Pretty sure that's not true. The Victoria to Orpington will improve after being cut to every 30 mins but cuts on Dartford lines such as the Charing Cross fasts on the Sidcup and two tph on the Woolwich aren't confirmed. South eastern Metro has seen a fair few service reductions and are not anywhere near to restoring them all.Meanwhile, in the different world over on Southeastern, off-peak metro services are being restored to pre-Covid levels from December.
The South Western is a sorry run-down shadow of its former self.
SWR is pretty much now like SE Metro has been for years after numerous extensions and being second fiddle to long distance stuck with clapped out Networkers. SWR have been a shambles with 701s but at least new trains are coming en masse. Both leave much to be desired nowadays mind - as does Southern.

