East Kilbride/Barrhead electrification updates

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

nlogax

Established Member
Joined
29 May 2011
Messages
6,035
Location
Mostly Glasgow-ish. Mostly.
So does the signalling upgrades mean lugton signal box is to close or is it remaining open for the foreseeable future along with the semaphore signals?

I recently read somewhere that the Lugton box is scheduled to close this year so I wonder if that will happen during this blockade. Barrhead's box went some months before this summer's work started.
 

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
Is Section C info now out of date?

https://signalbox.org/section-c/alterations-2023/

Are actual dates available?
The information there has been hopelessly unreliable ever since a strategy for the migration of signalling control to ROCs was produced about ten years ago, which the compiler of those pages decided to treat as gospel rather than a wish-list. Until then, they had only included projects that were funded and stood a good chance of coming to fruition.
 

Southsider

Member
Joined
10 Aug 2015
Messages
937
Had a look over the parapets of Church Road bridge when out for a walk this evening. No sign of piles in either direction.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Had a look over the parapets of Church Road bridge when out for a walk this evening. No sign of piles in either direction.
For the benefit of non-locals could you clarify which Church Road? I can find several in the general vicinity of the Barrhead and EK lines but haven't found one crossing the line.

Edit: I've now found a Church Road a short distance towards EK from Giffnock station. (For some reason, the Google Streetview car seems to have avoided going near the bridge!)
 
Last edited:

Southsider

Member
Joined
10 Aug 2015
Messages
937
For the benefit of non-locals could you clarify which Church Road? I can find several in the general vicinity of the Barrhead and EK lines but haven't found one crossing the line.

Edit: I've now found a Church Road a short distance towards EK from Giffnock station. (For some reason, the Google Streetview car seems to have avoided going near the bridge!)
That’s the one
 

380101

Member
Joined
18 Feb 2015
Messages
1,141
Had a look over the parapets of Church Road bridge when out for a walk this evening. No sign of piles in either direction.

Piles stop a short distance beyond Thornliebank station towards Giffnock on the down line only, so far. Think I've counted 3 or 4, but hard to see due to the explosion of weeds.
 

OB23Gone

Member
Joined
22 Aug 2022
Messages
186
Location
Glasgow
Had a look over the parapets of Church Road bridge when out for a walk this evening. No sign of piles in either direction.
Went out today to have a look from Church Road bridge and as you say No Piles in sight. Couldn't get any closer as didn't have much time and couldn't find a nearby parking place. Maybe have a closer look from the station at a similar level to that as from the train. Or maybe I might just go to Specsavers.

== Doublepost prevention - post automatically merged: ==

As of this morning catenery and contact wires are now in place on the westbound track over Levern Water Viaduct and towards Barrhead station.
As of this morning catenery and contact wires are now in place on the westbound track over Levern Water Viaduct and towards Barrhead station.
Both lines have been installed as far as the turning point at the end of Commercial Road as of this afternoon. Masts and portals are all in to the start of platform 1. Presumably the next wire run will be from Commercial Rd to there. Only through the station and as far as the end of the run of beyond to go. Lastly the bits through Busby Junction from Shaw's Bowling Club and some towards Kennishead. Then almost all good to go excluding adjustments etc.. Someone will probably explain what that entails, hopefully
 
Last edited:

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
Driving between Barrhead and Lugton this morning there were two parts of the line where work crews were active.
Network Rail Scotland have posted a video. They're replacing the lamp units and upgrading the area around the bases to improve reliability and maintenance access. They will then move to Kilmarnock. So clearly the semaphores will be there for some time.
 

Southsider

Member
Joined
10 Aug 2015
Messages
937
I’ve run parallel to and crossed the line at various places on my travels over the last few days. I could have missed something but it looks like wires are up on both lines all the way from Muirhouse to Barrhead with just the final stretch into Barrhead station to complete. Does this tally with other people’s observations?
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
I’ve run parallel to and crossed the line at various places on my travels over the last few days. I could have missed something but it looks like wires are up on both lines all the way from Muirhouse to Barrhead with just the final stretch into Barrhead station to complete. Does this tally with other people’s observations?
So perhaps it could be live by 6 Aug as suggested at the end of #1437.
 
Joined
14 Mar 2021
Messages
211
Location
Glasgow
I’ve run parallel to and crossed the line at various places on my travels over the last few days. I could have missed something but it looks like wires are up on both lines all the way from Muirhouse to Barrhead with just the final stretch into Barrhead station to complete. Does this tally with other people’s observations?
The wiring run on the Down Barrhead from the Pollokshaws Bowling Club through Busby junction has been done. However, there are still two drums beside the site of the demolished Cartcraigs bridge with no wires attached. So, more work is to be done at Busby junction.
 

Attachments

  • Busby junction 1.jpg
    Busby junction 1.jpg
    1.6 MB · Views: 99
  • Busby junction 2.jpg
    Busby junction 2.jpg
    1.5 MB · Views: 100

OB23Gone

Member
Joined
22 Aug 2022
Messages
186
Location
Glasgow
I’ve run parallel to and crossed the line at various places on my travels over the last few days. I could have missed something but it looks like wires are up on both lines all the way from Muirhouse to Barrhead with just the final stretch into Barrhead station to complete. Does this tally with other people’s observations?
Only bits remaining to be done are as you say are from the end of Commercial Rd. Barrhead to the end of the planned electrification. This approximately 1.24 km long. As of yesterday 24th all but the 3 mast pillars on the station side lack masts. Viewing platform 3 side is not possible. Levernwater Viaduct lacks 1 set of masts and a portal although the wires have been installed. The wires on the Barrhead Bound section between Busby Jn. and the Kennishead High Flats out to Pollokshaws Bowling Club wetre run in on Sunday morning as there was no sign of them on Saturday. Think there is some finishing of works around Busby Jn. though. A couple of weeks back A Railway Neighbor leaflet was delivered saying "Electrified Lines Are Always on SO ALWAYS STAY OFF"

== Doublepost prevention - post automatically merged: ==

Only bits remaining to be done are as you say are from the end of Commercial Rd. Barrhead to the end of the planned electrification. This approximately 1.24 km long. As of yesterday 24th all but the 3 mast pillars on the station side lack masts. Viewing platform 3 side is not possible. Levernwater Viaduct lacks 1 set of masts and a portal although the wires have been installed. The wires on the Barrhead Bound section between Busby Jn. and the Kennishead High Flats out to Pollokshaws Bowling Club wetre run in on Sunday morning as there was no sign of them on Saturday. Think there is some finishing of works around Busby Jn. though. A couple of weeks back A Railway Neighbor leaflet was delivered saying "Electrified Lines Are Always on SO ALWAYS STAY OFF"
Other 2 Files
 

Attachments

  • 1.jpg
    1.jpg
    347.2 KB · Views: 102
  • 2.jpg
    2.jpg
    489.5 KB · Views: 95
  • 3.jpg
    3.jpg
    436.5 KB · Views: 90
  • 4.jpg
    4.jpg
    442.4 KB · Views: 90
  • 5.jpg
    5.jpg
    366.1 KB · Views: 94
  • 6.jpg
    6.jpg
    350 KB · Views: 108
  • 7.jpg
    7.jpg
    340.9 KB · Views: 110
  • 8.jpg
    8.jpg
    386.5 KB · Views: 114
  • 9.jpg
    9.jpg
    316.5 KB · Views: 102
  • 10.jpg
    10.jpg
    432 KB · Views: 100
  • 11.jpg
    11.jpg
    514.2 KB · Views: 104

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Levernwater Viaduct lacks 1 set of masts and a portal although the wires have been installed.
I didn't know until now that it was ever done to put up the wires with not all masts in place. That's an impressive span over the viaduct.
 

OB23Gone

Member
Joined
22 Aug 2022
Messages
186
Location
Glasgow
At Barrhead station, the temporary road traffic signals have been removed (they were there when a low loader was parked outside the station on Paisley Road).

There is a new foundation on the Carlibar Road (main entrance) side of the station.

The short term parking bay that was used for the Rail Replacement Bus is now fenced in and in use as a temporary compound. Apparently, the bus contractor was not informed of this decision and so they need to change their pick up and drop off point, otherwise their coaches obstruct the road.


View attachment 138499View attachment 138501
Changes at Barrhead Station. Masts at front of station in, ramp taking shape, track renewal work for platform 3. There were 2 Engineers trains in today Mon 24th July lifting out the old track & removing the spent ballast etc
 

Attachments

  • 1.jpg
    1.jpg
    565.8 KB · Views: 198
  • 2.jpg
    2.jpg
    637 KB · Views: 191
  • 3.jpg
    3.jpg
    699 KB · Views: 189
  • 4.jpg
    4.jpg
    538.9 KB · Views: 171
  • 5.jpg
    5.jpg
    500.7 KB · Views: 174

WesternBiker

Member
Joined
26 Aug 2020
Messages
692
Location
South Cambridgeshire
Changes at Barrhead Station. Masts at front of station in, ramp taking shape, track renewal work for platform 3. There were 2 Engineers trains in today Mon 24th July lifting out the old track & removing the spent ballast etc
Great photographs...and good to see progress. It looks as though they could do with a weedkiller train through the main running lines, too...
 

nlogax

Established Member
Joined
29 May 2011
Messages
6,035
Location
Mostly Glasgow-ish. Mostly.
Great photographs...and good to see progress. It looks as though they could do with a weedkiller train through the main running lines, too...

Indeed, really terrific shots. Thank you @OB23Gone.

I've never seen OLE mounted on tall brick columns before, are there other examples like this? As for the weeds it looks like they've only sprung up in the last three - four weeks since the closure!
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,334
Location
Nottingham
I've never seen OLE mounted on tall brick columns before
I can only assume that is brick facing on a metal column. Or the bolts go all the way down to the ground. A purely brick tower with mortared joints wouldn't provide the tensile forces to resist a sideways pressure on the OHLE.
 

sannox

Member
Joined
1 Mar 2016
Messages
650
I can only assume that is brick facing on a metal column. Or the bolts go all the way down to the ground. A purely brick tower with mortared joints wouldn't provide the tensile forces to resist a sideways pressure on the OHLE.
It looks like facing panels.

Not particularly sympathetic looking.
 

OB23Gone

Member
Joined
22 Aug 2022
Messages
186
Location
Glasgow
I can only assume that is brick facing on a metal column. Or the bolts go all the way down to the ground. A purely brick tower with mortared joints wouldn't provide the tensile forces to resist a sideways pressure on the OHLE.
Frightening looking in real life actually. Didn't notice what the actual initial construction was like. Only assumption is that standard mast piles were driven in initially then a concrete pouring around these and then facing brick. Yes not very sympathetic. I would imagine that the same type of brackets as on the Levernwater Viaduct, some of the rods had to go in as far as 4 mtrs ,couldn't be installed here as they would end up penetrating into the station Hall/offices. When you actually see the gap between the column and the retaining wall the cantilever weight of the cantilever plus the weight of the return cable, lvce cable etc would be enough to tilt it in towards the station. No doubt all the safety calculations have been done and ratified
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,507
Location
Preston Lancs
I've never seen OLE mounted on tall brick columns before, are there other examples like this? As for the weeds it looks like they've only sprung up in the last three - four weeks since the closure!

Yes me neither. Looks really weird and yet fascinating.

I can only assume that is brick facing on a metal column. Or the bolts go all the way down to the ground. A purely brick tower with mortared joints wouldn't provide the tensile forces to resist a sideways pressure on the OHLE.
exactly.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Only bits remaining to be done are as you say are from the end of Commercial Rd. Barrhead to the end of the planned electrification. This approximately 1.24 km long.
Does that mean the wires will extend onto the start of the single track section south of the station?
 