Having had a look at various schematic maps of the Devon Metro concept, it has Marsh Barton on the line between Exeter and Newton Abbott.
When having a quick look at the Wikipedia page (see https://en.wikipedia.org/wiki/Disused_railway_stations_on_the_Exeter_to_Plymouth_Line#Exminster), the last paragraph in the Axminster section states that "In an update in April 2020, officers of Devon County Council said that a decision had been made to prioritise Marsh Barton over a possible reopening of this station. Lack of track capacity meant that it was 'almost impossible' to open both."
Does this now mean that Exminster is very unlikely to reopen at all being as Marsh Barton is nearing completion?
As a side note, I have had a go at seeing if the local Exmouth - Paignton calling all stations would fit involving an overtake at Dawlish Warren by the Paddington - Plymouth/Penzance via Westbury Avoiding Line, and the north of Birmingham - Plymouth/Penzance XC exactly 30 minutes apart. With a reopened Exminster and assuming 75mph max, it only just about fits. Although this is on paper (or spreadsheet), it would not be very robust at all in everyday practice.
As the linespeed between St Thomas and Starcross is 100mph over that five mile stretch, assuming 100mph is 3 minutes and 90 mph is 3 min 20 sec to cover non stop. Again, it does not trim a lot off the run time St Davids - Dawlish Warren, and I am of the view of not to bother reopening Exminster at all.
When having a quick look at the Wikipedia page (see https://en.wikipedia.org/wiki/Disused_railway_stations_on_the_Exeter_to_Plymouth_Line#Exminster), the last paragraph in the Axminster section states that "In an update in April 2020, officers of Devon County Council said that a decision had been made to prioritise Marsh Barton over a possible reopening of this station. Lack of track capacity meant that it was 'almost impossible' to open both."
Does this now mean that Exminster is very unlikely to reopen at all being as Marsh Barton is nearing completion?
As a side note, I have had a go at seeing if the local Exmouth - Paignton calling all stations would fit involving an overtake at Dawlish Warren by the Paddington - Plymouth/Penzance via Westbury Avoiding Line, and the north of Birmingham - Plymouth/Penzance XC exactly 30 minutes apart. With a reopened Exminster and assuming 75mph max, it only just about fits. Although this is on paper (or spreadsheet), it would not be very robust at all in everyday practice.
As the linespeed between St Thomas and Starcross is 100mph over that five mile stretch, assuming 100mph is 3 minutes and 90 mph is 3 min 20 sec to cover non stop. Again, it does not trim a lot off the run time St Davids - Dawlish Warren, and I am of the view of not to bother reopening Exminster at all.