Surely that's the West end of the station?
They look excellent to me.Apologies for poor quality of images.
Looking at 08:28, it seems like there will be minimal linespeed increases between Leeds and Church Fenton, with only Neville Hill to Cross Gates, as well as through Micklefield and Church Fenton seeing linespeed increases.Can't see this has been posted elsewhere. It is long but absolutely fantastic. It is another excellent PWI seminar. It is specifically on the Eastern half of the of the TP upgrade from Leeds to York. Well wroth a watch. I will screen shot various bits and brakl it up later on.
Supposedly this month (for services which use static power changeover at Manchester Victoria). Automatic power changeover at Stalybridge to be commissioned by November.Is the Miles Platting-Stalybridge section used by electric units yet or has it been decided to wait until December?
Yes, apologies, I was photographing from west end bridge looking towards east, but of course that was west end of station!!Surely that's the West end of the station?
Thanks!They look excellent to me.
Facinating video.Can't see this has been posted elsewhere. It is long but absolutely fantastic. It is another excellent PWI seminar. It is specifically on the Eastern half of the of the TP upgrade from Leeds to York. Well worth a watch. I will screen shot various bits and brake it up later on.
They did repeatedly say in fairness it is a major upgrade to the entire route. Removal of dangerous level crossings, electrification, increased capacity, and access for persons with reduced mobility. While I agree 2.5 minutes saved does not seem huge, I am happy to see the upgrade going ahead. Badly needed imho.Facinating video.
I'm puzzled with the mentioned time saving York to Leeds after all that expense of just 2.5 minutes.
2.5 minutes is more than 10% of the time a fast train takes between Leeds and Colton though, surely? I would have thought that's the most you can reasonably expect. Hopefully the service will also be more robust and actually make the faster timetable more often than it currently doesThey did repeatedly say in fairness it is a major upgrade to the entire route. Removal of dangerous level crossings, electrification, increased capacity, and access for persons with reduced mobility. While I agree 2.5 minutes saved does not seem huge, I am happy to see the upgrade going ahead. Badly needed imho.
Indeed. Instead of 75mph or 90/100mph DMUs operating on the 'stoppers' between Leeds and York, these can be operated by fast accelerating EMUs which will aid capacity as well.Journey time reductions grab the headlines, but much like HS2 the real benefit is capacity.
Northern are looking to replace the Sprinters in the next few years, although what the replacements will be is anyone's guess.Will the TOCs have the new units ready for when the wires are up on the TRU?
Journey time reductions grab the headlines, but much like HS2 the real benefit is capacity.
Exactly.Indeed. Instead of 75mph or 90/100mph DMUs operating on the 'stoppers' between Leeds and York, these can be operated by fast accelerating EMUs which will aid capacity as well.
They will definitely at least be electric, in short (lots more info in the dedicated thread) most Bi-mode, some EMU, maybe a few battery.Northern are looking to replace the Sprinters in the next few years, although what the replacements will be is anyone's guess.
My hope is that they'll be bi-mode at least - the Stadler FLIRTs seem to be an increasingly popular option, although the precise nature of the chosen option for Northern is probably outwith this thread.
Thanks for posting - definitely a great watch. Among other things the explanation of how TWA orders work was good to know.Can't see this has been posted elsewhere. It is long but absolutely fantastic. It is another excellent PWI seminar. It is specifically on the Eastern half of the of the TP upgrade from Leeds to York. Well worth a watch. I will screen shot various bits and brake it up later on.
Physically, I don't see why they couldn't.Technically could the 397s run on the cross Pennine route? Obviously once wires are all up (a very long way away).
Yeah I do think they are great for the WCML just could never imagine one at Newcastle...Physically, I don't see why they couldn't.
However I don't think they will, they'll probably stay on the WCML
Yes, I thought that section alone was great and I have rewatched it twice already. Very informative indeed.Among other things the explanation of how TWA orders work was good to know.
Seem pretty pointless having a couple of miles at Cross Gates at 100mph when it reverts back to 90mph to Church Fenton. Why not a 100mph all the way i wonderLooking at 08:28, it seems like there will be minimal linespeed increases between Leeds and Church Fenton, with only Neville Hill to Cross Gates, as well as through Micklefield and Church Fenton seeing linespeed increases.
A previous video on TRU alluded to speeds in excess of 100mph between Cross Gates and Church Fenton.
Passengers reminded to check before they travel ahead of weekday rail upgrades
Changes to weekday services between Huddersfield, Dewsbury and Leeds will be in place from Monday 24 June to Saturday 20 July as TRU complete major upgrades.
Weekend services remain unaffected but passengers are urged to plan ahead if travelling between Huddersfield and Leeds during the week.
The upgrades include track renewals, environmental and ground surveys, drainage, signal verifications and construction work.
Passengers will be kept on the move via diversionary routes and rail replacement bus services, and are encouraged to check nationalrail.co.uk to plan their journey.
The work is part of the Transpennine Route Upgrade, a programme of rail upgrades between Manchester, Huddersfield, Leeds and York.
Notes to Editors
TransPennine Express train services between Huddersfield and Leeds will be diverted and will not call at Dewsbury. The Saltburn to Manchester Airport service will start/terminate at Manchester Victoria instead of Manchester Airport.
Additionally, peak-time and evening local services between Manchester Piccadilly and Leeds will run between Manchester Piccadilly and Huddersfield only; and services between Manchester Piccadilly and Hull will only run between Leeds and Hull.
Direct rail replacement buses will run between Huddersfield, Dewsbury and Leeds, while all-stations rail replacement buses will run between Huddersfield and Leeds calling at Deighton, Mirfield, Ravensthorpe, Dewsbury, Batley, Morley and Cottingley.
Rail replacement buses will run between Manchester Airport and Huddersfield, calling at Stockport.
Northern train services between Wigan and Leeds will be diverted via Halifax and Bradford Interchange, and will not call at Brighouse, Mirfield, Ravensthorpe, Dewsbury, Batley or Morley.
Rail replacement buses will run between Halifax and Leeds, calling at Brighouse, Mirfield, Dewsbury, Batley and Morley.
Press release
![]()
Travel advice during Huddersfield to Leeds weekday rail upgrades
Changes to weekday services between Huddersfield, Dewsbury and Leeds will be in place from Monday 24 June to Saturday 20 July as Transpennine Route Upgrade completes major upgrades.www.networkrailmediacentre.co.uk
Yesterday and today three different 769 units seen at and between Manc Vic and Stalybridge and all on diesel including the beer move I did to Stalybridge.Supposedly this month (for services which use static power changeover at Manchester Victoria). Automatic power changeover at Stalybridge to be commissioned by November.