• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Northern Class 331 East:West unit swap

Status
Not open for further replies.

Harvey B

Established Member
Joined
11 Mar 2019
Messages
1,241
Not until the triangle commences 6 car working to release 333’s. Training for Donny crews should start in advance of this.

This of course is due to the delay in platform lengthening on the Airedale/Wharfedale lines. It should all be in place now but circumstances have delayed the work.
And is that at least another year away before 6 car workings on the triangle can start?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Neptune

Established Member
Joined
29 May 2018
Messages
2,626
Location
Yorkshire
And is that at least another year away before 6 car workings on the triangle can start?
Projected to be, that’s all I can say. It depends how long it takes to build and certify the platform extensions and then getting the remaining few 3 car 331’s form Allerton plus the associated training with 333’s working the Donny line.
 

jonesy3001

Established Member
Joined
13 Jul 2009
Messages
3,317
Location
Otley, West Yorkshire
Was up in Menston on Monday and platform 1 was coming on nicely, don't know if they're doing platform 2 yet, also noticed JCBs on the old guiseley platforms as well.
Also 331006 at menston.
 

Attachments

  • Menston station platform extension .jpg
    Menston station platform extension .jpg
    2.5 MB · Views: 132
  • Menston platform extension .jpg
    Menston platform extension .jpg
    2.3 MB · Views: 134
  • 331106.jpg
    331106.jpg
    2.2 MB · Views: 134
Last edited:

superkev

Established Member
Joined
1 Mar 2015
Messages
2,865
Location
west yorkshire
Was up in Menston on Monday and platform 1 was coming on nicely, don't know if they're doing platform 2 yet, also noticed JCBs on the old guiseley platforms as well.
I've lost track of which platforms need to be extended and when there supposed to be finished..
Certainly at least 1 of the Shipley platforms cannot be extended because of the bridge so selective door opening will be needed for 6 cars.
Why does eveything on the railways take so long. Prob paper shuffling.
K
 

jonesy3001

Established Member
Joined
13 Jul 2009
Messages
3,317
Location
Otley, West Yorkshire
I've lost track of which platforms need to be extended and when there supposed to be finished..
Certainly at least 1 of the Shipley platforms cannot be extended because of the bridge so selective door opening will be needed for 6 cars.
Why does eveything on the railways take so long. Prob paper shuffling.
K
Think Bingley was getting done as well, not much of a gap though up to the tunnel.
 

Harvey B

Established Member
Joined
11 Mar 2019
Messages
1,241
Projected to be, that’s all I can say. It depends how long it takes to build and certify the platform extensions and then getting the remaining few 3 car 331’s form Allerton plus the associated training with 333’s working the Donny line.
So does that mean we'll end up with all 31 of the 3 car 331s? (or at least a good majority of them)
 
Last edited:

Neptune

Established Member
Joined
29 May 2018
Messages
2,626
Location
Yorkshire
So does that mean we'll end up with all 31 of the 3 car 331s? (or at least a good majority of them)
No it won’t be that many more. I can’t remember the exact figures but I think it’s about 15 in total (ie 6 more than Dec 23). Please don’t quote me on the exact number though as it’s a while since I heard how many it would be.

There’ll still be 333’s working around the triangle as only 2 are needed for the Donny service.
 

reecestrains

Member
Joined
22 Aug 2023
Messages
384
Location
Leeds, West Yorkshire
Yep, it's on the way now.

Do we know which unit is going over this afternoon yet or not? I know one 4 car unit is currently sitting at Broughton Road siding.
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,886
Do we know which unit is going over this afternoon yet or not? I know one 4 car unit is currently sitting at Broughton Road siding.
107 is currently at Skipton so if anything goes it will be that set.
 

Harvey B

Established Member
Joined
11 Mar 2019
Messages
1,241
Plot twist. A 333 gets sent to Allerton by mistake. :lol:
I'd laugh if that were the case. They run on an outdated PIS system that only has The Triangle Routes programmed. As well as Leeds to Doncaster (albeit rarely used)
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,883
Location
Cambridge
I'd laugh if that were the case. They run on an outdated PIS system that only has The Triangle Routes programmed. As well as Leeds to Doncaster (albeit rarely used)
I think the other consequential problems would be far greater than them not having the right announcements loaded!
 

Neptune

Established Member
Joined
29 May 2018
Messages
2,626
Location
Yorkshire
I'd laugh if that were the case. They run on an outdated PIS system that only has The Triangle Routes programmed. As well as Leeds to Doncaster (albeit rarely used)
The PIS would be the least of their problems. They wouldn’t be able to run anywhere in the North West. Not route cleared and no crews sign them.
 

reecestrains

Member
Joined
22 Aug 2023
Messages
384
Location
Leeds, West Yorkshire
The loco in Skipton has just pulled out without 107

== Doublepost prevention - post automatically merged: ==

It's gone over to platform 3 to grab 105 now.
 

superkev

Established Member
Joined
1 Mar 2015
Messages
2,865
Location
west yorkshire
It's 105.

107 didn't go, looks like it's having problems.
Thanks
Anyone confirm my following list is correct as 7th Dec
3 car. I have 331 001-004, 006, 008, 009 now at NL with just 005 and 007 to come to make the 9 expected
4 car. I have 331 102-105, 109-111 now at AN with 101, 106-108, 112 to come to make all 12 of the 4 cars.
Thanks
K
 

jonesy3001

Established Member
Joined
13 Jul 2009
Messages
3,317
Location
Otley, West Yorkshire
It's 105.

107 didn't go, looks like it's having problems.
Coupler problems maybe, why don't they put in the siding outside the station and see if the other end will work.

== Doublepost prevention - post automatically merged: ==

Thanks
Anyone confirm my following list is correct as 7th Dec
3 car. I have 331 001-004, 006, 008, 009 now at NL with just 005 and 007 to come to make the 9 expected
4 car. I have 331 102-105, 109-111 now at AN with 101, 106-108, 112 to come to make all 12 of the 4 cars.
Thanks
Can see the 4 cars moving in doubles tomorrow and Saturday then.
 
Last edited:

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,362
Location
Yorkshire
Leeds to Wakefield and Doncaster does have LNER though, Skipton and Ilkley do not. Doncaster trains only see mainly local traffic to Fitzwilliam and the others.
If you're at Westgate and heading to Doncaster or Leeds, you just get on the first train that shows up as the fasts have no opportunity to overtake slows on that stretch. If it happens to be an LNER then it'll be a bit faster without all the stops, but letting a stopper go won't get you to your destination any quicker.
 
Status
Not open for further replies.

Top