More issues with electrification. Losing track of how many times this has happened.
Must be some sort of design flaw at this point? Wasn't the GWML electrification vastly over specified as well (or at least that seemed to be the prevailing wisdom).
These incidents are all because of damage to the lines, not them failing on their own. You can invest as much money as you want, but at the end of the day the wires are just that, wires. If you pull them hard enough they will fall down.
We have never been given details on why they've failed down, but I would presume either accidents, or there's a design flaw with one/multiple trains on the line, which is causing them to go around pulling the lines down.
Haven't most of the problems with the OLE been between Heathrow Airport Junction and Paddington on the 90s-spec stuff (which was emphatically NOT over-specified).
There's been comparatively few failures on the stuff put in a few years ago from Airport Junction to Didcot/Newbury (has it reached Swindon yet?)
There have been a fair few failures between Airport junction and Reading, just not further on, which makes sense as service levels drop hugely.