childwallblues
Established Member
Not the Northern ones. The conversions are the es GW units.Interesting…
Not the Northern ones. The conversions are the es GW units.Interesting…
Presumably the units which were moved from Long Marston to Doncaster a couple of weeks ago.Not the Northern ones. The conversions are the es GW units.
I think the canning industry could help.Those ex-GW units are seemingly roaming round looking for a problem to which they can be a solution.
Nothing to do with Porterbrook investing significantly in BrodiesThe Glasgow ones make some sense, to cover partial electrification to East Kilbride and to deal with the Ayr drama.
East Kilbride will be full electrification and the Ayr drama is almost over.The Glasgow ones make some sense, to cover partial electrification to East Kilbride and to deal with the Ayr drama.
Not for 769s surely?Yes APCO will be provided at Stalybridge.
They are only allowed to switch at stations.I remember about 2 weeks ago I was on a Class 769 from Wigan Wallgate to Bolton where it uses diesel engines for that section. The train was held for about 2 mins at a red signal just before Lostock Junction where I'm sure there is live OHLE before joining the mainline. What I don't understand is why the 769 couldn't have switched to electric mode there and did it at Bolton instead?
The OHLE is only live on the down line (towards Wigan for a short distance) in case of a wrong route taken at Lostock junction by an electric train. Whilst OHLE is being put in place between Lostock junction and Wigan, non of it is electrified yet*.I remember about 2 weeks ago I was on a Class 769 from Wigan Wallgate to Bolton where it uses diesel engines for that section. The train was held for about 2 mins at a red signal just before Lostock Junction where I'm sure there is live OHLE before joining the mainline. What I don't understand is why the 769 couldn't have switched to electric mode there and did it at Bolton instead?
Quite.They are only allowed to switch at stations.
East Kilbride will be full electrification and the Ayr drama is almost over.
Without wanting to go off topic, plenty of flimsy OHLE in Europe and also examples of running diesel under wires for extended periods.Quite.
This is red tape England, not mainland Europe where OLE is more robust and actually used to save diesel emissions.
Quite.
This is red tape England, not mainland Europe where OLE is more robust and actually used to save diesel emissions.
There is also the pragmatic, reality of operations - these majority of issues that have arisen with these units since introduction in 2021 have involved the power changeover. If there is a risk to operations it's better to be at a station where passengers can be detrained or managed if a problem arises.Quite.
This is red tape England, not mainland Europe where OLE is more robust and actually used to save diesel emissions.
And where, if necessary, other things can get round them.There is also the pragmatic, reality of operations - these majority of issues that have arisen with these units since introduction in 2021 have involved the power changeover. If there is a risk to operations it's better to be at a station where passengers can be detrained or managed if a problem arises.
That's interesting considering the insistence of many here (before they were introduced) that their performance would fall below 150s/156s. They are also more comfortable and much quieter than the deafening thrash of the Sprinters. One question, - what sort of gradients are they likely to encounter on the GSW routes?Ayr drama all over. Full electric service has resumed.
The "Brodie" 769s have been tested extensively on all the GSW routes (Stranraer excluded at the moment) currently operated by a class 156. Initial chat from people involved is that they outperform the 156s on all routes.
If platform 3 is blocked at bolton, can a southbond service run through platform 4? The track layout on tracksy suggests it's possible but I know sometimes things allowed by the track layout aren't allowed by the signalling.
Whilst every through platform has a signal at both ends, platform 3 is not fully bidirectional for Chorley-bound departures, and Platform 5 is not available for southbound through services, so not every platform is truly bi-directional.Yes, all platforms at Bolton can be used bi-directionally. The situation you describe has occurred many times.
That's interesting considering the insistence of many here (before they were introduced) that their performance would fall below 150s/156s. They are also more comfortable and much quieter than the deafening thrash of the Sprinters. One question, - what sort of gradients are they likely to encounter on the GSW routes?

That's encouraging. The 769s, operating as diesel electrics aren't that short of torque so even if their progress is slow, they will usually get to the top, (the 319s were designed to cope with a standing start into a 1:27 in the Thameslink core) so the motors can obviously cope with the additional heat that a much more gentle 1:60+ creates. From posts here, I recall that there were issues particularly on the Welsh valley lines where a long drag up from Heath station could result in some engine overheating issues, so maybe Brodie addressed the prime mover cooling durability.Leaving Barrhead going south it's a 3.5mile climb of between 1 in 67 - 70. This is the steepest part of the route to Kilmarnock. Brodie Engineering were contracted by Porterbrook to carry out reliability and performance improvements to the 769s, and it appears they have been successful.
769 002 is also now at Brodie Engineering in Kilmarnock - staff pictured in front of it on Armed Forces day last week - pic off Brodie Engineering LinkedIn page
View attachment 161216
Is that another Welsh Class 769 behind them, or is that something else?769 002 is also now at Brodie Engineering in Kilmarnock - staff pictured in front of it on Armed Forces day last week - pic off Brodie Engineering LinkedIn page
I think it may be another coach from the same unit.Is that another Welsh Class 769 behind them, or is that something else?
Leaving Barrhead going south it's a 3.5mile climb of between 1 in 67 - 70. This is the steepest part of the route to Kilmarnock. Brodie Engineering were contracted by Porterbrook to carry out reliability and performance improvements to the 769s, and it appears they have been successful.
769 002 is also now at Brodie Engineering in Kilmarnock - staff pictured in front of it on Armed Forces day last week - pic off Brodie Engineering LinkedIn page
View attachment 161216
That is just 2 vehicles of that unit. I was actually standing behind the camera (person) when that picture was taken.Is that another Welsh Class 769 behind them, or is that something else?
Agree, but when the Lostock Jn-Wigan Station Junc is complete, where will the changeover for Man Ox Road-Southport services be (most booked 769 but many 150/6 used because of 769 unavailability), as from memory they didn't stop at Ince - even when Ince was open? Would it be Hindley, as leaving it at Bolton would make a nonsense of the electrification which then would only be of any use for WNW-Stalybridge services, or is there a master plan for 2025 onwards when the lease on the 769's was originally up (did hear a rumour now extended to 2027)??There is also the pragmatic, reality of operations - these majority of issues that have arisen with these units since introduction in 2021 have involved the power changeover. If there is a risk to operations it's better to be at a station where passengers can be detrained or managed if a problem arises.