HSTs, HSTs and HSTs I believe. Unless 91s do as well, but they haven't got long to go either.
I can't think of any ex-BR DMUs or EMUs that have a fibreglass cab (can you?) and all the newer stuff has a metal frame under any fairing.
The 91s have a steel cab superstructure which is flat fronted underneath the windscreen, and a cosmetic/aerodynamic fibreglass nose which houses the horns and headlights and acts as a crumple zone. More akin to an 80x (but obviously not to the same standards) than a HST for cab structure.
Pacers had fibreglass cabs and the outgoing Tyne & Wear Metro fleet does too.
What isn’t?
Wanting decrepit life expired stock to be phased out, that is approaching fifty years old, and the powers that be now want to extend into the 2030s simply because they can’t be bothered to pay for a replacement, isn’t reasonable!?
In which other transport industry would that be acceptable!? They’ve already accepted the stock continuing long after its design life.
You’d think from their statements that they were expecting all HSTs to suddenly disappear on the 12th August this year, and if that was what they’re expecting then it is unreasonable, solely as there’s no way any replacements would be ready in such a short timeframe. A five year legal deadline with no possibility of extension to replace the remaining HSTs from service, with a target to complete replacement sooner if possible, would be reasonable. That would still see the HSTs gone well before 2030.
We both know that in reality what ASLEF want is a timeframe that gets the HSTs replaced as quickly as practically possible, and that of course is reasonable.
As for nonsense, I’m confident that only people on this forum (and the DfT) would be arguing that rolling stock designed during the Vietnam war should continue until the 2030s!
I agree but unfortunately there’s precedent for such longevity on the railway, until 2021 there were still units on the Isle of Wight dating back to when Neville Chamberlain was PM and WW2 hadn’t even started! Yes the 483s were decades past their use by date but unfortunately their 80+ year career could be used by some in an attempt to justify retaining the HSTs into the 2030s.
There is nothing in a train built today that would have prevented that.
The driver from Grayrigg survived his cab being flung down an embankment at 95mph and flipping 180 degrees. The circumstances obviously weren’t identical between the two accidents but we know a HST powercar would have come out of Grayrigg looking almost identical to how 43140 came out of Carmont. The 390 held up incredibly well and that’s not even a brand new design it’s over 20 years old.
I can’t remember the specifics as it was discussed so long ago, but is that definitely how it happened?
Was it not the case that the franchise specified a requirement for inter city standard rolling stock and the winning bidder chose HSTs? If so the situation is subtly different than ScotGov asking for a particular class (happy to be corrected if that’s not the case).
Reportedly there was a survey over passenger facilities before the franchise was let and the overwhelming public response was that they wanted trains of comparable quality to what East Coast used to Aberdeen and Inverness at the time, which of course was HSTs. The franchise had a stock specification broadly matching that of a HST but not outright stipulating HSTs as a requirement. Abellio took “we want what East Coast have” literally.
I seem to recall First’s unsuccessful bid would have seen refurbished 170s instead. I’m not sure what the other bids proposed to use.
In any bidding process the bidder will put forward a proposal that meets the requirements. In the case of ScotRail the 170s were disliked by some and not thought to be commensurate with expectations for InterCity travel in a proper country, see Gerald and Mk4s in Wales. Transport Scotland were very happy with their new HSTs pronouncing in the franchise award factsheet five times the introduction of "hugely popular high speed trains"
170s in their existing configuration weren’t compliant with the specification but were able to be refurbished to comply, which at least one bidder proposed to do instead of using HST.