anthony263
Established Member
They be told to f off by me if they tried that or better yet id be handbrake on bus in neutral then out the cab and yelling them.to bloody park itThey are prominent all up the valley, wannabe bus coordinators. They are on every station up the Rhonnda and spend their day winding up bus drivers telling them to stop 10 metres forward or back even if that means parking on a pedestrian crossing or park closer to a certain point so that they don't have to walk as far. No care for where the actual bus stop is.
TFW doesn't want proper bus coordinators who know bus times and are trained to sort buses, they ask for Sword instead.
== Doublepost prevention - post automatically merged: ==
Its gone up very quickly like ypu said oy a fortnight or so ago I saw the wires up on the line as it passed behind pontypridd bus station but nothing at Abercynon then last Sunday I pull up at the bus stop by the Abercynon shops looking directly at the station area and seeing all the wiring upInteresting; as of 1 July when I rode both lines on an Explorer ticket there were no wires up at all north of Pontypridd. The masts were complete at Abercynon but on the Merthyr branch many were no more than the basic pole, particularly on the single line sections. Work was more advanced on the Aberdare line overall though even there one pole was lying flat on the ground by the footbridge (which is no doubt the problem!) at the Up end of Penrhiwceiber station and the masts had not yet reached Aberdare itself. Energisation is due on 7th October but particularly after what happened between Llandaf and Radyr a few months back I would think they would have wanted to leave the wiring as late as possible because of the likelihood of theft.
