What opening dates are proposed for these two new stations?Deeside industrial estate for the wools amongst us. Woodchurch for arrowe park hospital although its not near enough for most to walk.
Parcffordd Glannau Dyfrdwy (Deeside Parkway Station) is much more advanced - designs done, but funding via levelling up funding turned down, with resubmission expected. Woodchurch is aspirational from Merseytravel, reckon years offWhat opening dates are proposed for these two new stations?
No one wants to go to Bidston. Merseyrail don't run Ellesmere Port trains as a shuttle just in case they might delay those from Chester when crossing the junction at Hooton, no they go through to Liverpool because that's where people want to go. The only reason that the Borderlands service was cut back to Bidston was that it allowed BR to use two units on the service instead of three (with proportionate cuts to traincrew diagrams too). Birkenhead North would need another unit but it would allow enough slack to be built into the schedule that junction conflicts wouldn't be a concern. The future though is 777s running through into the loop.would it be easier to do that then just adding a new terminating platform at Bidston to make the line independent to the level of the St Ives branch.
Even with going through to Birkenhead North then there's two sets of trains they could be delayed by
Who can forget the first day of IET operation at GWR?My point about the Networker doors was to illustrate that there were teething problems after those trains entered passenger service, but the teething problems could have been anything - doors, lights, seats or anything. They were not meant to be a direct comparison with the slow doors on the 230s.
Faults seem to be occurring immediately on contact with live service.Testing of new stock doesn't take place with a train fully loaded with passengers, and faults often only become apparent after several weeks or months of regular use in service and during a variety of weather conditions and so on. You can't really recreate those conditions during testing, simple as that.
For example, testing of the Marston Vale Class 230s took place at night for mileage accumulation and in my personal experience suffered very few problems during testing, yet they weren't particularly reliable once they entered service, by all accounts.
We're not really seeing that they can because they are not. Keeping to the timetable is black and white - it either can/does or it can't/doesn't. Running late but not as late as it did on its first day is still a failure.Seems pretty similar to the 484 introduction so far, significant issues with timekeeping and faults in the first few days but signs of promise too - we're already seeing proof that these *can* keep to time, and with more experience among traincrew timekeeping should only get better.
I've been using this line for over 20 years, during that time its been worked by 142s, 153s, 150s, and I can still count on one hand how many times its ran to time when ive used it. I used to commute from Neston for around a year, and every day without fail it was late, anything ranging from 2 to 15 minutes. It doesn't seem that long ago they were always turning back short at Shotton due to late running and skipping the wirral section.We're not really seeing that they can because they are not. Keeping to the timetable is black and white - it either can/does or it can't/doesn't. Running late but not as late as it did on its first day is still a failure.
Faults seem to be occurring immediately on contact with live service.
If its a door thing then you set up a rig to smash door button and opening cycles repeatedly and lean on/block/pull at the doors - like car companies do.
Then you drag some people in off the street and shuttle them up and down for a day to see how people do things differently from how the designers intend.
The Lizzie and DART both had days of public testing.Really? 'Drag some people off the street'? How would that work exactly? And you think one day's trial would be sufficient?
Not sure you can really compare a small company with limited staff and finances like VivaRail with a car manufacturer with a huge R&D department backed up by thousands of staff and virtually unlimited funds.
On closed railwaysThe Lizzie and DART both had days of public testing.
You still haven't explained how you'd fund this.If the trains are falling over as soon as they meet the public then it seems likely that packing the train out and getting them all in and out at every stop would reveal some issues - especially of the 'oh, why are they doing that? We didn't design it for them to do that!' type
I can't see any reason why it wouldn't be possible to invite 100 people up to Old Dalby or a rail-connected heritage railway and get them to simulate a number of round trips. However invited guests will likely be rail-interested people (who else would volunteer to test a train to breaking point?) and so not representative of full passenger service.Are there regulatory issues to prevent them doing it on the various test tracks if there isn't space to do it during early testing? A lot of the public interaction stuff wouldn't even need to run - just have a train and a platform, and whilst you would need the whole train to test the doors in action you wouldn't need every coach to be full of people.
A friend of mine was travelling on it. He said there was a dragging brake and they needed a line block to inspect the train. Declared a failure and everybody put on a bus.Second compete failure of the week today, what a shambles.
We're not really seeing that they can because they are not. Keeping to the timetable is black and white - it either can/does or it can't/doesn't. Running late but not as late as it did on its first day is still a failure.
From what I can see on a WTT schedule you have an end-to-end time of 58 minutes: https://www.realtimetrains.co.uk/service/gb-nr:V15255/2023-04-07/detailedIs it beyond the realms of knowledge of what this particular line has to allow for in order to produce a timetable that will allow for reality?
Is it beyond the realms of knowledge of what this particular line has to allow for in order to produce a timetable that will allow for reality?
It is worth noting the longest distance between any 2 stops on this service is 5 miles. Acceleration not top speed would serve you better. Also, given the number of stops and overall journey length Door speed really would be a massive factor here.Some ‘new’ trains and raising the line speed would be a good start.
Nationally there are bigger fish to fry, sorry to say.Much has been said about this particular route over the years, if the people in charge of running it have not grasped this by now then there is no hope for it in the near future.
As I have often remarked upon past threads, the door problem was encountered on the Vivarail units that once ran on the Marston Vale Line and this matter would have been known to Transport for Wales.It's notable how the faster acceleration but slower doors are leading to somewhat similar performance to the sprinters, I would be interested to see how a 197 does doing this route.
One can only assume that, for whatever reason, it was decided not to resolve this issue.As I have often remarked upon past threads, the door problem was encountered on the Vivarail units that once ran on the Marston Vale Line and this matter would have been known to Transport for Wales.
Disagree all you like but you are wrong. It is either on time or it isn't. It can either keep to time or it can't.As for timekeeping being 'black or white' I couldn't disagree more - perfect performance is impossible and there are always tradeoffs with timetable padding, journey time, frequency etc. Clearly timekeeping needs to improve but it's never going to be brilliant with the current timetable and the 150s sometimes struggled too AIUI.
I have a feeling the slow doors were one reason the Underground got rid of them well before theyAs I have often remarked upon past threads, the door problem was encountered on the Vivarail units that once ran on the Marston Vale Line and this matter would have been known to Transport for Wales.
There was an article in Railway Gazette yesterday which quoted 'industry insiders' as stating "timing runs on the Borderlands Line had shown that the Class 230s can keep to sectional running times". It went on to quote a TfW source ‘the torque from these sets is high and instant, acceleration is quite amazing, but the drivers need to be confident and allow the traction control to do its stuff. Most drivers have only been used to diesel sets, the Class 230s have diesel engines but they perform like an electric train and it will take time for the drivers to get used to driving in a different way.’Disagree all you like but you are wrong. It is either on time or it isn't. It can either keep to time or it can't.
The doors worked well in LU service, the trains were great for clearing crowds, much better than their predecessors. The door speed was certainly faster and the VivaRail modification removes the damper which prevented slamming.I have a feeling the slow doors were one reason the Underground got rid of them well before they
It might not be up to date, but rtt shows a full train service, which may well be 230sAre the 230s running on saturdays?
The doors may have bveen faster, but being single doors in 3/4 width apertures, they took longer to close than the old double doors because they had further to go. And because the apertures were smaller, it took longer for boarding and alighting.The doors worked well in LU service, the trains were great for clearing crowds, much better than their predecessors. The door speed was certainly faster and the VivaRail modification removes the damper which prevented slamming.
Slow doors wasn’t the reason LU withdrew them after 37 years service.
It may be almost self contained (the only potential conflict with another passenger service is at Bidston), but 58 minutes end to end with a scheduled 2-hour round trip makes for layovers of just two minutes at each end - barely enough time to walk from one cab to the other (these are 3-car units!), let alone shut down one cab and set up the other, deal with any issues that have developed en route, or attend to any personal needs. Recovery time? Forget it.From what I can see on a WTT schedule you have an end-to-end time of 58 minutes: https://www.realtimetrains.co.uk/service/gb-nr:V15255/2023-04-07/detailed
At tghe moment it seems they're not running on weekdays - at least not very far into the afternoonAre the 230s running on saturdays?
Thank you very muchIt might not be up to date, but rtt shows a full train service, which may well be 230s
Realtime Trains | Departures from Bidston all day on 08/04/2023
Train information at Bidston all day on 08/04/2023. From Realtime Trains, an independent source of train running info for Great Britain.www.realtimetrains.co.uk
OK thank you.The doors may have bveen faster, but being single doors in 3/4 width apertures, they took longer to close than the old double doors because they had further to go. And because the apertures were smaller, it took longer for boarding and alighting.
== Doublepost prevention - post automatically merged: ==
It may be almost self contained (the only potential conflict with another passenger service is at Bidston), but 58 minutes end to end with a scheduled 2-hour round trip makes for layovers of just two minutes at each end - barely enough time to walk from one cab to the other (these are 3-car units!), let alone shut down one cab and set up the other, deal with any issues that have developed en route, or attend to any personal needs. Recovery time? Forget it.
Stepping back would need an extra driver (two if it's done at both ends) and a lot of standing around.
But TfW have ordered five units. A hourly schedule could be maintained using three of them, with a 32 minute layover at each end - now, you can't have a unit occupying the platform at Bidston for half the time, but there is a bay at Birkenhead North, only 2 or 3 minutes away, and you would still have a layover of 20 minutes or so.
Five units would be enough to run a half-hourly service with a 13 minute layover at Birkenhead North and Wrexham Central (as long as something was available to provide maintenance cover - (there are three units sitting at Bletchley doing nothing.......)
== Doublepost prevention - post automatically merged: ==
At tghe moment it seems they're not running on weekdays - at least not very far into the afternoon
Disagree all you like but you are wrong. It is either on time or it isn't. It can either keep to time or it can't.
If it is never going to be brilliant with the current timetable then it is clearly an unsuitable train and should never have been ordered.
Some people's attempts at arguing that the train is great but everything else is wrong is bizarre.