The speculative thread on 185 futures suggests otherwise... They're purpose built units for the route and aren't particularly attractive elsewhere.Eversholt who could easily find someone else to take on 21 185s
The speculative thread on 185 futures suggests otherwise... They're purpose built units for the route and aren't particularly attractive elsewhere.Eversholt who could easily find someone else to take on 21 185s
Emphasis on the word 'speculative'. We all know that if allowed many UK TOCs would snatch them up quickly. More likely though I suspect is Iarnrod Eireann would take them and convert them to run on Irish Gauge, as they've hinted previously that they'd be interested in doing.The speculative thread on 185 futures suggests otherwise... They're purpose built units for the route and aren't particularly attractive elsewhere.
Yes. I have been ignoring that inconsistency. Has the whole thread gone off at a tangent ?.Am I possibly the only one who read this thread’s title as “
“TPE Nova 3 sets to be withdrawn”, with “185s off to TFW”?
Amazing how you can read it to imply something completely different to how the discussion has progressed…
Surely no one wants one or two Mk5 sets as substitutes for a larger fleet of Mk4s. That really would be a microfleet.There are two ways of looking at this.
If the spare could be a mk5 set substituting, then it is better to spend money on that than another 33year old mk4 set
The alternative is have no long term plan for these routes so not keeping an eye open to grab any potential stock that would allow services to be improved.
I don't know how Wales focused TfW is, they accept English trains to Cardiff etc, but currently choose not to operate few miles over the English border to big cities like Bristol. What is their focus and aspirations as that might determine what gets approved financially
That was my impression. With hindsight TPE would have ordered more 802s and been as patient as they have ended up having to be anyway. Not even sure the 397s were worth missing out on 802s for. (I hate 8XXs btw !)The reality is surely that the Mk5s are a mistake (like the 319 to 769 conversions) in that they were supposed to be a quick way to get new trains whilst TransPennine waited for the 802s and 397s to be delivered, but they turned out to be unreliable and so harder to get into service. If I were a train operator I would want a very good deal indeed on these before I would take them on. The threat of them having no home to go to is of course the market force which will drive the price down to something which might then make them worth the hassle. Failing that, they are likely to be the newest vehicles scrapped.
I have wondered are these an answer to some peoples desires for couchettes on the Scottish sleepers. Yeah I know 16 coaches long already and our small loading guage.What is sad about that? If something doesn't work, it should be binned, and lessons can be learnt from the mistakes made. That is one of the advantages of leasing rolling stock. It is no different to an office block, or a shop, standing vacant because it isn't needed.
A train should not have sentimental value. It is just an investment, and in the case of these trains a bad one. The 68s could find other freight work. The rolling stock could be rebuilt, or recycled.
Gulp, well that's it then - easy way out.According to the 2016 TPE franchise agreement, the lease expiry dates for the Mk5a's, 68s, 397s and 802s were to be 1st April 2023 (this was originally to be the end date of the franchise, until the DfT and First agreed early termination in 2021). I stand to be corrected, but I would assume that it remains the case that the stock can be returned to the lessors without penalty from this date.
Given the DfT's current focus on cost cutting, I imagine they will be looking critically at the scope for savings in TPE lease expenditure and other operating costs. The Mk5a+68 fleet would seem to be especially vulnerable unless new "firesale" lease rates have been negotiated.
I suppose it is the leasing companies that lose out. The railway itself has not lost out on these trains if they are abandoned now. The railway did waste time, effort and money (unless charged on usage) trying to use them.My sadness has nothing to do about sentimentality. It's sad to see an industry I care about waste money on failed projects, especially when there are so many other areas for potential improvement crying out for investment.
A combination of DFT incompetence, TPE incompetence, CAF quality issues and an obsession with some forum members of binning anything on TPE that isn't a 185 or 802.Does anyone here know exactly what is the problem with Class 68/Mark 5 combinations.
Class 68s seem to have operated fairly satisfactorily on Chiltern in push-pull mode with Mark 3 stock.
So is the problem something silly like software problems, or what else ???
The noise issues with the 68s (I love em pardon, what).Does anyone here know exactly what is the problem with Class 68/Mark 5 combinations.
Class 68s seem to have operated fairly satisfactorily on Chiltern in push-pull mode with Mark 3 stock.
So is the problem something silly like software problems, or what else ???
... who was reading a post generated by ChatGPT by the sounds of it.So many people seem to be taking this thread as fact yet it’s in the speculative section and the source is a mate on Facebook.
TPE must have spent a considerable amount of time and man power getting these trains ready for service, before the first sets even arrived. Even if they don't have to pay the leasing costs, there's a lot of money gone into training, at a time when TPE have been struggling to man all their services as it is.I suppose it is the leasing companies that lose out. The railway itself has not lost out on these trains if they are abandoned now. The railway did waste time, effort and money (unless charged on usage) trying to use them.
They looked at it, and decided not to bother. They've subsequently ordered new rolling stock purpose built for their network, so I'd say that ship has sailedEmphasis on the word 'speculative'. We all know that if allowed many UK TOCs would snatch them up quickly. More likely though I suspect is Iarnrod Eireann would take them and convert them to run on Irish Gauge, as they've hinted previously that they'd be interested in doing.
They haven't got permission to run to Bristol. The services they run into England now is pretty much the limit of what they're allowed to run.I don't know how Wales focused TfW is, they accept English trains to Cardiff etc, but currently choose not to operate few miles over the English border to big cities like Bristol. What is their focus and aspirations as that might determine what gets approved financially
Beacon only owns the coaches, not the 68s, which could potentially find work as freight locos. And TPE is incurring substantial ongoing crew training costs from its attempts to operate the sets. Therefore I do not think that an attractive lease price offer from Beacon would necessarily be sufficient to save the Mk5a's.Beacon Rail have a fleet that’s almost new with little prospect of finding work elsewhere, they’ll probably offer TPE a price that the DFT can’t refuse.
It's twitter actually.So many people seem to be taking this thread as fact yet it’s in the speculative section and the source is a mate on Facebook.
This is more or less my understanding: lack of mk5 rakes in service is more due to training backlogs caused by industrial trouble than any inherent reliability (or lack thereof) in the rolling stock itself? Or am I incorrect?A combination of DFT incompetence, TPE incompetence, CAF quality issues and an obsession with some forum members of binning anything on TPE that isn't a 185 or 802.
Yes. Also lets face it TPE have trained staff for the 185s (and have to keep them up-to-date) even if TPE do not use all of the 185s so it makes sense to use all of the 185s if TPE can dispense with another whole (micro) fleet instead.Beacon only owns the coaches, not the 68s, which could potentially find work as freight locos. And TPE is incurring substantial ongoing crew training costs from its attempts to operate the sets. Therefore I do not think that an attractive lease price offer from Beacon would necessarily be sufficient to save the Mk5a's.
My feeling is that, regardless of why the Mk5s are not used much, the here and now is that the Mk5s are a good candidate sadly for getting rid of. There seems to be a need for TPE to get rid of some stock or is there ?.This is more or less my understanding: lack of mk5 rakes in service is more due to training backlogs caused by industrial trouble than any inherent reliability (or lack thereof) in the rolling stock itself? Or am I incorrect?
Technically we’re both right - Beacon owns the 68s and leases them to DRS who sub lease them on to TPE. The middle man (DRS) was cut out for the Mark 5s with Beacon leasing directly to TPE.Beacon only owns the coaches, not the 68s, which could potentially find work as freight locos. And TPE is incurring substantial ongoing crew training costs from its attempts to operate the sets. Therefore I do not think that an attractive lease price offer from Beacon would necessarily be sufficient to save the Mk5a's.
Spot on pretty much. Industrial relations and TPE’s decision to reduce crew route knowledge has led to the training issues.This is more or less my understanding: lack of mk5 rakes in service is more due to training backlogs caused by industrial trouble than any inherent reliability (or lack thereof) in the rolling stock itself? Or am I incorrect?
185 traction knowledge is starting to lapse too. Newcastle have lost it entirely, which might not seem relevant but during disruption will make things massively worse, as most Newcastle services now can’t be anything other than an 802. A 185 can only work to Newcastle if taken there and back by a York crew.Yes. Also lets face it TPE have trained staff for the 185s (and have to keep them up-to-date) even if TPE do not use all of the 185s so it makes sense to use all of the 185s if TPE can dispense with another whole (micro) fleet instead.
That would only be possible if Newcastle was cut to hourly, Redcar and Scarborough cut back to shuttles from York, and Hull going to Northern. Neither the Mark 5s nor 802s have great availability, they couldn’t cover anywhere near what the 185s cover on top of everything they already cover.I just remembered - a number of the 185s were to go anyway. Would TPE be trimming down far enough to dispense with all the 185s if they kept the Mk5s ?. Just remembering the largely ignored & confused thread title. Worst still are both Mk5s and 185s going !.
That is why removing the 68+Mk5 has significant advantages for the effective operation of TPE. One less fleet to try and get traincrew to learn. One less fleet to pay out for maintenance.None of the three traction types on North TPE are signed by every crew anymore, and no crew signs all three traction types. Newcastle is missing 185s whilst Hull only has 185s. Everywhere else has either 68+Mark 5s or 802s but not both.
The whole thing is a mess.
One could argue the same for the 802s if it wasn’t for the recent removal of 185s from Newcastle. In fact being able to use the 802s flexibly on North TPE would require even more training than the same would for the 68+Mark 5 sets - three depots as opposed to two. And in both cases that’s keeping Hull as 185 only.That is why removing the 68+Mk5 has significant advantages for the effective operation of TPE. One less fleet to try and get traincrew to learn. One less fleet to pay out for maintenance.
Given so few services are worked by 68+Mk5, getting rid would make for a better operation.
Except for 68033/4 which are owned by DRS.Technically we’re both right - Beacon owns the 68s and leases them to DRS who sub lease them on to TPE.
The 185's are very nice trains. Perfect for TPE, although fuel consumption and weight are a bit high.It's nice to hear some intelligent thinking for once. The 68s are far more of a problem than the 185s, and if the 185s stay with TPE, people can stop talking about where to put them, as TPE is already their perfect home.
TransPennine Express have been using direct public funding to pay leases on near-unused trains for many years now though. They've additionally been paying to rent storage sites for them.I suppose it is the leasing companies that lose out. The railway itself has not lost out on these trains if they are abandoned now. The railway did waste time, effort and money (unless charged on usage) trying to use them.
no way for the Norwich-liverpool, that route requires sprinter differentials, which neither the 185 or the 68s can meet.I think the biggest issue is... TPE. They're a shambles, cannot get their house in order. I think their training programme is just that, a programme, nothing else!
Mk5s could be an interesting proposal for TFW. Cardiff Manchster is a long way on a small DMU.
Scotrail I could also see. Maybe even Norwich-Liverpool .
A TOC that already maintained CAF fleet would make sense, although different from DMUs/EMUs, there will be some commonality as far as maintainence goes.
Of course, lime everything, it's all speculation until its confirmed.
no way for the Norwich-liverpool, that route requires sprinter differentials, which neither the 185 or the 68s can meet.
Why do people keep proposing stock that definitely isn't suitable (ie anything without sprinter differentials) for Norwich-Liverpool?
That's fair enough, It's just surprising it keeps happening to that route in particularBecause this is largely an enthusiasts forum where a large number of people aren’t expected to understand all the operational aspects of the railway.
That's fair enough, It's just surprising it keeps happening to that route in particular
I mean, I am an enthusiast too!
no way for the Norwich-liverpool, that route requires sprinter differentials, which neither the 185 or the 68s can meet.
Why do people keep proposing stock that definitely isn't suitable (ie anything without sprinter differentials) for Norwich-Liverpool?
AIUI the differences between SP and normal speeds on the line between Ely and Norwich are a lot larger than they were on the Scarborough line, to the point that it wouldn't be practical.Well it’s not impossible to run services without sprinter differentials, the Scarborough line went from 158s with differentials to 185s and more latterly 68s without it just needs some timetable replanning (an almost identical situation to the Peterborough to Norwich route).
And on fire half the time?Will they end up like the 180s, unloved and passed around?
Grand Central will want them in that case - D. B. Arriva's Orphanage for Unloved TrainsWill they end up like the 180s, unloved and passed around?
So many people seem to be taking this thread as fact yet it’s in the speculative section and the source is a mate on Facebook.
You’re not helping your case!It's twitter actually.
Not everyone knows all the Route SpeedsBecause this is largely an enthusiasts forum where a large number of people aren’t expected to understand all the operational aspects of the railway.