70014IronDuke
Established Member
- Joined
- 13 Jun 2015
- Messages
- 4,067
A reversal would add an unnecessary time penalty and reduce the value in reopening the stations along the route. The majority of passengers would want to use the main station in Leicester for access to the city centre and for connections beyond Leicester.
It would indeed, but, if room for a single platform could be found at the reversal point, it would add another traffic origination/destination point. (I don't think an unconnected terminus would work though.)
If that is limited in terms of terminating trains, then revert to the original "Ivanhoe Line" plan, running through Leicester to Nottingham (or Newark).The restoration of services between Derby and Coalville is currently being studied under the Restoring Your Railways and Network North plans. Extension to Leicester is not part of the current proposals, due to the fact that you'd need to demolish quite a lot to build the chord and there's limited capacity at Leicester itself.
https://www.newcivilengineer.com/la...cester-could-cost-additional-271m-09-11-2023/
Or create a Leicster North station (around MP 101) and terminate the Burton trains in a bay there.
I've said before that the removal of the north - west chord at Knighton was one of the worst acts of official railway vandalism (in terms of infrastructure) that I can think of.
It's left the Coalville line in a similar situation to the March - Wisbech line. You can't reopen either because the cheap solutions (ie Burton to Leicester South, Wisbech to March shuttles) are not solutions, but every time you add on what you need to create a sensible solution the costs soar and nobody will give the go-ahead for such a grand scheme.

