What exactly happened at Morpeth? I saw National Rail said signalling failure and someone above mentioned points. Do national rail cover points, signals, etc all within their 'signalling failure' category? Was it anything wind related as well?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

43095john

Member
Joined
16 Jan 2009
Messages
102
Location
UK
What exactly happened at Morpeth? I saw National Rail said signalling failure and someone above mentioned points. Do national rail cover points, signals, etc all within their 'signalling failure' category? Was it anything wind related as well?
Complete loss of all signalling that is controlled by Morpeth SB (Cramlington to Widdrington)

I was on 1W11 which was terminated at Newcastle, we went past 1S10 on the King Edward Bridge which had been sitting there for 30+ mins (and is still sitting there now). I wouldn't have been happy to have been on that just to see 1W11 allowed into Newcastle

Newcastle is carnage with a long queue already for Rail Replacement buses
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
800104 on 1W16 1200 Kings Cross - Inverness is on diesel at Newcastle ready to go via the Tyne Valley, standing room only. They clearly aren’t expecting Morpeth to reopen any time soon.

The queue outside Newcastle station for buses is by far the longest I’ve ever seen it, even during major disruption. It wouldn’t surprise me if there were well in excess of 1000 passengers in the queue. The queue is from the bus pickup outside Sainsburys, looping all the way around the outside of the station portico and the taxi rank, then into the station and on to the concourse.

At least LNER, XC and Lumo are trying their best to move people. TPE and Northern have given up.
 

Scotrail314209

Established Member
Joined
1 Feb 2017
Messages
2,475
Location
Edinburgh
Quite a lengthy queue at Edinburgh Waverley when I passed through about half an hour ago. Several Azumas and CrossCountry units scattered about the station.

Passengers instructed to join the queueing system which stretches from the East Side of the station all the way to the ramp by Platform 19.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,368
Emergency special working to be implemented by 1700, 1 x LNER per hour each direction, XC plan to run 2 northbound services only.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,532
Location
Northampton

Tetchytyke

Veteran Member
Joined
12 Sep 2013
Messages
17,562
Location
Isle of Man
Is there also a problem at Newcastle? 1E18 seems to have taken 40 minutes to get about 200 yards... https://signalmaps.co.uk/#newcastle:2993
There wasn't a technical problem when I came through at 1400, but already the station was full of abandoned Azumas. We were sat on the bridge for a good 15 minutes.

The queue for buses was enormous. The 1345 to Carlisle went past me and looked a quarter full. Go figure.

Real Time Trains reporting issues on their data feeds, so it's probably that.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
Emergency special working to be implemented by 1700, 1 x LNER per hour each direction, XC plan to run 2 northbound services only.
How long can an Azuma consist be? Even once you ran out of platform tagging more on the back might be helpful for getting empty trains into the correct place If you only have one path an hour.
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
1W16 went via the Tyne Valley, departed Newcastle in the path of the cancelled 15:40 Northern service to Carlisle.

How long can an Azuma consist be? Even once you ran out of platform tagging more on the back might be helpful for getting empty trains into the correct place If you only have one path an hour.
9 car fixed formations. Not sure about Edinburgh, but it’s definitely not possible to form an 18 car set at Newcastle as it would clog up the whole station, and in any case I’m not sure they’re permitted to work in such formations apart from to recover a failed unit.

Newcastle only has three platforms that can take a 9 car formation. An 8 car voyager has one extra platform (5/6) available. Between Platforms 2, 3, 4 and 5/6 they have to accommodate TPE too, so with a TPE and an XC set in the station there’s only space for two LNER trains. Anything beyond that either has to go back south or go to Heaton.

Lumo had an 803 dumped out of the way in P1.
 
Status