Cambridge South new station opening

mr_moo

Member
Joined
7 Sep 2009
Messages
658
Location
Cambridgeshire
There would still be plenty of slues involved!
That central island platform is 8m wide so we would instead have had two separate 8m wide platforms with bridges etc. Would probably have taken up more space overall.

The very early options did look at that arrangement as an option, but I wasn't on the project back then so don't know why we ended up with the decision we are building now.

East West Rail is very much in its infancy of course, but their initial thinking is to change usage of the platforms and pair by use, not direction, as they will be 4-tracking all the way from Shepreth Branch Junction to Cambridge.

== Doublepost prevention - post automatically merged: ==

On a broad point, the station is clearly coming together as an architectural marvel. It's pleasurable to see new stations with some design thought put into them - clearly there is more money available here than in other recent station (re-)opening projects that have completed recently.
Thank you. It does look impressive! I'm quite proud to be a part of the team building it.

It has it cost challenges of course, just as any other project does, but this one was indeed wanted to be a 'landmark' station by the funders.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

William3000

Member
Joined
24 May 2011
Messages
605
Location
Cambridgeshire
The key factor is minimising the land take both from the grounds of the buildings in Francis Crick Avenue and from Hobsons Park.

The guided busway opened in 2011 so the bridge was there long before the station was first suggested.
The station was explicitly mentioned in the Cambridgeshire & Peterborough Structure Plan of 2003. I recall people talking about it as far back as the early 1990s!
 

AlbertBeale

Established Member
Joined
16 Jun 2019
Messages
3,188
Location
London
There would still be plenty of slues involved!
That central island platform is 8m wide so we would instead have had two separate 8m wide platforms with bridges etc. Would probably have taken up more space overall.

The very early options did look at that arrangement as an option, but I wasn't on the project back then so don't know why we ended up with the decision we are building now.

East West Rail is very much in its infancy of course, but their initial thinking is to change usage of the platforms and pair by use, not direction, as they will be 4-tracking all the way from Shepreth Branch Junction to Cambridge.

Paired by use is obviously useful operationally (though to balance use of each pair of tracks, presumably there'd be crossovers near the junction to allow at least some trains to switch across at times), but it's also much less useful for passengers, who clearly appreciate cross-platform interchange between services in the same direction.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,411
Location
The Fens
it's also much less useful for passengers, who clearly appreciate cross-platform interchange between services in the same direction.
The Cambridge South layout being constructed does not provide for cross platform interchange with lines paired by direction.

Cambridge South is not designed to be an interchange station, it is primarily a destination station for the Biomedical Campus.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,629
Location
Northampton
Paired by use is obviously useful operationally (though to balance use of each pair of tracks, presumably there'd be crossovers near the junction to allow at least some trains to switch across at times), but it's also much less useful for passengers, who clearly appreciate cross-platform interchange between services in the same direction.
Passengers prefer on-time trains over interchange provision they're unlikely to use. What kind of flows are you envisaging interchanging there? Stevenage to Stanstead is hardly a major flow, competing with Luton Airport.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,598
Location
Torbay
Passengers prefer on-time trains over interchange provision they're unlikely to use. What kind of flows are you envisaging interchanging there? Stevenage to Stanstead is hardly a major flow, competing with Luton Airport.
Paired by use between Cambridge and Shepreth Branch Junction will give cross-platform interchange on the centre island for a journey from Stansted to Stevenage. However, passengers will need to cross the footbridge between the outer side platforms for the same trip in the opposite direction. An alternative paired by direction layout with twin directional islands would require a footbridge transfer in both directions for this particular journey. It would give more convenient interchange than Cambridge for some journeys continuing across the city in the same direction however, but the arrangement would introduce additional junction conflicts as Hitchin and Bedford bound trains would always need to cross the down flow from Liverpool Street south of the new station and possibly in the Cambridge throat as well depending on which platforms the trains were using there. Four tracking throughout on the south approach removes these conflicts and favours the paired by use configuration. It gives a consistent platform, every time, heading south for Liverpool Street and Kings Cross/TL. Going north, the next train to Cambridge and beyond might be from one of two platforms, so I expect some people will wait on the foot bridge to see which arrives first. The glazed side looks south so people will be able to see trains approaching from that direction. It shouldn't be a long wait however so crowds shouldn't build up too much. The main argument for the design being built is that the entrances on both sides can be more easily integrated into the side platforms, minimising land take. I favoured a twin island arrangement in the past, but the current design makes more sense with EWR intending to provide two separate pairs throughout from Cambridge station to the junction in the future.

This is a great example of paired by direction not always being superior to paired by use.
 
Last edited:
Joined
7 May 2023
Messages
62
Location
Cambridge

Shot this yesterday, it shows new track out new Shepereth Junction, and the new building framework on the Hospital side of the train station.
 

neill

Member
Joined
4 Apr 2012
Messages
193

Shot this yesterday, it shows new track out new Shepereth Junction, and the new building framework on the Hospital side of the train station.
Very nice! I haven’t been down to the junction for a while, so nice to see progress on the track.

Here is a photo from this morning with yet another interesting Liebherr product. Looks like the stairs might be about to go in on the east side.

== Doublepost prevention - post automatically merged: ==

Update (26/6): another beautiful morning in Cambridge and the cranes are in action once again.

== Doublepost prevention - post automatically merged: ==

Update 26/6 evening: steady progress today on the stairs.
 

Attachments

  • IMG_7468.jpeg
    IMG_7468.jpeg
    4.3 MB · Views: 194
  • IMG_7477.jpeg
    IMG_7477.jpeg
    2.2 MB · Views: 128
  • IMG_7479.jpeg
    IMG_7479.jpeg
    2.5 MB · Views: 107
  • IMG_7478.jpeg
    IMG_7478.jpeg
    3.6 MB · Views: 107
Last edited:

WesternBiker

Member
Joined
26 Aug 2020
Messages
692
Location
South Cambridgeshire
Very nice! I haven’t been down to the junction for a while, so nice to see progress on the track.

Here is a photo from this morning with yet another interesting Liebherr product. Looks like the stairs might be about to go in on the east side.

== Doublepost prevention - post automatically merged: ==

Update (26/6): another beautiful morning in Cambridge and the cranes are in action once again.

== Doublepost prevention - post automatically merged: ==

Update 26/6 evening: steady progress today on the stairs.
Thanks, as ever, for the update.

It's all a good advert for Liebherr vehicles! It looks as though all the platform faces are also now in, as well.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,307
Very nice! I haven’t been down to the junction for a while, so nice to see progress on the track.

Here is a photo from this morning with yet another interesting Liebherr product. Looks like the stairs might be about to go in on the east side.
[…]
Update 26/6 evening: steady progress today on the stairs.
I’d been wondering what those curved sections of precast concrete were for, (you can see them lying on the ground in picture 3 in post #985), looks as if it avoids having a corner on the stairs.
 

neill

Member
Joined
4 Apr 2012
Messages
193
Bah!, beaten to reply #1000!

Looks like the last of the stairs is in. I am curious what the t-shape steel next to the lift shaft is for….

== Doublepost prevention - post automatically merged: ==

Update from Sunday afternoon: roof is going on to rest of building.
 

Attachments

  • IMG_7485.jpeg
    IMG_7485.jpeg
    2.4 MB · Views: 211
  • IMG_7484.jpeg
    IMG_7484.jpeg
    4.2 MB · Views: 210
  • IMG_7501.jpeg
    IMG_7501.jpeg
    3 MB · Views: 130
  • IMG_7500.jpeg
    IMG_7500.jpeg
    3.7 MB · Views: 132
Last edited:

neill

Member
Joined
4 Apr 2012
Messages
193
This week has seen the near completion of the roof, more work on glazing and relocation of the crane away from the new trackbed to the eastern forecourt area.

== Doublepost prevention - post automatically merged: ==

Update: I found myself on the train this afternoon. Here are some video stills of the station.

== Doublepost prevention - post automatically merged: ==

Update: And some Sunday afternoon drone photos. Interesting pattern on the windows...
 

Attachments

  • IMG_7540.jpeg
    IMG_7540.jpeg
    3.9 MB · Views: 247
  • IMG_7541.jpeg
    IMG_7541.jpeg
    4.2 MB · Views: 266
  • IMG_7542.jpeg
    IMG_7542.jpeg
    3.9 MB · Views: 235
  • IMG_7546.jpeg
    IMG_7546.jpeg
    2.4 MB · Views: 239
  • IMG_7545.jpeg
    IMG_7545.jpeg
    3 MB · Views: 235
  • IMG_7550.png
    IMG_7550.png
    3 MB · Views: 164
  • IMG_7551.png
    IMG_7551.png
    3 MB · Views: 170
  • IMG_7553.png
    IMG_7553.png
    3 MB · Views: 186
  • DJI_20240707172108_0032_D.jpeg
    DJI_20240707172108_0032_D.jpeg
    1.5 MB · Views: 166
  • DJI_20240707171758_0028_D.jpeg
    DJI_20240707171758_0028_D.jpeg
    1.6 MB · Views: 163
  • DJI_20240707171819_0029_D.jpeg
    DJI_20240707171819_0029_D.jpeg
    1.2 MB · Views: 164
Last edited:

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,376
Location
belfast
Looks like good progress!

I'm hoping that mr_moo will be able to return to sharing updates as well now purdah is over
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,037
Location
Surrey
This week has seen the near completion of the roof, more work on glazing and relocation of the crane away from the new trackbed to the eastern forecourt area.

== Doublepost prevention - post automatically merged: ==

Update: I found myself on the train this afternoon. Here are some video stills of the station.

== Doublepost prevention - post automatically merged: ==

Update: And some Sunday afternoon drone photos. Interesting pattern on the windows...
This team are setting the gold standard for construction speed and shows what can be achieved.
 

neill

Member
Joined
4 Apr 2012
Messages
193
Not my video, but the first few minutes of this give a cab view that looks fairly recent - the footbridge is in.


== Doublepost prevention - post automatically merged: ==

It’s been a pretty quiet week. Here are some photos of the station building from yesterday (20th July). Not much visible change from last week.
 

Attachments

  • IMG_7625.jpeg
    IMG_7625.jpeg
    4.1 MB · Views: 94
  • IMG_7629.jpeg
    IMG_7629.jpeg
    2.8 MB · Views: 94
  • IMG_7628.jpeg
    IMG_7628.jpeg
    3.2 MB · Views: 94
Last edited:

neill

Member
Joined
4 Apr 2012
Messages
193
Construction has certainly slowed for the summer. Only notable change I can see this week is that the concrete for the first floor on the west side station building was poured.

== Doublepost prevention - post automatically merged: ==

Update: here are some photos from the last few days. Geotextile and ballast have been going in for P1/2.
 

Attachments

  • IMG_7720.jpeg
    IMG_7720.jpeg
    5 MB · Views: 102
  • IMG_7716.jpeg
    IMG_7716.jpeg
    4 MB · Views: 96
  • IMG_7717.jpeg
    IMG_7717.jpeg
    3.7 MB · Views: 97
  • IMG_7718.jpeg
    IMG_7718.jpeg
    3.4 MB · Views: 96
  • IMG_7719.jpeg
    IMG_7719.jpeg
    4.5 MB · Views: 97
  • IMG_7706.jpeg
    IMG_7706.jpeg
    5 MB · Views: 100
  • IMG_7709.jpeg
    IMG_7709.jpeg
    4.8 MB · Views: 99
  • IMG_7709.jpeg
    IMG_7709.jpeg
    4.8 MB · Views: 97
  • IMG_7710.jpeg
    IMG_7710.jpeg
    4.9 MB · Views: 105
Last edited:

TiddlyPom

Member
Joined
2 Feb 2021
Messages
17
Location
South Cambridgeshire
Construction has certainly slowed for the summer. Only notable change I can see this week is that the concrete for the first floor on the west side station building was poured.

== Doublepost prevention - post automatically merged: ==

Update: here are some photos from the last few days. Geotextile and ballast have been going in for P1/2.
Thanks for the update.

A slightly naive question, but what do the changes to Shepreth Junction achieve? My guess is the speed over the junction is improved, but is there anything else?
 

neill

Member
Joined
4 Apr 2012
Messages
193
I think it is all detailed further up the thread by people with better knowledge than I, but from memory yes improved speed in both directions and a longer lead in so that the junction is effectively moved north a hundred meters or so. I think the intent is to create enough of a time saving that most existing trains can stop at the new station without a complete timetable rewrite.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,411
Location
The Fens
what do the changes to Shepreth Junction achieve? My guess is the speed over the junction is improved,
Yes. This is particularly significant for trains going to and from the Kings Cross line where the speed over the junction is currently only 30mph.

The existing layout dates from a time when the fast Cambridge trains were to and from Liverpool Street, and the only passenger trains going the other way were 2 car DMU shuttles to Royston.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,662
You would be able to terminate on all platforms at Cambridge South from the London direction and head back.
 

William3000

Member
Joined
24 May 2011
Messages
605
Location
Cambridgeshire
Yes. This is particularly significant for trains going to and from the Kings Cross line where the speed over the junction is currently only 30mph.

The existing layout dates from a time when the fast Cambridge trains were to and from Liverpool Street, and the only passenger trains going the other way were 2 car DMU shuttles to Royston.
Trains still travel fast through Shepreth Junction to and from London Liverpool Street at up to 90mph!
 