TLDR:
After signalling delays during the day, Alnmouth station staff said southbound LNER train would depart from P2, but ignored my warnings of the train being routed as usual into P1 and as a result some people probably missed it. What should’ve happened differently?
Full:
This morning (Fri 29 Dec 2023) there were some signal issues around Wooden Gate Jn I believe. These have had some lasting effect but I’m led to believe that they’ve more or less cleared it now. Does anyone know exactly what went on? Anyway:
So we (myself and my family) turned up at Alnmouth station at 1450ish with multiple cancellations and delays on the boards, but crucially my 1500 London service was reporting on time and running. Whilst making our way to my zone we overheard the platform staff member tell people that our train and all others for the rest of the day will depart from Platform 2, the northbound platform. No platform alteration announcement, just a singular station staff member telling people about it - I believe the station may have been short staffed (unless its the new normal)? But shortly after, the LNER trains 1 and 0.5 hours earlier than ours came through Platform 1. Then, we noticed on Open Train Times that our train was routed through as usual into Platform 1 as well.
Soon after we enquired with the station staff member asking what was going on, with everyone (50+ passengers) on P2 and the train routed into P1. We tried to show her OTT but she dismissed any claim we had that the train could be on the usual P1, saying she was ”100% sure it was on P2”. Lo and behold, there it came rolling in on P1! She still dismissed it as ”the third delayed train” which was non existent but we knew it had to be our train based on headcodes and the very fact that the side of the train said ”1500 London: next stop Morpeth“ or something.
So we made our way over to P1, much to the confusion of the staff member and a fair few passengers who understandably were following the staff advice. But then after 30 seconds or so of the train in the platform she wasn’t quite sure anymore about the situation, so she spoke to an on-train staff member who confirmed it was the 1500 - shock horror! By this point we were on the train (only ones from Alnmouth so far) and the staff member went frantically to call everyone else to the train, meaning people going all the way from the north end of P2, over the footbridge at the south end of the platforms, and onto the train. The train sat in the platform for a reasonable 4 minutes or so before we went on our way, but of course there was luggage aplenty and some people used both lifts. I reckon most (if not all) people on foot made it, but I’m 95% sure that some lift users didn’t make the train.
So I’ve got a few questions. Should I have been more stubborn in getting my point across to the station staff member? Should I have tried to communicate to passengers nearby to alert them to the need to move across to P1? (On that one, I stuck to my general plan of let station staff do their job, but I don’t know anymore given that they were wrong and I could have helped someone make a train that they missed.) The staff member didn’t seem to be using any real form of communication outside of their ticket office with anyone else, how can this be right - Is this the staff member’s fault and the on-work-phone system exists, or does the tech need upgrading to meet a sensible standard?
After signalling delays during the day, Alnmouth station staff said southbound LNER train would depart from P2, but ignored my warnings of the train being routed as usual into P1 and as a result some people probably missed it. What should’ve happened differently?
Full:
This morning (Fri 29 Dec 2023) there were some signal issues around Wooden Gate Jn I believe. These have had some lasting effect but I’m led to believe that they’ve more or less cleared it now. Does anyone know exactly what went on? Anyway:
So we (myself and my family) turned up at Alnmouth station at 1450ish with multiple cancellations and delays on the boards, but crucially my 1500 London service was reporting on time and running. Whilst making our way to my zone we overheard the platform staff member tell people that our train and all others for the rest of the day will depart from Platform 2, the northbound platform. No platform alteration announcement, just a singular station staff member telling people about it - I believe the station may have been short staffed (unless its the new normal)? But shortly after, the LNER trains 1 and 0.5 hours earlier than ours came through Platform 1. Then, we noticed on Open Train Times that our train was routed through as usual into Platform 1 as well.
Soon after we enquired with the station staff member asking what was going on, with everyone (50+ passengers) on P2 and the train routed into P1. We tried to show her OTT but she dismissed any claim we had that the train could be on the usual P1, saying she was ”100% sure it was on P2”. Lo and behold, there it came rolling in on P1! She still dismissed it as ”the third delayed train” which was non existent but we knew it had to be our train based on headcodes and the very fact that the side of the train said ”1500 London: next stop Morpeth“ or something.
So we made our way over to P1, much to the confusion of the staff member and a fair few passengers who understandably were following the staff advice. But then after 30 seconds or so of the train in the platform she wasn’t quite sure anymore about the situation, so she spoke to an on-train staff member who confirmed it was the 1500 - shock horror! By this point we were on the train (only ones from Alnmouth so far) and the staff member went frantically to call everyone else to the train, meaning people going all the way from the north end of P2, over the footbridge at the south end of the platforms, and onto the train. The train sat in the platform for a reasonable 4 minutes or so before we went on our way, but of course there was luggage aplenty and some people used both lifts. I reckon most (if not all) people on foot made it, but I’m 95% sure that some lift users didn’t make the train.
So I’ve got a few questions. Should I have been more stubborn in getting my point across to the station staff member? Should I have tried to communicate to passengers nearby to alert them to the need to move across to P1? (On that one, I stuck to my general plan of let station staff do their job, but I don’t know anymore given that they were wrong and I could have helped someone make a train that they missed.) The staff member didn’t seem to be using any real form of communication outside of their ticket office with anyone else, how can this be right - Is this the staff member’s fault and the on-work-phone system exists, or does the tech need upgrading to meet a sensible standard?