribution to the cost, another contribution.

The cost of a project which includes replacing a major bridge and will cause delays for more than two years has soared to £90m from £53m.

Oxfordshire County Council first said Kennington Railway Bridge needed to be replaced in 2019...

...The council hopes to meet the increased cost by receiving another £6m from Network Rail to ensure electric trains can pass under the bridge and a further £4m from the Flood Alleviation Scheme. It hopes to borrow £27.2m.
 

uglymonkey

Member
Joined
10 Aug 2018
Messages
708
The cost overruns on the GWR project has made everyone scared to death of authorising any new long distance electrification projects in this country. ( Or any little ones come to that)Overengineered , maybe but it means we fall further behind Europe for number of track miles wired. Also "It's not in London" comes into play ( "It's only the west country").

I'm sure they made the GWR electrification out of solid gold sometimes.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Given the fact that electrification clearances have been increased in recent years,
I'm unclear about whether there has been any increase in required clearance under a bridge. Perhaps someone on here can explain. Most of the discussion I've seen has been about such matters as the height of parapets on overbridges, or safety for passengers on platforms carrying helium balloons, selfie sticks, fishing rods etc.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,612
Location
Northampton
The implication of what the councillor says is interesting - even had the electrification not been paused (or whatever) by the DfT it would have been held up until all the ducks were aligned here…
It's possible NR had a plan to deal with electrification if the bridge wasn't raised through lowering the track, but as the opportunity came up to rebuild the bridge they might as well.
Overengineered , maybe but it means we fall further behind Europe for number of track miles wired.
According to the wikipedia list of Route-KM, we are 16th globally. I'd be interested to know what our Route:Track KM ratio looks like in comparison to other countries, but I'd imagine that we're not too bad on that front in Europe. Anybody got a link to some decent statistics on Route and Track KM by electrifcation type?
 
Status