If Mark Hopwood's statement that 67 cars have been bought is correct then, which I suppose it would be, some of these must be intermediates then.
Still, that's irrelevant to what I was saying. Whether they're intermediates or not, or whether they make up 33.5 whole two-carriage 230s or not (that was just how I chose to word it vice 67 carriages), 67 carriages is an awful lot just to cannibalise and use to top up
2 carriages.
There are two threads discussing this at once which is causing me much confusion.
If as
@12LDA28C says, this is GWR's commitment to the fast charge battery concept on their branch lines, seventeen would admittedly be a suitable number to cover Greenford (1), Marlow (2), Windsor (1), Henley (1), Gunnislake (1), Looe (1), Newquay (2 in future), Falmouth (2) and St Ives (2). That's 12 in use, or 13 when the Atlantic Coast Line works are complete, with four unallocated for maintenance or spare, per day.
BUT:
Windsor is extremely busy and the current 2-165s are often full and standing pre AND post COVID - the 230s will be a reduction in capacity at 18m vs 23m per carriage.
Henley until recently was booked a 3-165, I don't think the line can take 4-230 (though I'd be delighted to be proved wrong), and from 3-23m to 2-18m seems a very unfortunate reduction in capacity over a few years, admittedly perhaps in line with commuter habits. For these two, perhaps a 3 car variant would be needed, but then there wouldn't be enough of the 67 carriages to extend to all of the above branches.
St Ives has just had work done for 5 cars, again a 3 car variant would be needed which would mean more than 67 carriages used.
These lines getting 70s tube trains while Thames Valley gets new 387s, HSS gets new IETs and the rest of regional GWR gets brand new **whatever the recently announced tender brings up**, seems ridiculously unfair.
I guess we'll have to wait and see.