That would be an issue for FGW/Northern? The 142s in the SW are due back North next month
That would be an issue for FGW/Northern? The 142s in the SW are due back North next month
Or just tell London Midland to get over it and send the stock as required, the're screwing up 3 other TOCs by messing around and holding onto their rolling stock. If the DfT wants to micro manage as much as it does, let it.
While the're at it, if we're ordering more 350/1 or 350/3 for Lancs - Scotland, tac some order on the end so LM can release it's remaining 321s, oh, and I'd also be forcing LM to get rid of all of it's 150s, I've seen this happen many times now, with the 350/2 and now the 172, order enough to fully replace your fleet then hold onto some of the old ones, why not just order more, or give you what you have, all it does when you have a microfleet, like they will with the 150s if the stock cascade goes ahead as is scheduled with LM holding onto some 150s, then it will result in them having two microfleets, the 150s and the 321s. Is kind of irritating when they don't order enough, or do order enough then change the goalposts, why don't they operate the options they dowbtlessly have for additional units. Or just have some more 350 or 390s, for example for the Northampton fasts that run on the fast lines and restirct pathing out of Euston so much, or some more 390s for the Birmingham - Scotland and Manchester - Scotland runs, aswell as the Euston - Northampton fasts...
Totally agree with you on that one, those 7 321's left behind would be good for either Northern, FCC or NXEA to boost capacity. I agree with you about the 150 microfleet thing, but I think at least 3 sets would have to be kept behind anyway, because of the Marston Vale line only being able to take two 20m coaches. Personally if the money was there I would order an extra 13 172 vehicles, one 3 car set and 5 2 car sets to displace all 150's apart from three 2 car sets for the Marston Vale line. This means that the five two car sets could also release the 153's to other operators. I know with this you lose the flexibility of being able to use just one car or adding only one car onto other services, but on a like-for-like basis, LM aren't losing any vehicles, and in fact if they kept 3 150's behind they'd be gaining six vehicles. I know that that means there'd still be a micro-fleet but it would at least be with good reason. Oh and I'd order 7 350/2's while I'm at it...Or just tell London Midland to get over it and send the stock as required, the're screwing up 3 other TOCs by messing around and holding onto their rolling stock. If the DfT wants to micro manage as much as it does, let it.
While the're at it, if we're ordering more 350/1 or 350/3 for Lancs - Scotland, tac some order on the end so LM can release it's remaining 321s, oh, and I'd also be forcing LM to get rid of all of it's 150s, I've seen this happen many times now, with the 350/2 and now the 172, order enough to fully replace your fleet then hold onto some of the old ones, why not just order more, or give you what you have, all it does when you have a microfleet, like they will with the 150s if the stock cascade goes ahead as is scheduled with LM holding onto some 150s, then it will result in them having two microfleets, the 150s and the 321s. Is kind of irritating when they don't order enough, or do order enough then change the goalposts, why don't they operate the options they dowbtlessly have for additional units. Or just have some more 350 or 390s, for example for the Northampton fasts that run on the fast lines and restirct pathing out of Euston so much, or some more 390s for the Birmingham - Scotland and Manchester - Scotland runs, aswell as the Euston - Northampton fasts...
I agree with you. The politics involved of ordering a "new for old", then deciding that you want to keep some of the old trains as well (when other TOCs need that capacity) bugs me.
Same deal with LM getting two/three coach 170s then adding 153s to them all day long - would have been much better if Central Trains had ordered more 170 centre cars in the first place.
We are going to need more 172s in future years (we will never electrify fast enough to eliminate all Pacers, they are going to fall apart before all rural lines are electrified), so why not get LM to order more of these now and spare more 150/153/170s?
The size of train orders that gets past DfT approval seems to be based on some contingency for passenger demand to decrease in the near future, with a just wait and see what happens period following before an option to order additional carriages, which then rarely happens because by that point the relevant production line has been shut down, the on board train software has changed, or the DfT decree that funding is no longer available for any train lengthening and that the TOC affected will simply have to make do. All this despite the fact that demand for rail travel has been rising for the last decade and is continuing to do so! I cant comprehend the DfTs logic in this at all.
Id love to see less micromanagement of train orders by the DfT, and more positive entrepreneurship from the ROSCOs and the train builders: For instance, in the case of the Turbostar fleets, when the respective orders for different sub classes were made, Bombardier could have rounded up the number of trains built for each sub class to the nearest five or ten, and make the additional trains available to whichever TOC bid for them from the leasing company, as was the case with 170397/8.
For instance:
170101 to 170117 extended to 170120, making three additional trains.
170201 to 170208 extended to 170210 = two additional trains.
170301 to 170308 (There wasnt originally a 170309) extened to 170310 = Two additional trains.
Having even a handful of additional trains built through such a process would go some way to alleviating the current rolling stock shortage.
London Midland should certainly be receiving enough 172s to replace all of its 150s now. Just what is the benefit of having a possible future order for twenty six further carriages? If the option is there, it should be part of the main train order, no questions asked!
London Midland should certainly be receiving enough 172s to replace all of its 150s now. J
To clarify the 172 order is large enough to replace all the 150s. However, LM want to keep 150s as well due to rising passenger numbers
not on the ones ive been on, 2+2 all boothed seating, with the bus seats outside the toilet, chapmans all round :/
although as long as they have the bus seat outside the toilet im sorted!
Same deal with LM getting two/three coach 170s then adding 153s to them all day long - would have been much better if Central Trains had ordered more 170 centre cars in the first place.
Thats true. I should have phrased that along the lines of London Midland should be receiving enough 172s to replace all of its 150s now, in light of rising passenger numbers. Building a new train fleet with the same number of carriages as the fleet it is replacing when passenger numbers are continuing to rise is never going to work.
CT didn't order 170s for the routes that LM are now using them on. Many of the routes that LM 170s are now used on should be operated by the Sprinters which adding a 153 on to in the morning/evening peak would work well.
CT used the 170s in 2,3,4 and 5 car formation on CityLink services. Corridor connectors would have been useful but then that's the case for all 170s as well as 175s and 185s.
--- old post above --- --- new post below ---
Yes but with the exception of the 350/1s most orders have been for a similar number of carriages that they are replacing with options for additional orders. The problem is that the additional options don't get implemented e.g. the TPE 185s.
does anybody think that LM would be able to cover, say 1 x 3 carriage 150 diagram, 2 diagrams for two car 150s working singly and 1 x 2 carriage 150+153 for the Chase line, as well as managing the current diagrams for the Snow Hill lines?
As I'm sure you know, it's all about the standardisation of train fleets within TOCs that the DfT favours at the moment, though youre right in saying that 153s work best with other units fitted with gangway connections, which London Midland are somewhat short on in the diesel fleet.The point I was trying to make is that 153s are a good option to strengthen 150/2s, 156s and 158s but a poorer option to strengthen 170s.
Why the LM fleet included 153s and not 156s or/and 158s is anyone's guess.
Or maybe the DfT could just force them to get rid of their old trains and hand them over to Northern, or if they continue to throw their toys out of the pram, take all the shiney new 172s off them and send them pacers from northern in place instead.
The follow on options that are available at the time of the train order are rarely, if ever, implemented at a later date when it turns out, surprise surprise, that the number of passengers using the service is continuing to increase, as has been happening for the last decade, and yet exactly the same number of carriages as was the case with the old train fleet are in use. New train orders should be seen as an opportunity to increase the number of carriages in the train fleet from the very beginning, not as a potential option for later when it is too late!
I sometimes wonder whether the "follow on" options are only there to beef up the size of orders (make them sound more significant than they really are).
Or it could be to try and agree a better price with the manufacturer. An order of 150 carriages may be charged at a higher rate per carriage than 150 plus up to 75 more.
True. If it helps the unit cost then I guess its a bargaining chip. But manufacturers must be wise to the fact that these orders are rarely completed.
Heh, if that's what they were bought for specifically then they never made good on the diagramming!CT didn't order 170s for the routes that LM are now using them on. Many of the routes that LM 170s are now used on should be operated by the Sprinters which adding a 153 on to in the morning/evening peak would work well.
CT used the 170s in 2,3,4 and 5 car formation on CityLink services. Corridor connectors would have been useful but then that's the case for all 170s as well as 175s and 185s.
Hence all the delays to the 172 line I guess.Wikipedia seems to imply that Overground eventually maxed out their options on Capitalstar...
Hence all the delays to the 172 line I guess.
That and half of their suppliers going bankrupt...?

That and half of their suppliers going bankrupt...?