• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Future of TPE

Status
Not open for further replies.

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,647
Location
Croydon
1: I think so, kicking the can down the road is their stock approach. I think a lot of demand for the TPE has moved to other TOCs and the roads. It's possible it won't recover unless proper investment is made, beyond the TRU, I mean actually getting the TPE routes back to health again.
2: No. What 'unpleasant conclusions' did you have in mind? If TPE was dissolved tomorrow and operations were split up even assuming the costs of training would be absorbed by the DfT other TOCs are far more competant in managing crisis and getting up to scratch and being efficient. TPE is just an unfit operation full stop. It's an oportunity to gut the current management is how I see it. Obviously all academic as DfT will not be coughing up.
I can see, given time, TPE destroying their own justification to exist with no need for most of the services so an "easy" solution. Then, furthermore, I fear DfT say look there is so little demand what is the point in the TRU.


The railway is in bad need of pulling its socks up and sorting itself out where it can by itself for itself.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

MattRat

On Moderation
Joined
26 May 2021
Messages
2,128
Location
Liverpool
1: I think so, kicking the can down the road is their stock approach. I think a lot of demand for the TPE has moved to other TOCs and the roads. It's possible it won't recover unless proper investment is made, beyond the TRU, I mean actually getting the TPE routes back to health again.
Speaking of TRU got me thinking about NPR. If the current fiasco has reduced demand, wouldn't that damage the business case for NPR, which might turn into "no demand, no NPR".

And of course, the longer the DFT put their head in the sands about the problem, the more it might look intentional if that statement is said further down the line.
 

LittleAH

Established Member
Joined
24 Oct 2018
Messages
1,211
Can I just say this thread has turned absolutely wild, with all sort of nonsense flying around.

1) TPE won't be merging with Northern - something which would create even more issues and solve absolutely nothing.
2) TRU is happening. To suggest it's not needed because of the ongoing TPE issues is absolutely bonkers.
3) Emergency timetables aren't the silver bullet some seem to think they are. See DfT requirements and political stakeholder reactions.

In the short term the option for TPE is either 1) Contract extension with First Group but with significant change at the top and caveats on performance or 2) Operator of Last Resort.

Either of those won't resolve the fundamental issues and causes of TPE's problems. Which has been a combination, IMO, of DfT being useless and woeful senior leadership at TPE.
 

RailWonderer

Established Member
Joined
25 Jul 2018
Messages
2,217
Location
All around the network
I can see, given time, TPE destroying their own justification to exist with no need for most of the services so an "easy" solution. Then, furthermore, I fear DfT say look there is so little demand what is the point in the TRU.


The railway is in bad need of pulling its socks up and sorting itself out where it can by itself for itself.
Speaking of TRU got me thinking about NPR. If the current fiasco has reduced demand, wouldn't that damage the business case for NPR, which might turn into "no demand, no NPR".

And of course, the longer the DFT put their head in the sands about the problem, the more it might look intentional if that statement is said further down the line.
There is always the vicious cycle possiblity, where falling demand leads to a fall in investment which leads to a fall in ridership etc, although the funding has already (I think) been earmaked so TRU is happening (though I don't know about the rest of NPR).
Can I just say this thread has turned absolutely wild, with all sort of nonsense flying around.

1) TPE won't be merging with Northern - something which would create even more issues and solve absolutely nothing.
2) TRU is happening. To suggest it's not needed because of the ongoing TPE issues is absolutely bonkers.
3) Emergency timetables aren't the silver bullet some seem to think they are. See DfT requirements and political stakeholder reactions.

In the short term the option for TPE is either 1) Contract extension with First Group but with significant change at the top and caveats on performance or 2) Operator of Last Resort.

Either of those won't resolve the fundamental issues and causes of TPE's problems. Which has been a combination, IMO, of DfT being useless and woeful senior leadership at TPE.
This thread is speculative so we tend to run wild here, the suggestion was only that TPE would be better off merged into different operators since that allows to eliminate TPE management and dissolve the whole operation.

The argument has gone on and on and on about whether emergency timetables would be a short term solution and I don't intend to string along that argument because it goes nowehere.
Agree with your conclusion however, DfT = useless and TPE management = woeful.
 
Last edited:

L+Y

Member
Joined
4 Jul 2011
Messages
502
For those with more knowledge than me- is RDW really the root of the TPE issues? If an RDW agreement was signed, would problems be eliminated, or merely somewhat reduced?

And just how generous were the previous terms, and what's been offered since?
Just reposting these queries, as I think they got lost at the bottom of the previous page!
 

Msq71423

Member
Joined
30 Jun 2022
Messages
96
Location
North West
Here's something simple that may solve TPEs problems, quickly. Basically, the DfT need to allow TPE to offer the drivers the RDW payments they are asking for. I'm sure in a fantasy world this would solve many of their problems!
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,870
Here's something simple that may solve TPEs problems, quickly. Basically, the DfT need to allow TPE to offer the drivers the RDW payments they are asking for. I'm sure in a fantasy world this would solve many of their problems!
Except ASLEF's policy is to not sign any RDW agreements when they're in dispute with the company. So you'd need to settle the industrial dispute first...
 

WAB

Established Member
Joined
27 Jun 2015
Messages
1,297
Location
Anglia
They would be totally inappropriate for them as although they don't need high diesel speeds, they do need 125mph operation on electric, and such a bi-mode locomotive doesn't exist.
...yet...

They might be quite tempting around 2027 if Beacon Rail were to make mk 5A + a new 125-capable bimodal locomotive available to them at a cost lower than and a shorter lead time than 10 80xs.
 

Jacob Porrett

Established Member
Joined
28 Jan 2022
Messages
1,961
Location
Telford
Rumours going around that TPE and Northern could emerge together and become a "Super TOC". Would this be a good/bad idea?
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,356
Location
Yorks
Rumours going around that TPE and Northern could emerge together and become a "Super TOC". Would this be a good/bad idea?

I think if you combined Northern from now, and TPE from about two and a half years ago (when they had the new rolling stock, but before they went down the pan) it could be pretty good.
 

LittleAH

Established Member
Joined
24 Oct 2018
Messages
1,211
Rumours going around that TPE and Northern could emerge together and become a "Super TOC". Would this be a good/bad idea?
There’s no rumours. It’s what the metro mayors are branding about. With no conceivable suggestions on how it would work.

Suspect we will find out in the next few weeks what will happen. The two most obvious outcomes are 1) OLR 2) Short term extension to the contract and a few directors get binned off.
 

Jacob Porrett

Established Member
Joined
28 Jan 2022
Messages
1,961
Location
Telford
Depends, what problem would this solve?
Not really sure to be honest.

== Doublepost prevention - post automatically merged: ==

There’s no rumours. It’s what the metro mayors are branding about. With no conceivable suggestions on how it would work.

Suspect we will find out in the next few weeks what will happen. The two most obvious outcomes are 1) OLR 2) Short term extension to the contract and a few directors get binned off.
Probably OLR would be a better option than a contract extension. Might make things slightly better than having to cancel more services.
 

mike57

Established Member
Joined
13 Mar 2015
Messages
2,394
Location
East coast of Yorkshire
Probably OLR would be a better option than a contract extension. Might make things slightly better than having to cancel more services.
If that means that a deliverable timetable is introduced then I agree. As a passenger I cannot currently plan a trip two or three days ahead, and that means I cant use the train, even although for the majority of my journeys it should be the logical option.

A new emergency timetable may end up being half what it should be, but at least if that half runs then I stand a chance, I can time my journey to complete my business. The current lottery with cancellations at random upto 10pm the day before just cant work for me, and I suspect a lot of others.

Why TPE couldn't take the Avanti approach and cut the timetable to something they can deliver with current resources just doesn't make sense. That should also mean that all routes can have 5/6 cars on all services.

It would be interesting to know how much TPE usage is compared to pre covid, I suspect its well down on other operators

The cynic in me would say that the DfT have sat and watched the chaos at TPE and rubbed their hands with glee, reduced passenger numbers means they will be able justify putting all the Leeds Manchester improvements on hold bar those started.
 

Jacob Porrett

Established Member
Joined
28 Jan 2022
Messages
1,961
Location
Telford
If that means that a deliverable timetable is introduced then I agree. As a passenger I cannot currently plan a trip two or three days ahead, and that means I cant use the train, even although for the majority of my journeys it should be the logical option.

A new emergency timetable may end up being half what it should be, but at least if that half runs then I stand a chance, I can time my journey to complete my business. The current lottery with cancellations at random upto 10pm the day before just cant work for me, and I suspect a lot of others.

Why TPE couldn't take the Avanti approach and cut the timetable to something they can deliver with current resources just doesn't make sense. That should also mean that all routes can have 5/6 cars on all services.

It would be interesting to know how much TPE usage is compared to pre covid, I suspect its well down on other operators

The cynic in me would say that the DfT have sat and watched the chaos at TPE and rubbed their hands with glee, reduced passenger numbers means they will be able justify putting all the Leeds Manchester improvements on hold bar those started.
Have to wait and see to be honest. It's not a good look really but it is what it is at the end of the day unfortunately. Embarrassing for TPE.
 

Mollman

Established Member
Joined
21 Sep 2016
Messages
1,714
Location
Preston
A number of notices have appeared on a tendering site a visit (sorry can't link) in relation to extension of various rolling stock related contracts which state for example:
In preparation for an award of a National Rail Contract from the Department for Transport to Transpennine Express Limited (operated by First Group), it is intended to extend the rolling stock lease with Angel Trains Limited for the fleets of trains currently under lease with Angel Trains Limited. The leases are expected to be extended in accordance with paragraph II.2.4 below.
The Contracting Authority will observe a 10 day standstill period from the date of issue of this notice prior to entering into the lease extensions with Angel Trains Limited...
II.2.4) Description of the procurement
The Contracting Authority intends to extend the rolling stock lease in accordance with Regulation 50(1)(c)(ii) of the Utilities Contract Regulations 2016 for technical reasons. This is because there is no other UK based fleets available in sufficient quantities or within the requisite timeframe to meet TPE's needs for the National Rail Contract.
TPE intend to award a lease extension with Angel Trains Limited for the Class 802 rolling stock. The current lease expires in May 2023 and it is intended to extend the lease until May 2028 with a further 4 year option until May 2031 or an option to extend the lease from May 2023 to May 2031.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,647
Location
Croydon
A number of notices have appeared on a tendering site a visit (sorry can't link) in relation to extension of various rolling stock related contracts which state for example:
In preparation for an award of a National Rail Contract from the Department for Transport to Transpennine Express Limited (operated by First Group), it is intended to extend the rolling stock lease with Angel Trains Limited for the fleets of trains currently under lease with Angel Trains Limited. The leases are expected to be extended in accordance with paragraph II.2.4 below.
The Contracting Authority will observe a 10 day standstill period from the date of issue of this notice prior to entering into the lease extensions with Angel Trains Limited...
II.2.4) Description of the procurement
The Contracting Authority intends to extend the rolling stock lease in accordance with Regulation 50(1)(c)(ii) of the Utilities Contract Regulations 2016 for technical reasons. This is because there is no other UK based fleets available in sufficient quantities or within the requisite timeframe to meet TPE's needs for the National Rail Contract.
TPE intend to award a lease extension with Angel Trains Limited for the Class 802 rolling stock. The current lease expires in May 2023 and it is intended to extend the lease until May 2028 with a further 4 year option until May 2031 or an option to extend the lease from May 2023 to May 2031.
I am guessing the year 2028 (my bold) is meant to be 2027 ?. That would be four years plus four years to 2031.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,144
Location
West Wiltshire
I guess the future of TPE will be announced in next few days

Some sort of PR spin version of we know you have been terrible, don't employ enough trained staff to work your schedule, but we are unlikely to win any votes in north, so giving current operator an extension with vague target of try and do better.
 

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
I guess the future of TPE will be announced in next few days

Some sort of PR spin version of we know you have been terrible, don't employ enough trained staff to work your schedule, but we are unlikely to win any votes in north, so giving current operator an extension with vague target of try and do better.
I have a feeling it's going to be OLR with a franchise reorganisation for the North announced but kicked into the long grass with GBR.
The 802 routes and Newcastle on Northern should go to LNER, some of the Sheffield routes and the 170s should go to EMR while the 397s go to AWC. Once all that's been stripped away, Northern then splits into a dedicated fleet in Merseyrail livery for the City line, a fleet in GM livery for GM services while there would also be a WY local fleet. Then there would be the resurrection of Northern Connect and the bland Northern would stay for rural services though this is all a bit crayonista.
 

HamworthyGoods

Established Member
Joined
15 Jan 2019
Messages
4,478
I have a feeling it's going to be OLR with a franchise reorganisation for the North announced but kicked into the long grass with GBR.
The 802 routes and Newcastle on Northern should go to LNER, some of the Sheffield routes and the 170s should go to EMR while the 397s go to AWC. Once all that's been stripped away, Northern then splits into a dedicated fleet in Merseyrail livery for the City line, a fleet in GM livery for GM services while there would also be a WY local fleet. Then there would be the resurrection of Northern Connect and the bland Northern would stay for rural services though this is all a bit crayonista.

I think it’s been said a few times OLR doesn’t want to tarnish its reputation with something it feels it’s unable to improve.
 

Bertie the bus

Established Member
Joined
15 Aug 2014
Messages
3,216
Does OLR have a reputation with people outside the industry or enthusiasts?
No, and it isn't the place of an operator of last resort to pick and choose which TOCs it operates. I'm puzzled what people think operator of last resort means and why they think only the top, most efficient TOCs would be operated by it.
 

Efini92

Established Member
Joined
14 Dec 2016
Messages
2,137
I have a feeling it's going to be OLR with a franchise reorganisation for the North announced but kicked into the long grass with GBR.
The 802 routes and Newcastle on Northern should go to LNER, some of the Sheffield routes and the 170s should go to EMR while the 397s go to AWC. Once all that's been stripped away, Northern then splits into a dedicated fleet in Merseyrail livery for the City line, a fleet in GM livery for GM services while there would also be a WY local fleet. Then there would be the resurrection of Northern Connect and the bland Northern would stay for rural services though this is all a bit crayonista.
The 397’s should go back to Spain.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
I think it’s been said a few times OLR doesn’t want to tarnish its reputation with something it feels it’s unable to improve.
Its more that the OLR will struggle to take on any more operations. Northern wasn't in good shape when it was taken over, SouthEastern didn't seem that bad so its interesting that it was decided to take it over rather than fining Govia.
 

sprinterguy

Veteran Member
Joined
4 Mar 2010
Messages
11,573
Location
Macclesfield
I have a feeling it's going to be OLR with a franchise reorganisation for the North announced but kicked into the long grass with GBR.
The 802 routes and Newcastle on Northern should go to LNER, some of the Sheffield routes and the 170s should go to EMR while the 397s go to AWC. Once all that's been stripped away, Northern then splits into a dedicated fleet in Merseyrail livery for the City line, a fleet in GM livery for GM services while there would also be a WY local fleet. Then there would be the resurrection of Northern Connect and the bland Northern would stay for rural services though this is all a bit crayonista.
Sounds like reorganisation for nothing better than reorganisation's sake, guaranteed to cause additional disruption in the medium term even compared to the status quo.
The 397’s should go back to Spain.
To be replaced by what? I sure as heck don't want to see the dark days of single 185s being stretched to cover North West - Scotland services again. A dedicated fleet of route-appropriate electric units is the greatest benefit the burgeoning corridor has gained in thirty years.

Granted there's an additional two 'intercity' fleets available now that it might be possible to juggle, but I wouldn't want to see the booked return of single 185s to key long distance Transpennine services, either.
 
Last edited:

Some guy

Member
Joined
6 Feb 2022
Messages
507
Location
Preston
cross country should take over the services it would mean direct services from reading, Southampton and Bournemouth to Glasgow and Edinburgh for the sake of sacrificing Manchester airport stop but still serving Piccadilly
 

waverley47

Member
Joined
17 Apr 2015
Messages
844
cross country should take over the services it would mean direct services from reading, Southampton and Bournemouth to Glasgow and Edinburgh for the sake of sacrificing Manchester airport stop but still serving Piccadilly

What stock? There aren't enough voyagers and there aren't enough other 125 mph bimode/diesel units, of you could even get DfT to pay for them.

Timekeeping would be atrocious. Pathing long distance services through Piccadilly 13/14 is idiotic, and you'd end up importing delays from the Glasgow suburban network, through the northern WCML, Castlefield Corridor and Birmingham New Street into third rail land, and vice versa.

Sacrificing timetable integrity and train capacity for the sake of direct trains between Carlisle and Bournemouth is not the best idea.
 
Status
Not open for further replies.

Top