DanNCL
Established Member
Stadler are the only manufacturer to offer level boarding as standard but others have got a UK spec design ready for it - Alstom (Bombardier), CAF and Hitachi all offered it in their unsuccessful bids for the Tyne & Wear Metro fleet renewal as it was a condition of the tender.Manufacturers build to a specification. If a tender doesn’t stipulate level boarding, then it won’t be provided. If a tender does stipulate it then, well, Stadler has a major head start.
One thing I have noticed is that the 80xs when they are available rarely sit down in service. It wouldn’t surprise me if Hitachi were keeping 80xs at depot in a condition that anyone else would have sent them out in in an attempt to boost the official MTIN figures. A train can’t fail in service if it isn’t in service!In terms of low fleet availability on 80X, it does seem like something that could improve over time. It seems like a lot of train fleets have poor reliability to begin with, mostly because they are generally quite bespoke and engineers have to learn how best to maintain them. Probably a lot of playing it safe for the first few years, before you learn what the tolerances properly are.
It’s quite the contrast to the approach Hitachi took with the 91s for the short time that they maintained them - if it was capable of moving under its own power safely it went out, even if they had very little confidence in the loco being able to make it the full day without sitting down somewhere.
91s going out on 3 motors was a relatively frequent event. 2 motors less common but it happened, and the loco often didn't manage the full day without sitting down when that did happen.