Hindsight much? In the time 1T08 waited to crossover to return north the weather cleared substantially. 1T08 had already traversed that section of line in the southbound direction with nothing amiss and a train had travelled north through the incident site prior to the derailment with nothing amiss. It’s a cruel situation but as a Driver myself, prior to the Stonehaven incident I am sure that I also would have felt comfortable to reach linespeed.
If I were in that exact scenario now, post Stonehaven, there would definitely be a major red flag that would influence my decision making. This is knowledge that no one on the day was privy to.
This is a very good point, well made.
To my limited knowledge, we had not seen any issues on that section of line prior to this incident. It was an odd situation, and the rain that day was like something out of a movie, im not sure iv ever seen the like in Aberdeenshire.
AIUI Sec 76 only states that a guilty plea is to be entered. As above, its the classic accountability/responsibilty situation. Due to the loss of life, its a challenge to see other paths. The buck ultimately stops with someone, harsh though that may be, in this instance. Consider any other business where life is lost and appraise similar outcomes.
The silver lining is that contracted work will be held to account more robustly going forwards, and NR are evidently doing all of the right things to ensure this doesnt happen again, here, or elsewhere.