• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Could more IETs be built for operators such as LNER?

Status
Not open for further replies.

XAM2175

Established Member
Joined
8 Jun 2016
Messages
3,471
Location
Glasgow
DfT has just released the latest LNER agreement, and some details of the new trains are on page 153
Is this document new? It contains several pieces of outdated information, including reference to transporting Queen Elizabeth II...
They may have released it recently, but it's dated 24 June 2018 and the PDF was created on 13 September 2022 (co-incidentally).
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,150
Location
West Wiltshire
They may have released it recently, but it's dated 24 June 2018 and the PDF was created on 13 September 2022 (co-incidentally).

They may have released it recently, but it's dated 24 June 2018 and the PDF was created on 13 September 2022 (co-incidentally).
DfT uploaded version 1.5x 2nd June, with notice of variation.

The variation is basically an extension from June 2023 until 01:59 hours on 23 June 2025.

So unless I am being stupid, I would guess any other variations to service or rolling stock would also be included in newly published version called 1.5x

The original might have been 2018, version 1.2 was April 2020, version 1.4 in July 2021 etc
 

Railperf

Established Member
Joined
30 Oct 2017
Messages
3,683
I can't see 12-car 350/2s going down very well with travellers between Leeds and London at full fare prices.
Why not? They go down very well on LNWR services to Crewe and Liverpool at more reasonable prices than Avanti.
 

XAM2175

Established Member
Joined
8 Jun 2016
Messages
3,471
Location
Glasgow
DfT uploaded version 1.5x 2nd June, with notice of variation.

The variation is basically an extension from June 2023 until 01:59 hours on 23 June 2025.

So unless I am being stupid, I would guess any other variations to service or rolling stock would also be included in newly published version called 1.5x
Okay, but nothing in that file can be newer than the date it was last modified, which is 15 September 2022.
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,872
Why are they getting rid of the IC225s? Maintenance costs?
Because they're getting old and won't be fitted with ETCS which will make them useless for the route when it's fitted with the new signalling.
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
Why are they getting rid of the IC225s? Maintenance costs?
Because they're getting old and won't be fitted with ETCS which will make them useless for the route when it's fitted with the new signalling.
Nothing to say they couldn't be fitted with ETCS, but their age will be an issue, even with ETCS they realistically wouldn't last more than 6 or 7 years. The oldest is already 35 and the newest is now 32.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,185
Nothing to say they couldn't be fitted with ETCS, but their age will be an issue, even with ETCS they realistically wouldn't last more than 6 or 7 years. The oldest is already 35 and the newest is now 32.
Indeed - no reason to be designing and fitting ETCS on the Class 91s when they’re already past their design lifespan, and have no future beyond LNER (unlike the Class 90s).
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,785
Location
Somewhere, not in London
Indeed - no reason to be designing and fitting ETCS on the Class 91s when they’re already past their design lifespan, and have no future beyond LNER (unlike the Class 90s).
You could say the same about so many of the in scope freight fleets...
 

stevieinselby

Established Member
Joined
6 Jan 2013
Messages
1,698
Location
Selby
That was my understanding as well, nothing about the end of the 225 (not sure when the next major overhaul is due) but if they were to go they would be replaced by 5 car IETs already in service. So no more 2x 8xx, just single units and demand based pricing to deter potential passengers from travelling by train.
FTFY.
LNER trains are already busy for most of the day, with little realistic scope to move people to more lightly-used trains by cheaper advance tickets, so any use of demand-based pricing to manage loading on those shortened trains will simply be turning passengers away from the railways.
 

Failed Unit

Established Member
Joined
26 Jan 2009
Messages
9,786
Location
Central Belt
FTFY.
LNER trains are already busy for most of the day, with little realistic scope to move people to more lightly-used trains by cheaper advance tickets, so any use of demand-based pricing to manage loading on those shortened trains will simply be turning passengers away from the railways.
Which I think ultimately this is what DfT wants. Passengers are an inconvience. If you look in the South East they have scrapped a lot of stock because it is more profitable to have an overcrowded 8 car unit then an comfortably loaded 12 car unit.
 
Status