Cambridge South new station opening

mr_moo

Member
Joined
7 Sep 2009
Messages
658
Location
Cambridgeshire
If anyone's interested, there's a talk about the project being given online next Wednesday at 17:45.

Or if you are anywhere near Reading, you can go to it in person too, and you can get the more personal experiance and join the speaker and the section members in the pub afterwards for more discussion.

Thames Valley Section hybrid meeting​


Synopsis: Philip, the lead Network Rail engineer for the new station and associated infrastructure enhancements at Cambridge South, will describe the project to build the new station. It will include discussion of the station building, the complex systems integration, ‘Minimum Viable Product’ and Project SPEED principles being applied, and the wider infrastructure upgrades being implemented in the Cambridge area to facilitate the stations construction. Philip will outline the challenging timescales and pressures that exist, the integration with the Cambridge area re-signalling project, and discuss some of the unusual challenges imposed by external stakeholders


Meeting in-person from 17:00 for refreshments courtesy of the PWI for a 17:45 start for all.


You can also join the meeting virtually through Microsoft Teams.


Join on your computer, mobile app or room device


Click here to join the meeting


Meeting ID: 374 253 412 386
Passcode: UGucBz
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

neill

Member
Joined
4 Apr 2012
Messages
193
Thanks for the updates @mr_moo. Do you or anyone else here know if the talk recording will be available afterwards for those of us that can’t join live?

In construction related news today saw the first steels being lifted in for the east side station building. I’ve also included a photo of the first floor of the west building which has been going in recently.
 

Attachments

  • IMG_7231.jpeg
    IMG_7231.jpeg
    4.5 MB · Views: 163
  • IMG_7232.jpeg
    IMG_7232.jpeg
    3.8 MB · Views: 160

neill

Member
Joined
4 Apr 2012
Messages
193
Work continues at pace this morning - a few more steels up since yesterday evening.

== Doublepost prevention - post automatically merged: ==

Evening Update: More steel work up during the day and crane still here so I guess more tomorrow. On the west side the fittings for the glass walls have started to be hung.

== Doublepost prevention - post automatically merged: ==

Friday update: Further progress on the steelwork. You can now see where the other end of the footbridge will connect. There is also a very large crane being assembled.
 

Attachments

  • IMG_7233.jpeg
    IMG_7233.jpeg
    2.9 MB · Views: 222
  • IMG_7235.jpeg
    IMG_7235.jpeg
    4.9 MB · Views: 160
  • IMG_7234.jpeg
    IMG_7234.jpeg
    4.1 MB · Views: 160
  • IMG_7239.jpeg
    IMG_7239.jpeg
    4.2 MB · Views: 112
  • IMG_7236.jpeg
    IMG_7236.jpeg
    4.2 MB · Views: 110
  • IMG_7237.jpeg
    IMG_7237.jpeg
    3.7 MB · Views: 111
Last edited:

mr_moo

Member
Joined
7 Sep 2009
Messages
658
Location
Cambridgeshire
Hi all. I can confirm that the big crane is, fairly obviously, for the big lift! The footbridges should be installed tomorrow.

Main lift of the main bridge span is scheduled for early to mid afternoon tomorrow. Stairs will be going in before that in the morning.

Enjoy. :)
 

neill

Member
Joined
4 Apr 2012
Messages
193
I was about with the drone earlier today and by co-incidence the bridge arrived. Here are a couple of photos. Video to follow.

== Doublepost prevention - post automatically merged: ==

Update on Saturday midday: half the stairs are in.

== Doublepost prevention - post automatically merged: ==

Update 3pm: Looks like the first bridge lift should be in the very near future.

Someone earlier requested a photo of a helicopter and a crane - here you go :).

== Doublepost prevention - post automatically merged: ==

Update Saturday 5pm: The bridge is in.
 

Attachments

  • DJI_20240607144544_0061_D (1).jpeg
    DJI_20240607144544_0061_D (1).jpeg
    1.3 MB · Views: 256
  • DJI_20240607150259_0071_D (1).jpeg
    DJI_20240607150259_0071_D (1).jpeg
    1.1 MB · Views: 241
  • DJI_20240607150611_0074_D (1).jpeg
    DJI_20240607150611_0074_D (1).jpeg
    1.4 MB · Views: 230
  • DJI_20240607150353_0072_D (1).jpeg
    DJI_20240607150353_0072_D (1).jpeg
    976.6 KB · Views: 230
  • DJI_20240607145614_0068_D (1).jpeg
    DJI_20240607145614_0068_D (1).jpeg
    1.1 MB · Views: 243
  • IMG_7253.jpeg
    IMG_7253.jpeg
    3.2 MB · Views: 179
  • IMG_7254.jpeg
    IMG_7254.jpeg
    3 MB · Views: 173
  • IMG_7256.jpeg
    IMG_7256.jpeg
    4.4 MB · Views: 173
  • IMG_7277.jpeg
    IMG_7277.jpeg
    3.1 MB · Views: 156
  • IMG_7272.jpeg
    IMG_7272.jpeg
    2.3 MB · Views: 164
  • IMG_7297.jpeg
    IMG_7297.jpeg
    2.7 MB · Views: 157
  • IMG_7287.jpeg
    IMG_7287.jpeg
    2.9 MB · Views: 169
Last edited:

neill

Member
Joined
4 Apr 2012
Messages
193
Thanks @RuddA.

Here are some drone photos from yesterday early afternoon (before the bridge lift). You can see the access/maintenance walkway being fitted onto the bridge, and also work on the formation for P1/P2 south of the station. For anyone that is curious the crane is about 65m high.

I didn't fly during the bridge lift as the drone batteries were charging.

== Doublepost prevention - post automatically merged: ==

Update: Here are some drone photos and photos from the busway bridge from late morning on Sunday. Both bridges are now in place and when I was there small parts for the central junction were being lifted in. That's it from me for the weekend :).

== Doublepost prevention - post automatically merged: ==

.
 

Attachments

  • DJI_20240608144439_0050_D.jpeg
    DJI_20240608144439_0050_D.jpeg
    1.1 MB · Views: 184
  • DJI_20240608144644_0052_D.jpeg
    DJI_20240608144644_0052_D.jpeg
    1.5 MB · Views: 169
  • DJI_20240608144350_0048_D.jpeg
    DJI_20240608144350_0048_D.jpeg
    1.1 MB · Views: 162
  • DJI_20240608143221_0036_D.jpeg
    DJI_20240608143221_0036_D.jpeg
    1.5 MB · Views: 160
  • DJI_20240608143845_0040_D.jpeg
    DJI_20240608143845_0040_D.jpeg
    1.3 MB · Views: 164
  • DJI_20240609110745_0005_D.jpeg
    DJI_20240609110745_0005_D.jpeg
    1.4 MB · Views: 145
  • DJI_20240609112523_0018_D.jpeg
    DJI_20240609112523_0018_D.jpeg
    1.3 MB · Views: 152
  • DJI_20240609112351_0016_D.jpeg
    DJI_20240609112351_0016_D.jpeg
    1.4 MB · Views: 149
  • IMG_7308.jpeg
    IMG_7308.jpeg
    3.3 MB · Views: 137
  • IMG_7305.jpeg
    IMG_7305.jpeg
    3.3 MB · Views: 147
  • IMG_7304.jpeg
    IMG_7304.jpeg
    2.5 MB · Views: 143
  • IMG_7307.jpeg
    IMG_7307.jpeg
    2.2 MB · Views: 147
  • IMG_7306.jpeg
    IMG_7306.jpeg
    4.1 MB · Views: 148
Last edited:

WesternBiker

Member
Joined
26 Aug 2020
Messages
692
Location
South Cambridgeshire
Thanks @RuddA.

Here are some drone photos from yesterday early afternoon (before the bridge lift). You can see the access/maintenance walkway being fitted onto the bridge, and also work on the formation for P1/P2 south of the station. For anyone that is curious the crane is about 65m high.

I didn't fly during the bridge lift as the drone batteries were charging.

== Doublepost prevention - post automatically merged: ==

Update: Here are some drone photos and photos from the busway bridge from late morning on Sunday. Both bridges are now in place and when I was there small parts for the central junction were being lifted in. That's it from me for the weekend :).

== Doublepost prevention - post automatically merged: ==

.
A brilliant series of photographs @neill, and so good to see sustained progress on this. I'm looking forward to using the station once it's opened...!
 
Last edited:

neill

Member
Joined
4 Apr 2012
Messages
193
Thanks @WesternBiker, likewise although given your location might be more local for me!

I've uploaded a hastily edited highlights reel of the main lift. Apologies for the handheld footage!


I have several weekends of drone footage that I've started to edit and should be published this week. Currently at about 25 minutes run time. o_O
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,411
Location
The Fens
Hi all. I can confirm that the big crane is, fairly obviously, for the big lift! The footbridges should be installed tomorrow.

I was about with the drone earlier today and by co-incidence the bridge arrived. Here are a couple of photos. Video to follow.

Update on Saturday midday: half the stairs are in.

Update 3pm: Looks like the first bridge lift should be in the very near future.

Someone earlier requested a photo of a helicopter and a crane - here you go :).

Update Saturday 5pm: The bridge is in.
Thanks to both, and especially for the picture with the helicopter!
 

neill

Member
Joined
4 Apr 2012
Messages
193
It has been a quiet couple of days, however looks like the roof beams for the east building arrived yesterday. Oh and the bridge is held up by a tensioned strap?! :)

== Doublepost prevention - post automatically merged: ==

Update from last night: looks like work might have started on the pedestrian and cycle access path through the park.
 

Attachments

  • IMG_7360.jpeg
    IMG_7360.jpeg
    5.5 MB · Views: 191
  • IMG_7361.jpeg
    IMG_7361.jpeg
    3.8 MB · Views: 195
  • IMG_7363.jpeg
    IMG_7363.jpeg
    4.3 MB · Views: 118
Last edited:

neill

Member
Joined
4 Apr 2012
Messages
193
Thanks @Netwrox. Great presentation.

There is another possession this weekend. Here are some photos. First of the new crossover going in near Hills Road, just south of the existing station. This is to allow parallel moves in/out of platform 7&8.

There is also work underway lifting more of the Cambridge South roof into place.

== Doublepost prevention - post automatically merged: ==

.
 

Attachments

  • IMG_7397.jpeg
    IMG_7397.jpeg
    903.3 KB · Views: 194
  • IMG_7398.jpeg
    IMG_7398.jpeg
    895.8 KB · Views: 190
  • IMG_7400.jpeg
    IMG_7400.jpeg
    964.5 KB · Views: 179
  • IMG_7404.jpeg
    IMG_7404.jpeg
    806.7 KB · Views: 173
  • IMG_7405.jpeg
    IMG_7405.jpeg
    665.3 KB · Views: 169
  • IMG_7409.jpeg
    IMG_7409.jpeg
    1 MB · Views: 173
  • IMG_7412.jpeg
    IMG_7412.jpeg
    3 MB · Views: 172
  • IMG_7411.jpeg
    IMG_7411.jpeg
    2.5 MB · Views: 166
  • IMG_7413.jpeg
    IMG_7413.jpeg
    3.2 MB · Views: 163
  • IMG_7415.jpeg
    IMG_7415.jpeg
    3.3 MB · Views: 160
  • IMG_7416.jpeg
    IMG_7416.jpeg
    3 MB · Views: 189
Joined
13 Jan 2024
Messages
498
Location
Cambridge
There is another possession this weekend. Here are some photos. First of the new crossover going in near Hills Road, just south of the existing station. This is to allow parallel moves in/out of platform 7&8.
Do you know when this'll be in use? This'll be great as it'll stop late running Thameslinks delaying the kings cross fasts or vice versa
 

neill

Member
Joined
4 Apr 2012
Messages
193
Do you know when this'll be in use? This'll be great as it'll stop late running Thameslinks delaying the kings cross fasts or vice versa
No, other than it’s been mentioned in the video just above (and possibly this thread?) that for now it will be locked out of use initially. If I recall I think there is a dependency on the Cambridge resignalling to bring it into use.
 
Joined
13 Jan 2024
Messages
498
Location
Cambridge
No, other than it’s been mentioned in the video just above (and possibly this thread?) that for now it will be locked out of use initially. If I recall I think there is a dependency on the Cambridge resignalling to bring it into use.
Thanks, I thought that might be the case
 

mr_moo

Member
Joined
7 Sep 2009
Messages
658
Location
Cambridgeshire
Yep, the Hils road new crossover can only be brought into use when the new signalling system is switched on, so it's locked out of use for a while yet. Indeed, we have placed a temporary buffer stop back in the same place as the old one, so operationally nothing has changed, even though there's a nice new crossover sitting behind the buffer just waiting to be used!
 

neill

Member
Joined
4 Apr 2012
Messages
193
I can’t believe how fast things are moving. The the roof is on over the bridge.
 

Attachments

  • IMG_7420.jpeg
    IMG_7420.jpeg
    3.5 MB · Views: 165
  • IMG_7422.jpeg
    IMG_7422.jpeg
    4.1 MB · Views: 164
  • IMG_7423.jpeg
    IMG_7423.jpeg
    4.1 MB · Views: 164

mr_moo

Member
Joined
7 Sep 2009
Messages
658
Location
Cambridgeshire
You'll also notice if you look closely that some of the glazing has gone up too now!
East side of the building. Bit hard to see from the bridge but I'll share some photos when able.
 

neill

Member
Joined
4 Apr 2012
Messages
193
Here is an update video shot on the 24th of May.


I have a couple more that need editing…
 

neill

Member
Joined
4 Apr 2012
Messages
193
You'll also notice if you look closely that some of the glazing has gone up too now!
East side of the building. Bit hard to see from the bridge but I'll share some photos when able.
Here is the best I can do on the glazing. Look directly under the right side of the bridge if you are having seeing it.

The other photo from today shows continuing rapid progress on the steel structure for the other building.
 

Attachments

  • IMG_7435.jpeg
    IMG_7435.jpeg
    3.7 MB · Views: 112
  • IMG_7434.jpeg
    IMG_7434.jpeg
    4.6 MB · Views: 111

mr_moo

Member
Joined
7 Sep 2009
Messages
658
Location
Cambridgeshire
Here is an update video shot on the 24th of May.


I have a couple more that need editing…
Brilliant video as always neill.

Sorry I can't share more at the momment but I will soon.

Cranes are fun - a lot of steel is going up rapidly at present, although there's very little happening on site today due to a separate event.
 

neill

Member
Joined
4 Apr 2012
Messages
193
Brilliant video as always neill.
Thanks.

Next video has been uploaded and will go live at 6pm (BST) tonight. It's from 2024-06-07 just prior to the weekend possession for the bridges to be lifted in. By chance I happened to catch the arrival by road of the two bridge sections which was a nice surprise.


Cranes are fun - a lot of steel is going up rapidly at present, although there's very little happening on site today due to a separate event.
Question is whether the separate event is at the site or not?

== Doublepost prevention - post automatically merged: ==

Update: I managed to get out with the drone this evening. Here are some photos. Looks like more progress on the bridge roof and steelwork.
 

Attachments

  • DJI_20240619202344_0014_D.jpeg
    DJI_20240619202344_0014_D.jpeg
    3.6 MB · Views: 138
  • DJI_20240619201430_0004_D.jpeg
    DJI_20240619201430_0004_D.jpeg
    3.3 MB · Views: 140
  • DJI_20240619201848_0008_D.jpeg
    DJI_20240619201848_0008_D.jpeg
    3.8 MB · Views: 143
  • DJI_20240619202224_0012_D.jpeg
    DJI_20240619202224_0012_D.jpeg
    3.6 MB · Views: 144
  • DJI_20240619202604_0016_D.jpeg
    DJI_20240619202604_0016_D.jpeg
    3.8 MB · Views: 142
Last edited:

mr_moo

Member
Joined
7 Sep 2009
Messages
658
Location
Cambridgeshire
Great pics as always. Thanks neill. I'm itching to share some of mine too!

Separate event was a regular safety stand down / review - we do them every so often to ensure we keep going in a safe manner, make sure everyone is up to date, has a chance to discuss safety things openly etc etc, share experiance, sometimes get in the cab of a digger for example to see what the driver can (or more accurately, can't!) see and thus better understand the dangers when working near them. That sort of thing. Really useful and reallty good practice.
 

Tobberz

Member
Joined
9 Jan 2018
Messages
113
On a broad point, the station is clearly coming together as an architectural marvel. It's pleasurable to see new stations with some design thought put into them - clearly there is more money available here than in other recent station (re-)opening projects that have completed recently.
 

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,578
Location
Brighton
Given that budget I still feel it's a shame it couldn't have been built as a pair of directional island platforms. Wouldn't have needed the slues at all had that been the case. :)

I suspect this was mainly due to the MGB bridge opening, but I seem to recall reading it was about reducing the land take as well?
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,411
Location
The Fens
Given that budget I still feel it's a shame it couldn't have been built as a pair of directional island platforms. Wouldn't have needed the slues at all had that been the case. :)

I suspect this was mainly due to the MGB bridge opening, but I seem to recall reading it was about reducing the land take as well?
The key factor is minimising the land take both from the grounds of the buildings in Francis Crick Avenue and from Hobsons Park.

The guided busway opened in 2011 so the bridge was there long before the station was first suggested.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,629
Location
Northampton
Given that budget I still feel it's a shame it couldn't have been built as a pair of directional island platforms. Wouldn't have needed the slues at all had that been the case. :)
I suspect you'd have needed the Slues either way as there'd need to be a clear zone for constructing the inside platforms.

Not sure if the proposals for the long-term 4-tracking would revert to paired by use as well, so islands wouldn't be directional under that situation.
 