• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Future of Class 379

Status
Not open for further replies.

Ayman Ilham

Member
Joined
2 Jul 2016
Messages
462
Location
Blackburn (Lancs)
If the TP Route Upgrade is finished on time, how about TPE using the 379 on the Huddersfield stoppers to Leeds and Manchester? What about East-West Rail if they decide to electrify that from the get-go?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Ayman Ilham

Member
Joined
2 Jul 2016
Messages
462
Location
Blackburn (Lancs)
They definitely aren’t wiring it. See numerous previous discussions in the EWR threads.
Fair enough, that's ruled out then; but it won't be far-fetched for TPE to use the 379 on the Huddersfield stoppers (if the full MCV-LDS wiring completes fast enough that is), as I can see electrification work actually taking place on the MCV-Stalybridge part (pass the line regularly), which will hopefully extend to Huddersfield and Leeds.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,326
it won't be far-fetched for TPE to use the 379 on the Huddersfield stoppers
It would be far fetched. Those services are potentially due to return to Northern after electrification and they will want to use 331s on the route.
 

Chriso

Member
Joined
7 Dec 2006
Messages
526
This is ridiculous. 11-year old trains being sent for long term storage. Something has to be done about this.

I know you just despair at times. I wish the GOV would just stick their nose out of it. I bet they couldn’t even operate the Southend Pier railway successfully let alone the National network
 

Razorblades

Member
Joined
17 Dec 2021
Messages
452
Location
Copshaw Holm, Scottish Borders
This is ridiculous. 11-year old trains being sent for long term storage. Something has to be done about this.

Does it, what?

The only thing with a chance of influencing this would be a change of government, and I'm doubtful that would have any effect. No-one wants to put more assets on the national balance sheet in the present climate.
 

RailWonderer

Established Member
Joined
25 Jul 2018
Messages
2,217
Location
All around the network
Well GN were interested but the DfT said no. Surely a battery conversion program would have been greenlit? All this decarbonisation talk and white papers published yet when it comes to funding the programs the DfT goes silent.
 

Mamorin

Member
Joined
21 Sep 2020
Messages
471
Location
Cheshire
This is ridiculous. 11-year old trains being sent for long term storage. Something has to be done about this.
Nothing has to be done about this, there is no money it's as simple as that.

Your just going to have to face the reality that even though the 379s are quite young they are most likely going to be scrapped, and nothing can be done about it.

I'd take a guess and say nobody on here would want the 379s to be scrapped but as I’ve said nothing can be done about it.
 

Invincible

Member
Joined
23 Apr 2022
Messages
854
Location
Surrey
Nothing has to be done about this, there is no money it's as simple as that.

Your just going to have to face the reality that even though the 379s are quite young they are most likely going to be scrapped, and nothing can be done about it.

I'd take a guess and say nobody on here would want the 379s to be scrapped but as I’ve said nothing can be done about it.
So did the TOC at the time National Express sign a short lease contract with the leasing company which eventually turned out expensive for Anglia?.

Ideally leases should be spread over 30 years, the life of the train, to get the best lease price for the TOC?

Maybe the the leasing company will be able to get a new contact with a new TOC at a lower price to recover the remaining 20 years life left?.
 

Mamorin

Member
Joined
21 Sep 2020
Messages
471
Location
Cheshire
Maybe the the leasing company will be able to get a new contact with a new TOC at a lower price to recover the remaining 20 years life left?.
Not with the DFT calling the shots, the fact nobody needs or wants the units and there is no money they won't.
 

Razorblades

Member
Joined
17 Dec 2021
Messages
452
Location
Copshaw Holm, Scottish Borders
So did the TOC at the time National Express sign a short lease contract with the leasing company which eventually turned out expensive for Anglia?.

Ideally leases should be spread over 30 years, the life of the train, to get the best lease price for the TOC?

Maybe the the leasing company will be able to get a new contact with a new TOC at a lower price to recover the remaining 20 years life left?.

The units were purchased by Macquarie (bank) at a time when the cost of money was very high, following the 2008 stock market crash. As a result, National Express paid very heavy leasing rates at a time when it hadn't secured a long franchise; naturally, bidders for the next (current) franchise wanted rid of the expensive outliers.

The 'ideal' lease length in the free market isn't equivalent to the design life of the train, and arguably if it was, it could tie-in obsolete equipment that should be replaced by better, more efficient trains after a fraction of 30 years.

It doesn't look too likely that the 379s will be placed on lease anywhere in a hurry, more likely that they'll be disposed of in a fire-sale.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,810
Location
Cambridge
Nothing has to be done about this, there is no money it's as simple as that.

Your just going to have to face the reality that even though the 379s are quite young they are most likely going to be scrapped, and nothing can be done about it.

I'd take a guess and say nobody on here would want the 379s to be scrapped but as I’ve said nothing can be done about it.
Quite so. And there's no demand for them. The melodrama about them being scrapped "unacceptably" has been done a hundred times. We know it's a shame, now can we please move on from the outrage :lol::lol:
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,124
Location
West Wiltshire
It doesn't look too likely that the 379s will be placed on lease anywhere in a hurry, more likely that they'll be disposed of in a fire-sale.

If they are sold off cheap, but not quite as cheap as scrap value, there is a chance someone will buy them, and put them in safe storage.

Basically someone may take a calculated risk that a lot of other trains will be scrapped, there is a sudden upturn in the economy (like what happened in 1987-88) but this time following a change of Government, and they will be valuable as a quick fix to lease out. The alternative is they store them, then lose bit of money scrapping them, but not lose that much, as the current owner has taken majority of financial hit.
 

Class15

Established Member
Joined
30 Dec 2021
Messages
4,133
Location
North London or Mildmay line
I know you just despair at times. I wish the GOV would just stick their nose out of it. I bet they couldn’t even operate the Southend Pier railway successfully let alone the National network

Does it, what?

The only thing with a chance of influencing this would be a change of government, and I'm doubtful that would have any effect. No-one wants to put more assets on the national balance sheet in the present climate.

Nothing has to be done about this, there is no money it's as simple as that.

Your just going to have to face the reality that even though the 379s are quite young they are most likely going to be scrapped, and nothing can be done about it.

I'd take a guess and say nobody on here would want the 379s to be scrapped but as I’ve said nothing can be done about it.
Thanks for your replies :D

In my opinion it’s a huge waste of public money but I understand that this country is very wasteful!
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,005
Location
Surrey
Thanks for your replies :D

In my opinion it’s a huge waste of public money but I understand that this country is very wasteful!
Its not a waste of public money the units are privately owned the loss sits with Akiem as does the opportunity to cut a deal if they want.
 

Mamorin

Member
Joined
21 Sep 2020
Messages
471
Location
Cheshire
Well these are high quality units and the DfT should be moving them somewhere, I’d like to see them on LO if nothing else! More comfortable than 378s :D
A move to LO won’t happen as the 379s are AC only and LO needs DV trains.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,005
Location
Surrey
Ah right. DV 379s won’t happen as it would most likely cost too much to retofit shoes.
Physically it need six shoe beams, shoes, shoe fuses and cables to the inverter is largely all that is required. Alstom already have equivalent DV approved equivalent units so could be done. However, as i said Akiem don't do mods they are a financial engineering business that buy stock products maintained by the supplier and just collect the leasing charges.
 

TomG

Member
Joined
22 Nov 2022
Messages
38
Location
Essex
I've been on them a few times and they are quite nice. Plenty of potential for them to be used.
They (currently) have luggage racks, 2+2 seating, air con and 1st class. They have 200 seats and can reach speeds of up to 100mph.
DOO as well I think. And could be operated as 4, 8 or 12 car sets. Suitable for quite a few routes for quite a few TOC's (FTP take note!).
 

Mamorin

Member
Joined
21 Sep 2020
Messages
471
Location
Cheshire
If FTP get more trains it will most likely be more 802s since those are Bi-Modes and the 379s are AC only.
 

Sutton in Ant

Member
Joined
2 Mar 2021
Messages
256
Location
Sutton Surrey
I believe that there is a chance that if the 379s were fitted with a contact shoe for DC 3rd rail operation. Then I would think more rail operators would be interested in leasing out the 379s
 

Iskra

Established Member
Joined
11 Jun 2014
Messages
10,688
Location
West Riding
The kind of trains that could be picked up cheap and run Birmingham-Manchester or York-Edinburgh to free up XC's 22X stock for strengthening, getting rid of the HST's (I know...) and removing diesels from under the wires.
 

Iskra

Established Member
Joined
11 Jun 2014
Messages
10,688
Location
West Riding
Not necessarily

Yes, the leasing company has a void at present, but they might still not be keen to lease them out at an uneconomic rate.
I'm assuming there is a transport cost to storage, storage space cost, and still some basic maintenance costs that will be accrued to prevent them becoming unusable again. The economic incentive is to get them used, even if the lease is low it is still saving those other costs (or moving them to someone else). So, I'd suggest it's either they get leased out on the cheap, or end up scrapped fairly quicky. If the initial 10 year lease was high as suggested they might have covered their cost already (or be well on their way to doing so), so a low lease might be less of a problem.

Could another potential use be to replace some of the aging EMU stock around Glasgow?
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,326
Could another potential use be to replace some of the aging EMU stock around Glasgow?
No. They aren't what Scotrail is looking for and they have already announced other plans, which involve running the 318/320 fleet for another few years, then replacing them with something appropriate for that operation.
 
Last edited by a moderator:
Status
Not open for further replies.

Top