Today, the intermediate stations between Reading and Didcot Parkway (at least those with Main platforms) were graced by a few additional calls from various express services which normally wouldn’t touch them with a barge pole. There were a couple from Paddington to Cheltenham Spa, and from Hereford/Worcester to Paddington, as well as calls from what are normally the Oxford fasts in both directions.
This was, of course, because of unusually severe disruption resulting from damage to the power lines near Maidenhead (which, I presume, meant the 387s that would normally be used were trapped in the wrong places).
The additional calls only started appearing after several services in a row were cancelled. I was wondering if there was some kind of criteria for how many services have to be cancelled before additional calls are considered, or whether it’s more down to the personal whims of whoever makes the decisions about this sort of thing. Would I be right in thinking that additional calls are more likely to be added to a service if (as in today’s example) it’s operated by the same company as the cancelled services?
This was, of course, because of unusually severe disruption resulting from damage to the power lines near Maidenhead (which, I presume, meant the 387s that would normally be used were trapped in the wrong places).
The additional calls only started appearing after several services in a row were cancelled. I was wondering if there was some kind of criteria for how many services have to be cancelled before additional calls are considered, or whether it’s more down to the personal whims of whoever makes the decisions about this sort of thing. Would I be right in thinking that additional calls are more likely to be added to a service if (as in today’s example) it’s operated by the same company as the cancelled services?