• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Wrong TOC Code on RTT

Status
Not open for further replies.

Envoy

Established Member
Joined
29 Aug 2014
Messages
3,154
Why does Real Times Trains still mark TfW trains as being operated by AW (Arriva Wales) when this has not been the case for years.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,462
Location
Yorkshire
It's not at all wrong; AW is the correct TOC code for TfW.

TOC codes rarely change; if they did a lot of systems would need to be corrected/amended and this would cause a lot of additional work.

TOC codes are generally not reflective of current names, e.g. West Midlands Trains is LM, LNER is GR, Avanti is VT, and so on.

Lumo can't be LM, LO (London Overground), or LU (London Underground), so LD it is.
 

Bertie the bus

Established Member
Joined
15 Aug 2014
Messages
3,216
Just like VT is the code for Avanti and GR is the code for LNER even though GNER hasn't existed for about a decade.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,723
Why does Real Times Trains still mark TfW trains as being operated by AW (Arriva Wales) when this has not been the case for years.
Don't over think it, why change it when it doesn't need to be.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,735
Location
"Marston Vale mafia"
This is a typical IT dilemma. Often you will have a code in the background representing something, e.g. the name of an assignment group on a helpdesk, so that you can change the display text later if you want. But people object if that code in the background looks too much like the text and then the text changes like it has here.

The way you avoid this is by having the code *not* resemble the text, e.g. you'd just number the TOCs arbitrarily, or use arbitrary random letter codes. But we are where we are.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,629
Location
Northampton
This is a typical IT dilemma. Often you will have a code in the background representing something, e.g. the name of an assignment group on a helpdesk, so that you can change the display text later if you want. But people object if that code in the background looks too much like the text and then the text changes like it has here.

The way you avoid this is by having the code *not* resemble the text, e.g. you'd just number the TOCs arbitrarily, or use arbitrary random letter codes. But we are where we are.
The really silly thing about this is the TOCs already have Arbitrary 2-letter codes in things like TPS - e.g. SWR are HY, Northern are ED, GWR are EF. http://www.railwaycodes.org.uk/operators/servicegroups.shtm
 

pdeaves

Established Member
Joined
14 Sep 2014
Messages
5,932
Location
Gateway to the South West
Lumo can't be LM, LO (London Overground), or LU (London Underground), so LD it is.
LD happens to be one of the few cases where the public timetable code is the same as the internal business code. Probably because the other options don't work (as you said), so it may be simpler to make the two match.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,629
Location
Northampton
LD happens to be one of the few cases where the public timetable code is the same as the internal business code. Probably because the other options don't work (as you said), so it may be simpler to make the two match.
Locomotive Services (LS) are the only other TOC where they match.
 

Envoy

Established Member
Joined
29 Aug 2014
Messages
3,154
Many thanks everyone for your responses.
 

Townsend Hook

Member
Joined
3 Aug 2011
Messages
932
Location
GB
It has always seemed a little strange to me that nowadays the codes seem to be set in stone, whereas it doesn’t seem that long ago (2005? Wikipedia says 2003 but doesn’t cite a reference, and that sounds too early to me.) that South Central rebranded to Southern and had their code changed from SC to SN; just a simple rebranding and not even a franchise renewal or anything.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,629
Location
Northampton
It has always seemed a little strange to me that nowadays the codes seem to be set in stone, whereas it doesn’t seem that long ago (2005? Wikipedia says 2003 but doesn’t cite a reference, and that sounds too early to me.) that South Central rebranded to Southern and had their code changed from SC to SN; just a simple rebranding and not even a franchise renewal or anything.
The South Central case seems to be unique in that it's flipped between the two (See http://www.railwaycodes.org.uk/operators/franchises1.shtm#sn). However it's never been impossible to change, just not worth the bother. In this situation, confusion with a scottish operator is possible so this may have prompted the change (Scotrail using SR). Or the new Franchisee had a strong desire to change the code (Notably GNER changed from EC to GR in 1997).
 

Ian Hardy

Member
Joined
18 Nov 2009
Messages
459
Don't forget that changing things like this costs money, and with the DfT and Treasury controlling much of the railway at present, there are far more important things to spend the reducing income on, than changing a code that doesn't really matter. The way the railway seems to work nowadays, you would need to have a committee of 100 people (and half of those would be expensive consultants) to ensure that everyone agrees to the change:)
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,629
Location
Northampton
Don't forget that changing things like this costs money, and with the DfT and Treasury controlling much of the railway at present, there are far more important things to spend the reducing income on, than changing a code that doesn't really matter. The way the railway seems to work nowadays, you would need to have a committee of 100 people (and half of those would be expensive consultants) to ensure that everyone agrees to the change:)
No consultants needed for something like this. TOC would ask for the change, NR would tell them the price and then its be up to the TOC to fund it.
However from previous changes it looks like the way the code changes is that its actually replaced by a new entry, rather than updated. So there are accounting and billing repercussions.
 
Status
Not open for further replies.

Top