Porterbrook Cl.769 'Flex' trains from 319s, initially for Northern

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

b0b

Established Member
Joined
25 Jan 2010
Messages
1,371
The Glasgow ones make some sense, to cover partial electrification to East Kilbride and to deal with the Ayr drama.
 

GhostManDN91

Member
Joined
2 Oct 2022
Messages
147
Location
Wigan
I remember about 2 weeks ago I was on a Class 769 from Wigan Wallgate to Bolton where it uses diesel engines for that section. The train was held for about 2 mins at a red signal just before Lostock Junction where I'm sure there is live OHLE before joining the mainline. What I don't understand is why the 769 couldn't have switched to electric mode there and did it at Bolton instead?
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,660
Location
Greater Manchester
I remember about 2 weeks ago I was on a Class 769 from Wigan Wallgate to Bolton where it uses diesel engines for that section. The train was held for about 2 mins at a red signal just before Lostock Junction where I'm sure there is live OHLE before joining the mainline. What I don't understand is why the 769 couldn't have switched to electric mode there and did it at Bolton instead?
They are only allowed to switch at stations.
 

scrapy

Established Member
Joined
15 Dec 2008
Messages
2,313
I remember about 2 weeks ago I was on a Class 769 from Wigan Wallgate to Bolton where it uses diesel engines for that section. The train was held for about 2 mins at a red signal just before Lostock Junction where I'm sure there is live OHLE before joining the mainline. What I don't understand is why the 769 couldn't have switched to electric mode there and did it at Bolton instead?
The OHLE is only live on the down line (towards Wigan for a short distance) in case of a wrong route taken at Lostock junction by an electric train. Whilst OHLE is being put in place between Lostock junction and Wigan, non of it is electrified yet*.

* Disclaimer: it should be treated as live at all times.
 

Gricer99

Member
Joined
21 Jun 2020
Messages
328
Location
Hindley
The diversion sign in Highfield Road near the cottages is (yet as of last night, the bridge access is unhindered)
 

Attachments

  • 20240701_202932.jpg
    20240701_202932.jpg
    4.2 MB · Views: 73

380101

Member
Joined
18 Feb 2015
Messages
1,141
East Kilbride will be full electrification and the Ayr drama is almost over.

Ayr drama all over. Full electric service has resumed.

The "Brodie" 769s have been tested extensively on all the GSW routes (Stranraer excluded at the moment) currently operated by a class 156. Initial chat from people involved is that they outperform the 156s on all routes.
 

Richard Scott

Established Member
Associate Staff
International Transport
Railtours & Preservation
Joined
13 Dec 2018
Messages
4,584
Quite.
This is red tape England, not mainland Europe where OLE is more robust and actually used to save diesel emissions.
Without wanting to go off topic, plenty of flimsy OHLE in Europe and also examples of running diesel under wires for extended periods.
At least trains like this are allowing emissions reductions by making use of wires along some of their route. It may not be ideal but better than a diesel throughout.
 

thealexweb

Member
Joined
5 Jan 2014
Messages
1,106
Quite.
This is red tape England, not mainland Europe where OLE is more robust and actually used to save diesel emissions.

In the initial Porterbrook PR paperwork they claimed they would be able to change power on the move. We went from that to changing when stationary to then changing only in stations to changing certain only. Sad really.
 

AMD

Member
Joined
6 Dec 2017
Messages
774
Quite.
This is red tape England, not mainland Europe where OLE is more robust and actually used to save diesel emissions.
There is also the pragmatic, reality of operations - these majority of issues that have arisen with these units since introduction in 2021 have involved the power changeover. If there is a risk to operations it's better to be at a station where passengers can be detrained or managed if a problem arises.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,475
Location
Somerset
There is also the pragmatic, reality of operations - these majority of issues that have arisen with these units since introduction in 2021 have involved the power changeover. If there is a risk to operations it's better to be at a station where passengers can be detrained or managed if a problem arises.
And where, if necessary, other things can get round them.
 

plugwash

Established Member
Joined
29 May 2015
Messages
1,996
If platform 3 is blocked at bolton, can a southbond service run through platform 4? The track layout on tracksy suggests it's possible but I know sometimes things allowed by the track layout aren't allowed by the signalling.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,063
Location
St Albans
Ayr drama all over. Full electric service has resumed.

The "Brodie" 769s have been tested extensively on all the GSW routes (Stranraer excluded at the moment) currently operated by a class 156. Initial chat from people involved is that they outperform the 156s on all routes.
That's interesting considering the insistence of many here (before they were introduced) that their performance would fall below 150s/156s. They are also more comfortable and much quieter than the deafening thrash of the Sprinters. One question, - what sort of gradients are they likely to encounter on the GSW routes?
 

thealexweb

Member
Joined
5 Jan 2014
Messages
1,106
If platform 3 is blocked at bolton, can a southbond service run through platform 4? The track layout on tracksy suggests it's possible but I know sometimes things allowed by the track layout aren't allowed by the signalling.

Yes, all platforms at Bolton can be used bi-directionally. The situation you describe has occurred many times.
 

CAF397

Member
Joined
15 Sep 2010
Messages
1,095
Location
Lancashire
Yes, all platforms at Bolton can be used bi-directionally. The situation you describe has occurred many times.
Whilst every through platform has a signal at both ends, platform 3 is not fully bidirectional for Chorley-bound departures, and Platform 5 is not available for southbound through services, so not every platform is truly bi-directional.

In your reply, it is. Southbound departures from Lostock Jn can only use 3/4.

Northbound (non-Darwen) departures from Salford Crescent can only use 4/5.
 

380101

Member
Joined
18 Feb 2015
Messages
1,141
That's interesting considering the insistence of many here (before they were introduced) that their performance would fall below 150s/156s. They are also more comfortable and much quieter than the deafening thrash of the Sprinters. One question, - what sort of gradients are they likely to encounter on the GSW routes?

Leaving Barrhead going south it's a 3.5mile climb of between 1 in 67 - 70. This is the steepest part of the route to Kilmarnock. Brodie Engineering were contracted by Porterbrook to carry out reliability and performance improvements to the 769s, and it appears they have been successful.

769 002 is also now at Brodie Engineering in Kilmarnock - staff pictured in front of it on Armed Forces day last week - pic off Brodie Engineering LinkedIn page

Screenshot_20240703_083847_LinkedIn.jpg
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,063
Location
St Albans
Leaving Barrhead going south it's a 3.5mile climb of between 1 in 67 - 70. This is the steepest part of the route to Kilmarnock. Brodie Engineering were contracted by Porterbrook to carry out reliability and performance improvements to the 769s, and it appears they have been successful.

769 002 is also now at Brodie Engineering in Kilmarnock - staff pictured in front of it on Armed Forces day last week - pic off Brodie Engineering LinkedIn page

View attachment 161216
That's encouraging. The 769s, operating as diesel electrics aren't that short of torque so even if their progress is slow, they will usually get to the top, (the 319s were designed to cope with a standing start into a 1:27 in the Thameslink core) so the motors can obviously cope with the additional heat that a much more gentle 1:60+ creates. From posts here, I recall that there were issues particularly on the Welsh valley lines where a long drag up from Heath station could result in some engine overheating issues, so maybe Brodie addressed the prime mover cooling durability.
 

diligentdave

Member
Joined
20 Oct 2007
Messages
445
Leaving Barrhead going south it's a 3.5mile climb of between 1 in 67 - 70. This is the steepest part of the route to Kilmarnock. Brodie Engineering were contracted by Porterbrook to carry out reliability and performance improvements to the 769s, and it appears they have been successful.

769 002 is also now at Brodie Engineering in Kilmarnock - staff pictured in front of it on Armed Forces day last week - pic off Brodie Engineering LinkedIn page

View attachment 161216

Is that another Welsh Class 769 behind them, or is that something else?
That is just 2 vehicles of that unit. I was actually standing behind the camera (person) when that picture was taken.
 

Blindtraveler

Established Member
Joined
28 Feb 2011
Messages
10,543
So are they seriously going to trial these on Kilmarnock and perhaps Carlisle services
I think there'll be a huge success
 

david l

Member
Joined
27 Dec 2016
Messages
476
Location
Wigan
There is also the pragmatic, reality of operations - these majority of issues that have arisen with these units since introduction in 2021 have involved the power changeover. If there is a risk to operations it's better to be at a station where passengers can be detrained or managed if a problem arises.
Agree, but when the Lostock Jn-Wigan Station Junc is complete, where will the changeover for Man Ox Road-Southport services be (most booked 769 but many 150/6 used because of 769 unavailability), as from memory they didn't stop at Ince - even when Ince was open? Would it be Hindley, as leaving it at Bolton would make a nonsense of the electrification which then would only be of any use for WNW-Stalybridge services, or is there a master plan for 2025 onwards when the lease on the 769's was originally up (did hear a rumour now extended to 2027)??
 